Interim Deficiency Rept DER 83-63 Re Failure of Borg-Warner HPSI Isolation Valves to Open Against Pump a & B Flows. Initially Reported on 830920.Bechtel & C-E Conferring on Corrective Actions.Next Rept Will Be Submitted by 840306
ML20081G958
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/24/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28072-BSK, DER-83-63, NUDOCS 8311070253
Download: ML20081G958 (3)


Text

< ,

. i Arizona Public Service Company P o. BOX 21666 + PHOENIX ARIZONA 85036 [d$t

'n

' 0 C.!3!

? p"u .t n,

October 24, 1983 ANPP-28072-BSK/RQT h

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs

Subject:

Interim Report - DER 83-63 A 50.55(e) Potentially Reportable Deficiency Relating to HPSI Isolation Valves By Borg Warner Failed To Open Against HPSI

'A' and 'B' Pump Flows.

File: 83-019-026; D.4.33.2 Ref e rence : Telephone Conversation between P. Narbut and R. Tucker on September 20, 1983.

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by March 6,1984, at which time a complete report will be submitted.

I Very truly yours,

\

pcC-a CLlt \ eu,L E. E. Van Brunt, Jr.

APS Vice President, l

Nuclear Projects Management ANPP Project Director EEVB/RQT:ru Attachment i cc: See Page Two f-8311070253 831024 PDR ADOCK 05000528 S PDR \

\ -

JE-??

W Mr. T. W. Bishop .

DER 83-63 Page Two i

cc: Richard DeYoung Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr

{ W. J. Stubblefield i W. G. Bingham

R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 I

l 1

i 1

T e

  • INTERIM REPORT - DER 83-63 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1 & 2 I. ' Potential Problem While attempting to open valves SIA-UV-617, SIA-UV-627, SIA-UV-637, SIA-UV-647, SIB-UV-616, SIB-UV-626, SIB-UV-636, and SIB-UV-646 against HPSI "A" & "B" pump flows the valves would not open. The valves torqued out immediately af ter the bypass switch opened.

The eight (8) High Pressure Safety Injection Isolation valves are Borg Warner Model No. 77620-2 and were supplied by C-E.

II. Approach To and Status of Proposed Resolution Bechtel engineering is corresponding with C-E to provide reportability and technical justification for corrective action.

III. Projected Completion of Corrective Action and Submittal of Final Report 5 Evaluation of this condition and submittal of the Final Report is forecast to be completed by March 6,1984.