ML20081G946

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-57 Re Cracks in Control Element Assembly Shroud.Initially Reported on 830729. Final Rept Expected by 840309
ML20081G946
Person / Time
Site: Palo Verde  
Issue date: 10/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28093-BSK, DER-83-57, NUDOCS 8311070248
Download: ML20081G946 (2)


Text

.

8 Arizona Public Service Company

!?y

[

P.o. BOX 21666 e PHOENIX, ARIZONA 85036 h

} W / f3/

October 26, 1983

,I ? '

U. S.-Nuclear Regulatory Commission Region V Creekside Oako Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-57 A 50.55(e) Potentially Reportable Condition Relating To Cracks In The Control Element Assembly Shroud File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between P. Johnson and R. Tucker on July 29, 1983 (B) ANPP-27598, dated August 29,1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),

it uns estimated that a Final Report would be available by i

At that time, October 27, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 9, 1984, at which time a complete report will be submitted.

l There is no new information or change to the Interim Report at this time.

Very truly yours, j

? 2.

au l

a E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr/RQT:ru cc: See Attached Page 2 l

l l

8311070248 831026 PDR ADOCK 05000528 i

S PDR ID NN

L c

Mr. T. W. Bishop DER 83-57 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D..C.

20555 T. G. Woods, Jr.

G. C. Andognini J.*A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R.. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 i