Interim Deficiency Rept DER 83-65 Re C-E Primary Pressure Safety Valves Found in Poor Condition.Initially Reported on 830928.Evaluation Continuing.Final Rept Will Be Submitted by 840203
ML20081G903
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28097-BSK, DER-83-65, NUDOCS 8311070238
Download: ML20081G903 (3)


Text

'

o qp E 5vio p"u,'

Arizona Public Service Company P O. Box 21666

  • PHOENIX. ARIZONA 85036 03CCI3l r" 3 a C r.r..

October 26, 1983~

ANPP-28097-BSK/RQT

~

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 C,

Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs

Subject:

Interim Report - DER 83-65 A 50.55(e) Potentially Reportable Deficiency Relating to PSV'S From CE Were Discovered in Poor Condition When Preparing For Unit 2 Cold-Hydro.

File: 83-019-026; D.4.33.2

Reference:

Telephone Conversation between P. Johnson and R. Tucker on September 28, 1983.

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by February 3,1984, at which time a complete report will be submitted.

Very truly yours, i

p. e d,

OLLt.

"A(D E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EE7B/RQT:ru At tachment i

cc: See Page Two I

8311070238 831026 PDR ADOCK 05000529 S

PDR ~

ll qs97 i

t ye Mr. T. W. Bishop DER 83-65 Page 2 cc:

Richard DeYoung, Director Office -of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel-4-

D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 i

Atlanta, Georgia 30339 I

1 i

i

'_,.o 1

INTERIM REPORT - DER 83-65 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 2 I.

Potential Problem While preparing for cold hydro testing on PVNGS Unit 2, the primary Pressure Safety Valves (PSV) were removed. Inspection of valves revealed they were dirty, rusted and coated with condensation throughout the internals. The valves were identified by tag numbers 2J-RCE-PSV-200, 201, 202, and 203. The valves were supplied by Combustion Engineering.

II.

Approach To and Status of Proposed Resolution Bechtel engineering is corresponding with C-E to provide

' reportability disposition and technical justification for corrective action.

III.

Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is j

forecast to be completed by February 3,1984.