TABLE 3.3-10 (Continued)
ACTION STATEMENTS (Continued)
ACTION 4 -
a With the number of channels less than the minimum channels required, initiate an alternate method of monitoring containment area radiation within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and either restore the inoperabl. channel (s) to OPERABLE status within 7 days, or prepare and submit a special report to the Commission pursuant to Specification 6.9.2.1 within 14 days that provides actions taken, cause of the inoperability, and plans and schedule for restoring the channels to OPERA 8LE status, b.
The provisions of Specification 3.0.4 are not applicable.
ACTION 5 - NOTE:
Also refer to the applicable action requirements from Table 3.3-9 since it may contain more restrictive
- actions, a.
With the number of channels on one or more steam generators less than the minimum channels required for either flow rate or valve position, restore the inoperable channel to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, b.
With the number of channels on one or more steam generators less than the minimum channels required for flow rate and valve position, restore the inoperable channel (s) to OPERABLE status within 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The provisions of Specification 3.0.4 are not applicable.
ACTION 6 -
a.
With the number of channels less than the minimum channels required, restore the inoperable channel to OPERABLE status within 7 days or increase by one the minimum shift crew per Table 6.2-1.
The additional shift crew member shall be dedicated to and capable of determining the subcooling margin during an accident using existing instrumentation, b.
With the number of channels two less than the minimum channels required, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or increase by one the.
minimum shift crew per Table 6.2-1.
The additional shift crew member shall be dedicated to and capable of determining the subcooling margin during an accident using existing instrumentation.
c.
The provisions of Specification 3.0.4 are not applicable, bg61ggggg 'ljgg[j7,7 p
PDR SEQUOYAH - UNIT 1 3/4 3-57a Amendment No. 112, 149
TABLE 3.3-10 (Continued)
ACTION STATEMENTS (Continued)
ACTION 4 -
a.
With the number of channels less than the minimum channels required, initiate an alternate method of monitoring containment area radistion within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and either restore the inoperable channel (s) to OPERABLE status within 7 days, or prepare and submit a special report to the Commission pursuant to Specification 6.9.2.1 within 14 days that provides actions taken, cause of the inoperability, and plans and schedule for restoring the channels to OPERABLE status, b.
The provisions of Specification 3.0.4 are not applicable.
ACTION 5 - NOTE:
Also refer to the applicable action requirements from Table 3.3-9 since it may contain more restrictive
- actions, a.
With the number of channels on nne or more steam generators less than the minimum channels required for either flow rate or valve position, restore the inoperable channel to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, b.
With the number of channels on or.e or more steam generators less than the minimum channels required for flow rate and valve position, restore the inoperable channel (s) to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The provisions of Specification 3.0.4 are not applicable.
ACTION 6 -
a.
With the number of channels less than the minimum channels required, restore the inoperable channel to OPERABLE status within 7 days or increase by one the minimum shift crew per Table 6.2-1.
The additional shift crew member shall be dedicated to and capable of determining the subcooling margin during an accident using existing instrumentation.
b.
With the number of channels two less than the minimum channels required, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or increase by one the minimum shift crew per Table 6.2-1.
The additional shift crew member shall be dedicated to and capable of determining the subcooling margin during an accident using existing instrumentation, c.
The provisions of Specification 3.0.4 are not applicable.