Text
e su Southern California Edison Company
$5 S AN ONOFRE NUCLE AR GENER A TING ST ATION P.O. BOR 128 S AN C LEMENTE. C A LIFORNI A 92672 October 21, 1983 P-U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 m
Attention:
Mr.-J. B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket No. 50-362 Correction to 14-Day Follow-Up Report Licensee Event Report No.83-073 San Onofre Nuclear Generating Station, Unit 3
Reference:
Letter, J. G. Haynes (SCE) to J. B. Martin (NRC),
dated October 17, 1983 The referenced. letter provided the 14-Day Follow-Up Report and a copy of the Licensee Event Report (LER) form for a reportable occurrence involving the operability of the charging pumps.
As
- was discussed with the Senior Resident Inspector on October 19, 1983, correction of the content of the referenced letter is required.
r The third paragraph of the second'page of the referenced letter describes the cause of the reported occurrence and indicates that although-a revision to the Abnormal Valve Lineup Procedure SO23-0-36 had been issued, training in the revision had not been provided and, consequently, the Abnormal valve Lineup section of Procedure SO23-0-13 had not been revised to refer to SO23-0-36.
The Abnormal Valve-Procedure, SO23-0-36, referred to is the original. issue of the procedure on September 13, 1983, rather j
than a revision as was indicated.
In addition, although our administrative processes can provide for a specified delay in the effectiveness of procedures until training has been accomplished, in this case, our administrative process was not implemented to provide for a specified delay in revision of S023-0-13 until training was accomplished on_SO23-0-36.
[6 ;O b g DJ tu fD$ ol&$lg "
su PDR 03M303,,.
f6 M
- c
- Mr. J. B. Martin October 21, 1 983
-If there are any questions concerning this correction, please contact-me.
Sincerely, h
M
^
J. G. HAYNES STATION MANAGER cc:
A.E. Chaffee.(USNRC Resident Inspector, Units 1, 2 and 3)