RO 83-073:provides Correction to Content of Providing Rept on Operability of Charging Pumps
ML20081F883
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/21/1983
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
RO-83-073, RO-83-73, NUDOCS 8311040022
Download: ML20081F883 (2)


Text

e su Southern California Edison Company S AN ONOFRE NUCLE AR GENER A TING ST ATION

$5 P.O. BOR 128 S AN C LEMENTE. C A LIFORNI A 92672 October 21, 1983 P-U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 m Attention: Mr.-J. B. Martin, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-362 Correction to 14-Day Follow-Up Report

. Licensee Event Report No.83-073 San Onofre Nuclear Generating Station, Unit 3

Reference:

Letter, J. G. Haynes (SCE) to J. B. Martin (NRC),

dated October 17, 1983 The referenced. letter provided the 14-Day Follow-Up Report and a copy of the Licensee Event Report (LER) form for a reportable occurrence involving the operability of the charging pumps. As

- was discussed with the Senior Resident Inspector on October 19, 1983, correction of the content of the referenced letter is r

required.

The third paragraph of the second'page of the referenced letter describes the cause of the reported occurrence and indicates that although-a revision to the Abnormal Valve Lineup Procedure SO23-0-36 had been issued, training in the revision had not been provided and, consequently, the Abnormal valve Lineup section of Procedure SO23-0-13 had not been revised to refer to SO23-0-36.

The Abnormal Valve-Procedure, SO23-0-36, referred to is the original. issue of the procedure on September 13, 1983, rather j than a revision as was indicated. In addition, although our administrative processes can provide for a specified delay in the effectiveness of procedures until training has been accomplished, in this case, our administrative process was not implemented to provide for a specified delay in revision of S023-0-13 until training was accomplished on_SO23-0-36.

[6 ;O b g DJ tu fD$ ol&$lg " su 03M303,, .

PDR ,

f6 M

c
  • Mr. J. B. Martin October 21, 1 983

-If there are any questions concerning this correction, please contact-me.

Sincerely, h M ^

J. G. HAYNES STATION MANAGER cc: A.E. Chaffee.(USNRC Resident Inspector, Units 1, 2 and 3)

J.P. Stewart (USNRC Resident Inspector, Units 2 and 3)

U.S. Nuclear-Regulatory Commission Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Division of Technical Information and Document Control Institute of Nuclear. Power Operations (INPO)

?