PROPOSED TECHNICAL SPECIFICATION CHANGES l
1 l
1 1
i
- Ba32gggg;gggggge P
}+
3/4.3 INSTRUMENTATION
- 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1.1 As a minimum, the reactor protective instrumentation channels and bypasses ~of Table 3.3-l'shall be OPERABLE with RESPONSE TIMES as shown in Table 3.3-2.
APPLICABILITY: As shown in Table 3.3-1.
ACTION:
As shown in Table 3.3-1.
SURVEILLANCE REQUIREMENTS 4.3.1.1.1 Each reactor protective instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-1.
4.3.1.1.2 The logic for the bypasses shall be demonstrated OPERABLE prior to each reactor startup unless performed during the preceding 92 days. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.1.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit at least once per 18 months.
Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function as shown in the " Total No. of Channels" column of Table 3.3-1.
4.3.1.1.4 The Core Protection Calculator System shall be determined l
OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that less than three auto restarts have occurred on each calculator during the past 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.3.1.1.5 The affected Core Protection Calculator Channel shall be subjected to a CHANNEL FUNCTIONAL TEST to verify OPERABILITY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of receipt of a valid CPC Cabinet High Temperature alarm.
1 l
ARKANSAS - UNIT 2 3/4 3-1 Amendment No. G4,441 l
l
--- -- I
4
(
MARKUP OF CURPENT ANO-2 TECHNICAL SPECIFICATIONS (FOR INFO ONLY) i
3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRI~TENTATION LIMITING CONDITION FOR OPERATION 3.3.1.1 As a minimum, the reactor protective instrumentation channels and bypasses of Table 3.3-1 shall be OPERABLE with RESPONSE TIMES as shown in Table 3.3-2.
APPLICABILITY: As shown in Table 3.3-1.
ACTION:
As shown in Table 3.3-1.
SURVEILLANCE REQUIREMENTS 4.3.1.1.1 Each reacL'r protective instrumentation channel shall be demonstrated OPERU LT
'y the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and Ch?,b.E FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-1.
4.3.1.1.2 The logic for the bypasses shall be demonstrated OPERABLE prior to each reactor startup unless performed during the preceding 92 days. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATICH testing of each channel affected by bypass operation.
4.3.1.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit at least once per 18 months.
Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function as shown in the " Total No. of Channels" column of Table 3.3-1.
'.3.1.1.'
Oclaedr 4.3.1.1 16 The Core Protecticr: Calculator System shall be determined OPERABLE at least once per 1l' t>urs by verifying that less than three auto I
restarts have occurred on each calculator during the past 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.3.1.1.56 The affected Core Protection Calculator Channel &yetem shall be l
subjected to a CHANNEL FUNCTIONAL TEST to verify OPERABILITY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of receipt of a valid Hkgh-CPC CabinetRoom Hich Temperature alarm.
l l
l ARhANSAS - UNIT 2 3/4 3-1 Amendment No. G4,-1M l
.0
'. 4-e t T m i=f #= Dr M T.*At ? ? M flukA. Dies.We E9 f p's _ _ E..J _..
.J. t wa e sa.,y v
. s r=
w g-w..
...ww p
9 I
i t
- 'e___
p
_g__
_L 11 j_h_j
__J 1.
- 1.. Ew
- m. L. -
ww..,
h._.w_&.._L..J__w..
e,,w 1.._. w,1 _ g.www. wy.
w..
L._
w....ww j S www w
w.w.
_m w.
,e
-w
.w mw
- w.. w w gw.
....r w wt_..__
L..
.. _ _,,.., _ _. t.w_ mw
.w-___
- a. L.i..
.t.._v_w_
_..mw_
w.
aw g v w... g...y J..
y =. w w L._.. _-.r.
___a.
19
___.___J
___L 1
w-.
-z__
m L. w_
=i6_..=-
L..w_.._ww
-ww-..ww w..
www..
w w.1 _..w w..m.
- a. _ _
___6
...y
.w.
n._ v_ s _ _ aA. w_ _. r=._.1
- 1. =_= s _ _.e, g, a. __
L.- w_ _..L., j w_ w_ a _ Jw w we
=w
_L_11 a
A_
A. w 1.
- 1.. E S
mL.
r=___
wwwwm w
wu
=w.
.._w w.v i
w e eaw ww.w wa-w v a
.._.. g w
vv.w w
ws w.s
___2 a
cu,m ttive.v en t.if em e n.st.a v.,
menem
=w v w a.s.. A n.e n m n t.t.v e. u.
.. J s.L..J._s
.L.w_..
e a_
19 www.y-
- w. a wiw.
.wJ _' L w
.. = 1. 2 Jm U. e I y.
-=
- w. v M. ww_ w_ _im. w_ _,7 w.
- a... _ _w.w w.
r= ne o
i
?
t i
b 1
I v.
i 1
k i
h i
I f
i l
1 l
.l l
zw e ti. i e a 9
5 / A.
- _ 1. w..
.m - _ _ J.nw_ _s w aiw.
.M.A g A 1
- nw a a w a 6 it _
1 v S
e eRe w tT m.
wa l
.