/03L-0:on 830930,APRMs 2,3,4 & 5 Gain Adjustment Factor Exceeded Tech Spec Requirements.Caused by Failure to Follow Shutdown Procedures.Personnel Involved Reinstructed Re Adherence to Procedure
ML20081F848
Person / Time
Site: Dresden Constellation icon.png
Issue date: 10/27/1983
From: Bergan G, Scott D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
83-1039, LER-830-036-03L, LER-830-36-3L, NUDOCS 8311040005
Download: ML20081F848 (3)


Text

. - - _ _ _

CO,NTRCL SLCCX: l l

l l

I l

l (PLEASE PRINT CR TYPE ALL RECUtRED INFORMATICN) l 6

' 3 l t l l l l L l D l R l S 13 j@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l-l0 l0lgl4l1l1 l1 l1 lg l

[g 3 9 UCENSEE CODE 14 iS uCENs4 NuMSER 25 26 UCENSE TYPE JG 57 CAT 54 l CCN'T

)oItJ 3;g,"# lL @l0l 51010l0l2l4l9 @l01913 l0 l 8 l 3 @l1 l0 l2 l 7l 8 l 3 l@

"8#C f

3 60 63 GCCXET NUMBER 6a 69 EVENT CATE 74 75 REPCRT CATE 40 CVENT CESCRIPTION AND PRCSA8LE CCNSECUENCES h 6o62I l During a normal unit shutdown, the APRM gain adjustment factor (AGAF) for APRM's 2, 3, l

l i o 131 14 and 5 exceeded 1.03 Because both scram channels had less than the minimum numbel of l.

o i A; joperable APRM channels, Tech Spec Table 3.1.1 action B was invoked.

Power was already in l l

lo esi i 1RM range.

Safety significance was minimal since IRM's were fully inserted and opera-g 1loisI itional.

There was no effect on health or safety of the public.

This is first reported g

o l 7 ] joccurrence of this type.

0edl I l

ss so SYSTEM CAUSE CAuSE COMP.

vat.V8 CecE cocE-suscocE cOMPCNENT CCDE SUSCOCS SUSCQQS o49I l Il C l@ l Al@ l A l@ ll lN lS l T l R! U l@

l Ql@ l Z l @

s e

to in 12 33 is is zo SEcuENTIAL CCOURRENCE REPCRT REVISICN LIR EVENTYEAR REPQRT NO.

CCCS TYPE NQ.

@,ag/RO

[_8 l 3 l l-l l 0 l3 l6 l y

l0l3l l Ll.

l-l l0l 25 22 23 24 26 27 23 23 30 3:

32 AC C P T

METH HCURS

$8 I FORf S.

P UE M OF RER l X Igl Hlg l5Zl@

l Zl@

l0l0l0l0l lNl@

l N I@

lNl@

lG l0 l8 l0 l@

33 34 3

06 37 40 4:

42 43 44 47 CAuSE DESCalPTICN AND CCRRECTIVE ACTICNS h itoll The event was caused by failure to follow shutdown procedure DGP 2-1 Which reouires an 1

itill instrument mechanic be ' utilized for gain adjustments.

Routine shutdown continued and I

i621 l compliance with Tech Specs was achieved within an hour.

The personnel involved will

(

.,3, l be re-inst ructed regarding adherence to this procedure, j _

i4i l I

a s so

% PCW8R CTHER STATUS Of RY CISCOVERY DESCRIPTION I u l l D l@ l 0] 1 l 7 l@l N/A l

l Al@l Operator Observation l

a, ig i2 is 44 46 g

so AMCUNTCP ACTIVITY @ l LOCATION CP REl. EASE @

c.EtaAsEo l 6 l l Z l @Cp ast.aASEl Z lgl N/A l

N/A l

rERsCNNEt. EXPC31 ES oEscRtPT1cN@

NuneER rvPs

? 71 l 0 l 0 l 0 l@l Zl@l N/A l

IIR$CNN t.' WJU' IES NUMSE l i l l 0 l 0 lR0 lglCEscRtPTICN N/A l

ces Os CR oNACs ro *ActuTv @

8311040005 831027 9

Tws CEscRiPTtCN PDR ADOCK 05000249

/

3 l2l@l N/A S

PDR M

l 8 9 to IS:UE E catPT1CN E I N U@l N/A l

lIIlIlllll l!l$'

4 9 to 68 69

80. E ergan (815) 942-2920 x529

!)

o NAME CF PREPARER PHCNE:

yf.

j' MM Q'm

[

g, ') Droeden Nuclear Power St; tion

O R.R. #1

(

,\\

Morris, Illinois 60450

\\

Telephone 815/942-2920 October 27, 1983 DJS.Ltr #83-1039 James G. Keppler, Regional Administrator

~ Region 111

U.S. Nuclear Regulatory Comaission 799 Roosevelt Road Glen Ellyn, IL 60137 Reportable Occurrence Report #83-36/03L-0, Docket #050-249 is being submitted to your office In accordance with Dresden Nuclear Power Station Technical Specification' 6.6.B.2.(b), conditions leading to operation in a degraded mode permitted by a. limiting condition for operation or plant shutdown required by a 1imiting condition for operatlon.

M D.. Scott Station Superintendent Dresden Nuclear Power Station l-DJS/kJ1 Enclosure cc: Director of Inspection & Enforcement Director of Management Information & Program Control U.S. NRC, Document Management Branch File /NRC U

6 J

@/ cmm::nw=lth Edisen

,.'a DEVIATION REPORT

)C V";No 12.

- 3 33 -

72 STA UNIT YEAR NO.

P ART 1 l-TITLE OF,Dt.eATION OCCURREO 9/30/83 2314 U-3 APRM Gains Greater Than 1.03 cart rivr SYSTEM AFFECTED 0700 PLANT STATUS AT TIME O/ EVENT TESTING Run 428 0

MOCE

, p,a gy,7 3

, togggy,g3 y

CESCRIPTION OF EVENT g

was 1.153, APRM #3's gain was 1.122, APRM #4's gain was 1.102 and APRM #5's gain was 1.156.

Since the unit was coming down for the refueling outage, action B from Table 3 1.1 of the Tech Spec was followed by reducing power level to IRM range and olacina mode switch in the startup/ hot standby position within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

10 CFR50.72 NRC RED PHONE C

NOTIFICATION MADE YES NO EOUIPMENT FAILURE N/A OYES O NO

.ORx ReOuEsT NO.

aEsPcNsietE suPERvisO, Gary L. N G IMM g,rg P ART 2 l OPER ATI NG ENGINEER'S COMMENTS The unit was placed in a condition where the APRM's were not required. The APRM gains will be adjusted, as required, prior to the unit startup after the current refueling outage.

O EVENT OF PUBLIC I N TE R E ST O 24* HOUR NRC NOTIFICATION REO'D O TECH. SPEC. VIOLATION TELEPH REGION III DATE TIME O NON REPORTABLE OCCURRENCE TELEGM/TELECOPy N/A O 14 OAY REPORTABLE /T.S.

REGION ll1 DATE TIME G 30 DAY REPORTAstE/T.S 6.6. B. 2.b CECO CORPOR ATE NOTIFIC ATION MADE O ANNUAL /SPECL REPORT REQ'O IF ABOVE NOTIFICATION IS PER IOCFR21 A.I.R.

] 5-DAY WRITTEN REPORT REC'D PER 10CFR21

,83-36/03L-0 Telecopy L.E.R.

gg Dennis P. Galle 10/20/83 1359 CECO CORPORATE CFFICE9 DATE TIME PRELIMINARY REPORT T.A. Ciesta 10/20/83 COMPLETED AND REVIEnED WMING ENGINEER DATE E E Y T T ON R c2e L,

iOkA 3

a

[

g[

[ L7 RESOLUTION APPROVED AND 1

AUTHORIZEO FOR OISTRIBUTION

. STATl 5