b EMER'ENCY CORE COOLIN1 SYSTEMS s

SURVEILIANCE REQUIREMENTS (Continued) f.

By verifying that each of the following pumps develops the indicated' differential pressure on recirculation flow when tested' pursuant to Specification 4.0.5:

1.

High-Pressure Safety injection pump 2 1360.4 psid with 90'F water.

2.

Low-Pressure Safety Injection pump 2 156.25 paid with 90'F water.

g.

At least once per 18 months by verifying the correct position of each electrical and/or mechanical position stop for the following ECCS throttle valves:

LPSI System Valve Number a.

2CV-5037-1 b.

2CV-5017-1 c.

2CV-5077-2 d.

2CV-5057-2 h.

By performing a flow balance test, during shutdown, following completion of modifications to the ECCS subsystem that alter the subsystem flow characteristics and verifying the following flow rates HPSI System - Single Pump LPSI System - Single Pump The sum of the injection line a.

Injection Leg 1, 2 1059 gpm flow rates, excluding the b.

Injection Leg 2, 2 1059 gpm highest flow rate is greater c.

Injection Leg 3, 2 1059 gpm than or equal to 570 gpm.

d.

Injection Leg 4, 2 1059 gpm i

i I

I ARKANSAS - UNIT 2 3/4 5-5 An.endment No. M,448,4%

9503220282 950317 PDR ADOCK 05000368 P

PDR

4 e

+

e

+

MARKUP OF CURRENT ANO-2 TECH.NICAL SPECIFICATIONS (FORINFO ONLY) i l

t

'. EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) i f.

By verifying that each of the following pumps develops the

)

i indicated differential pressure on recirculation flow when tested pursuant to Specification 4.0.5:

1.

High-Pressure Safety Injection pump 2 1360.4 psid with 90*F water.

i 1

2.

Low-Pressure Safety Injection pump 2 156.25 paid with 90'F water.

g.

At least once per 18 months by verifying the correct position of

]

each electrical and/or mechanical position stop for the following ECCS throttle valves l

NFS! Sy;tz:

LPSI System j

V:1: P" '::

Valve Number i

i 1

2CV-5025-1 a.

2CV-5037-1 h.

2CV-5015 1 b.

2CV-5017-1 2CV-5075-1 c.

2CV-5077-2 i

d.

2CV 5055 1 d.

2CV-5057-2 e-,_ene,_,

5_;;';_;

1 T

~;5 ;;;; ;

l Z. '

h.

By performing a flow balance test, during shutdown, following completion of modifications to the ECCS subsystem that alter the subsystem flow characteristics and verifying the following flow 1

rates:

HPSI System - Single Pump LPSI System - Single Pump The sum of the injection line a.

Injection Leg 1, 2 1059 gpm flow rates, excluding the b.

Injection Leg 2, 2 1059 gpm highest flow rate is greater c.

Injection Leg 3, 2 1059 gpm than or equal to 570 gpm.

d.

Injection Leg 4, 2 1059 gpm l

ARKANSAS - UNIT 2 3/4 5-5 Amendment No. M,-144,M6

-.