ML20081F320

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Rept of 1990/91 Inservice Insp at Brunswick Steam Electric Plant Unit 1. Exams Performed from 890410-910507 to Satisfy Portion of Periodic Second Insp Interval Requirements
ML20081F320
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/01/1991
From: Floyd S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081F325 List:
References
NLS-91-136, NUDOCS 9106070313
Download: ML20081F320 (2)


Text

., . . . . - . . - . - -. -- - - . . . . - . - - - . .~ -.-~ -~..- - - ..-

l

.CP84 Carolina Power & Light Company 1

i 1

I

=JUN 011991 1

l SERIAL: NLS-91-136 '

10 CFR 50.55a United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 1 DOCKET NO. 50 325/ LICENSE NO. DPR 71 1 IN-SERVICE INSPECTION REPORT UNIT-1 l Gentlemen:

In accordance with the reporting requirements _of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6220(b), Carolina Power & Light Company hereby submits the Brunswick Steam Electric Plant Unit-1 in service inspectinn  !

results. These examinations,. performed from April 10, 1989 to March 7, 1991, l were done to satisfy _a portion of the periodic second inspection interval-requirements using Section XI, 1980 Edition through Winter 1981 Addenda.

Please refer any questions regarding this submittal to Mr. William R. Murray L. at (919) 546-4661.

Yours very truly, S. D. Flo'd Manager Nuclear. Licensing Section WRM/wrm. (bir7nisl. doc)

Enclosure ec: Mr. S. D. Ebneter Mr. N. B, Le Mr. R. L. Prevatte Mr. Billy Walker N.C. Department of Labor Boiler.& Pressure Vessel Division 214-West Jones Street

'Raleigh, NC 27603

)

i 9'E.h44 . p _

~

4ti rayenevote sveet . P o ou mi e naiegn N c mov

(

9106070313.?!0601 i

()

~

jDR ADOCK 05000325 (

PDR

A - Au d-1 173 Text

_ TORM NIS-1 OWNERT REPORT FOR INSERVICE INSPEctlONS 73 Isometries As required by the Protisions of the ASME Code Rules ~ 212 NIS-2 Sheets -

kS9 Total Sheets

1. Owner Carolina Power & Light Company P.O. Box 1551. Raleigh. NC 27602 (Name and Address of Owner)

L Plant Brunavick Steam Electric Plant, P.O. Box 10k29 Southport. NC 28h61 (Namt and Address of Plano

3. Plant Unit 1 4, Ow ner Certificate of Authoritation (if required) N/A ___
5. Commercial Service Date __3/18/77 0. N ttsor.al Board Numlier for Unit NB#3901 (RPV)
7. Components inspected Manufacturer Component or Manufacturer or installer State of National Appurtenance or Installer Serial No. Province No. Board No.

RPV GE N/A NC 139817 NB 3901 Class 1 PTpins GE/ Brown and Root /

Kellogg . N/A N/A N/A Class 2 Pipins Kellogg/ Brown and R $ N/A N/A N/A Note: Supplemer'tal sheets in form of hsts, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in,,

C) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and

! the number of sheets is recorded at the top of this torm.

l (12/s2) T>is Form IE00029) may oe octa,ned f >om the Order Dept.. ASME,345 E. 47th St.. New York. N110017 l . .__ -- - - - - - --

FORM NIS 1 (Itack)

8. laamination DatesA,ptil 10 198QoMarch7,1994. Inspection Intenat from 7/10/86 ,o 7/9/96 10 Abstract of l'xarmnations. Include a list of examination
  • and a statement concerning status of work required for current mierval. See attached Section 2 . 0 , 3 . 0 , 14 . 0 , 5 . 0 , 6 . 0 , 7 . 0 , & 8 . 0
11. Abstract of Conditions Noted See attached Section 6.0
12. Abstract of Corrective Measures Recommended and Taken See attached Section 6.0 We certify that the statements made in this ref ert are correct and the examinations and correctne mea-sures taken conform to the rules of the A55ti Code, Secto n Al.

Certificate of Authonzation No, ttf applicabic, N/ A _ _. _ t=piration Date N/A Date (

/

19 .[]_ _ Signed __ h Ci By Ow ner Jack pencer General Manager CERTIFICATE OF INSERVICE INSPECTION 1, the ar.J theundersigned, holdmg State or Pronnce ofaNorth vahd Caroline, commaston issued oy t le N itional liartf'rd Board of Boiler an! Boller team Presdute Vessel inspecto

,nd emplo) ed by og liartford, Connecticut eeted the components described in this Owner's Report dunns the period M d /_8_f to -

, and sta:e that to the best of m) knowledge and behef, the Oaner has performed eurmnations and takers corrective measurcs desenbed in this Owner's Report in accordance with the requireraents of the AShlE Code,Section XI, By signing this certificate neither the inspector not hs employer makes an) warrtnty, expressed of imphed.

concernmg the euminations and correctne measures desenbed in tha Owner's Report, Furthermore, neither the inspector nor his emplo)er shall be liable in any manner for any persoralinjury of property damage or a loss of any kmd ans g from or e neeted with this inspection, AL _.

I , tor' agnature Commissions __ h National Board, State, Provmce, and Endorsements Date _k/V s l

l

! (12'821 l

l