ML20081D866
| ML20081D866 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/28/1995 |
| From: | Hutchinson C, Lin S ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-95-00030, GNRO-95-30, NUDOCS 9503210048 | |
| Download: ML20081D866 (5) | |
Text
.
rnt:cy oper-ti:ne,in2.
" " ENTERGY eo eox 756 4
Pvt Gibson,MS 39150 l
Tel 601437 2800 C. R. Hutchinson veo Pmsoent Orcr3fors Grard OJf Nuckar Swm March 15, 1995 U.S. Nuclear Regulatory Commission i
Mail Station P1-137 Washington, D.C. 20555
- Attention:
Document Control Desk j
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO45/00030
- Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit i for Feburary 1995.
In the December 1994 Monthly Operating Report, the year-to-date Gross Thermal Energy Generated (MWH) was reported incorrectly, it should be reported as 31,025,924 MWH.-
If you have any questions or require additional information, please contact this office.
Yours truly, 7
/
frMC attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page) l l
\\
I 9503210048 950228 l
PDR ADOCK 05000416 q
i R
/
l I
i
)
b
e r
March 15., 1995 GNRO-95/00030 Pag'e 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (wlo).
Mr. Stewart D. Ebneter (w/a).
Regional Administrator
- U.S. Nuclear Regulatory Commission Region ll 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 -
Mr. P. W. O'Connor, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C'. 20555
Att: chm 2nt 1 to GNRO-95/00030 DOCKET NO 50-416 DATE 03/08/95 COMPLETED BY S. D. Lin TELEPHONE 1801) 437-6793
- QPERATING STATUS 1.
Unit Name: GGNS UNIT 1
]
2.
Reporting Period: Februarv 1995 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): _1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr to Date Cumulatiya
- 11. Hours in Reporting Period 672 1.416 90.832
- 12. Number of Hours Reactor was Critical 672.0 1.416.0 74.567.1
- 13. Reactor Reserve Shutdovvn Hours 0
0 0
14 Hours Generator On Line 672.0 1.416.0 71.762.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.587.824 5.402.400 254.245.895
- 17. Gross Electrical Energy Generated (MWH) 838.602 1.768.524 81.090.023
- 18. Net Electrical Energy Generated (MWH) 805.321 1.698.643_.
77.684.784
- 19. Unit Forvice Factor 100.0 100.0 81.1
- 20. Unit Availability Factor 100.0 100.0 81.1
- 21. Unit Capacity Factor (Using MDC Net) 104.9 105.0 78.8
- 22. Unit Capacity Factor (Using DER Net) 95.9_
98.0 71.6
- 23. Unit Forced Outage Rate 0.0 0.0 6.3
- 24. Shu' downs Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelino Outage # 7 beginnino on 04/15/94 6 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> for a duration of 39 davs
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
AttichmInt 2 to GNRO-95/OOO30 j
'. (
~
DOCKET NO 50-418 DATE 03/08/95 COMPLETED BY S. D. Lin TELEPi!ONE 1801) 437-8793 4
5 MONTH February 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) '
1 1200 17 1209 2
1193 18
'1198 3.
1195 19 1200 4
1197 20 1198 5
1210 2i 1200 6
1211 22 1200 7
1207 23 1189 8
1214 24 1202 9
1208 25 1202 10 1180 26 1198 11 1204 27 1187 12 1216 28 1197 13 1212 29 N/A 14 1200 30 N/A 15' 1178 31 N/A 16 1156 t
u-
.n.;.-
- to GNRO-95M0530.
- UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-486 UNITNAME GGNS Unit 1 DATE 03M45 COMPLETED BY S. D. Lin TELEPHONE (60lM37-6793 REPORT MONTH February 1995 No.
Date Type (1)
Duration Reason Method Of Licensee System Code Component Cause & Corrective Action To 1'ours (2),
Shutting Down Eyent Report #
(4)
Code Prevent Recurrence (C&CA)
Reactor (5)
(3) lNone l
1 2
3 4
5 F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)
II-Other (Explain)
- - =
-