Forwards Quad Cities Simulator Four Yr Certification Rept, Mar 1995. Rept Summarizes Simulator Testing Performed Since Plant Simulator Certified 910326 & Describes Simulator Testing Scheduled Until Next NRC Rept in Mar of 1999
ML20081C278
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/09/1995
From: Kraft E
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20081C281 List:
References
ESK-95-032, ESK-95-32, NUDOCS 9503170189
Download: ML20081C278 (3)


Text

.....

O* Commonwealth Edison Quad Cities Nuclear Power Station 22710 206 Avenue North Corcova, Illinois 61242 Telephone 309/854-2241 ESK-95-032 March 9,1995 Director, Office of Nuclear Reactor Regulation ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Quad Cities Simulator Four Year Certification Report The Quad Cities Simulator is owned and operated by Comed and Iowa Illinois Gas and Electric Companies for the training and testing of Quad Cities Nuclear Power Plant Operators. Because of the near duplication between the two Quad Cities Units, the simulator models Unit One with Unit One being considered the reference plant. The simulator was constructed by Link-Miles Simulation Corporation and was declared ready for training in April 1990.

The Quad Cities Simulator is used to conduct NRC Licensing Examinations and is therefore required to meet the criteria established in 10CFR55.45. A report identifying simulator testing status must be submitted to the commission every four years on the anniversary of the simulator certification. The Quad Cities Simulator was certified March 26,1991.

This report summarizes the simulator testing performed since the last certification report submitted to the NRC and describes the simulator testing scheduled until the next NRC report in March of 1999. A full report including test data for any certification year is available upon request.

Respectfully, dd. Il 4,

E. S. Kraft, Site Vice President Attachment EFK\\RB\\nks 68 1 j 950317o189 950309 PDR ADOCK 05000254 R

PDR

e-e NRC FORM 474 U.S. NUCLEAR RELULATaRY COMMISSION APPROVEDBYOMO: NO.31964138 E3tPIRES: 16/31/95 g

ESTIMATED RJpOEN PER MSPONSE TO OOMPLY WITH THis INFORMATION (X3LLECTION REQUEST:

130 HOURS.

FORWARO SIMULATION FACILITY CERTIFICATION c ""*'"' "'**'OH3 kNCEN ESWAM Tm INFORMATON 40 RECOfCS MApeAGEMDdT BRANCH lMNBB 7714),

U.S.

NUCLEAR REGULATORY COMMISSON, WASHINGTON, OC 2055S4001. AND TO THE PAPERWORK REDUCTION PRCUECT Q15H13a), OFFCE OF MANAGEMENT AND BUOGET. WASHINGTON, OC 20503.

IIESTRUCTIOe:S: The form a to be shed for wt al ceruncation, recerurtaion (if requwed), and for any change to a elmunapon fassRy pettormance tes*mg plan maos mRee annel submma: at

,,,,, e,ien, P,,,,e me,o

,, wo,meen and ch.c= me soprence to= i e+ces towon kw submmai.

F ACILITY -

DOC C NUMBER

  • 254 Quad Cities - Unit 1 C^'

uCENetE Commnonwealth Edison Company and Iowa-Illinois Cas and Electric Company 3-9-95 shne m io s**y mac 1 The above named factiny sicensee is uomo a ennuianon factiey coasieung soiey at a piani<eser.nced simuistor ihan me.ie ine, equi,ements of 10 CFR es.4s.

a. Documentaion es evaHable kw NRC review m acordance wah 10 CFR 55.4S(b).
a. The ownutat on hedey meets De guidance contamed in ANSI /ANS 3 5,196S, as endorud by NRC Regulatory Gu6de 1.tes.

y there are any EXCEPTIONS to the ceWesten of the sem, CHECK HERE [ ] and desenbe fully on addtional pages as neceanary NAheE (or esner meneAcapon) AND LOCATION OF SIMULATION F ACILTTY.

Quad Cities Simulator i

Quad Cities Nuclear Power Station Training Facility 22601 - 206th Avenue North Cordova illinois 61242 s

SIMUL.ATON F ACluTY PERFORMANCE TEST ABSTRACTS ATTACHEO. Forperfwmance sosts conducted Jn me pened enshp we me defe of rus ce+#caean)

DESCRsPTION OF PERFORMANCE TESTING COMPLETED. (ArrecA addeonarpages as necesswy ed ederery me nem desenpean bomy canonued)

SiMUJTION F ACILfry PERFORMANCE TESTING SCHEDULE ATTACHED. (For ene conouct et approsmeret PS* otperfonnance sess per pa lbr me Aw-yewpened commenemy we tw due er rus eerancaron)

DEaGUPTION OF PERFORMANCE TESTING TO BE CONDUCTED (Anaca modeonar pages as necesswy ed adenefy me som descryeon beeig canonued) e6 I

PERrORunct uSTING PLAN CHANGE. Fw my mo&#ca6en so a penwmage sweng plan submmed on a prowam owe 8cason)

OtacF4FTON OF PERFORMANCE TESTING PLAN CHANGE (AnacA adeconer papes as necesswy ed aforet me Aem opcipean bang cononuod i The dates of the certification years associated with the performance testing have i

changed since the original Certification Report submittal. The dates now reflect the performance testing planned until the next certification update report to the commission in March of 1999.

RECERTIFCATION (Desenbe conec6wo aceans fakert anacA reedle of corras48edperformece faseng m accordece we TO C#R SidS(b)(5)64 (ApacA oddeone pages as necessary and asee$ me hem descnpean 6evig corenued) r Any suase statement or omiseen en this encument, meluemg attacnments, may be subsect to che and snmmal sarctorm. I certey under penany of perjury thal the informaten en the documeed and ariachments a true and oor et asGeenTVN - AUTHORl2ED REPRESENTATfWE TTTLE DATE m acaoreante man 10 CFR 6e.h. Commte catens, the bem eben be submitted to the NRC as fonows:

n SY Mall ADOESSED TO DaRECTO81.OF7tCE OF NUCLEAR REACTOR REGULATION SY OELfVERY pd PERSON ONE WHfTE FUNT NOfrTH UA NUCLEAR RE00LATORY COMMISSION TO THE NRC OFFICE AT:

11tas ROCKVILLE PlKE WASHINGTOct, DC 3965S eest ROC 8MLLE. MO f#C FORM 474 (1044 PFINTED ON RECYCLED PAPER

a NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED sY oms: NO. as sus as EXPIRES: 19/3t/es p

ESTIMATED Suf0EN PER RESPONSE TO COMPLY Wf7H THt$

INFORMATION COLLECTION REQUEST.

120 HOURS.

FORWARD SIMULAtlON FACILITY CERTlFICATION

" " ' * ' " * * " * " ' " " ' * * " " " ' ' ' ", ' " ' " " ' ' * " ^

  • RECORDS MANAGEMENT BRANCH (MNES 7714)

U.S.

NUCLEAR REGut.ATOfW COMMISSION. WASHINGTON, OC 20$$$4001,AND TO THE PAPESIWORK REDUCTON P8CJECT Q1SM138), OFFICE OF MANAGEMENT AND BUDGET, WASHfNGTON, DC 20503.

INSTRUCTIONS: The form is to be thed for inmal conific.ation, recertshcaten pl required), and Mr any change to a simulaten faceNy panormance testing p6an made after inneJ submmal of suc., e,,ian. P

. ~ fonowmg informanon and eh.c= P. u.pronnee bone mece. coa.on se autimms FACILfTY -

OOCKET NUMBER Quad Cities - Unit 2 so-265 uCENaEE Conanonwealth Edison Company and DATE Iowa-Illinois Gas and Electric Company 3-9-95 Tw. i in senry that:

1. The above named facilley koneee is womg a simulaien facitfry comesteng sole $ of a plant-referenced simulator that meets the requirements of to CFR 96.45.
3. Documenta! ion le available for NRC recew m accordance meth 10 CFR SS.4S(b).
3. The semulaten facdtty meets the gu6 dance contamed in ANSI /ANS 3 5,198S, as endorned by NRC Regulatory Guide 1.140.

W there are any EXCEPTIONS to the comficanon of this nem. CHECK HERf l ] and cesenbe ful$ on addnional pages as necessary Nme (w ome, cuca.wv ANO wCAToN OF suutAToN FACury.

. Quad Cities Simulator Quad Cities Nuclear Power Station Training Facility 22601 - 206th Avenue North Cordova, Illinois 61242 BuuLATON FACcTY PERFORMANCE TEST ABSTRACTS ATTACHED. (Fw pakanance fosa conducted bi to pened wideig we rio due W tw creAceron)

DESCRIPTION OF PERFORMANCE TESTING COMPLETED. (Arrach adeoonW pages as necessary and menet me nom coscnpean beang cononued) suutATom F ACurY PERFORuANCE TtBTING SCHEDULE ATTACHED. (Fw re saiduct # aproommet Fr Wpoemance swa pw pu er aw bur-pv pened commwomp wei r.

re of rw crescanon)

DESCFePTON OF PERFORMANCE TESTING 1O BE CONDUCTED. (AfracA addewier papas as necesswy and #derst to Nom descqpean bomp canonved) x PERFORuANCE TESTING PLAN CHANGE. (r, any moesceowt so e pavwmance sweng pian suemmed wi e annnow sweneason)

DEsCFenON OF PERFORMANM TESTING PLAN CHANGE (ArrecA addreoner papes as necessary and dewet to som descryeon benig canonued)

The dates of the certification years associated with the performance testing have changed since the original Certification Report submittal. The dates now reflect the performance testing planned until the next certification update report to the commission in March of 1999.

RECERTIFICATION (Descrfbe conocew actrons fahert afssch resufts of contpfeaed perbrmance faseng m accordance enm 70 CFR SidS(6)(S)Ar)

(ApocA adeponW pages as necessary wid sdorefy rw 4em descapean beeng cononued)

Any iaNe owemen w em aeon m ihis eocument, menueng artace=nia, may to subreciin she ano enmmai sanctions. i ney uno, p.nany of papry that the esommon in m.

document and attachments e true and sor. ora SsGNARJfE - AL/THOftIED EPNSENTATNE TITL.E DATE SITE VICE PRESIDENT 16 )

l 3-9-95 In ac.coroance enn to CF Ritt 5, Castimunscatens. the torm s%p be eutimmed te the NRC as th SY MAJL ADORESSED 70-DIRECTOR, OFTICE OF NUCtIAR REACTOR REOULATION BY OELNERY 94 PERSON ONE WHITE FUNT NORTH i

UA NUCLEAR REQULATORY COMMISSIOst TO THE NRC OFFICE AT:

11555 ROCKVILLE PIKE WASH 4NOTOes, DC 90$ssaaet ROCKVILLE. MD DWC FORM 474 (1H2)

PRINTED ON RECYCLED PAPER

-