Interim Deficiency Rept DER 83-54 Re Washers in Steam Generators 1 & 2.Initially Reported on 830802.Due to Extensive Evaluation Required,Next Rept Will Be Submitted by 831215
ML20081C175
Person / Time
Site: Palo Verde 
Issue date: 10/13/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28009-BSK, DER-83-54, NUDOCS 8310310138
Download: ML20081C175 (2)


Text

r

.e Arizona Public Service Company PHOENIX, ARIZONA 85036 PO box 216C4 e October 13, 1983 ANPP-28009-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-54 A 50.55(e) Potentially Reportable Condition Relating To Washers Found In Unit 1 Steam Generator #1 And #2 File: 83-019-026; D.4.33.2 Refere nc e: (A) Telephone Conversation between P. Narbut and R. Tucker on August 2,1983 (B) ANPP-27603, dated August 22, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference ( A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by October 13, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 15, 1983, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, CLL nt E. E. Van Brunt, Jr.

l l

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr/RQT:sn

~

q' gj C i cc: See Attached Page 2 l

31 m hi l

gji 8310310138 831013 09N '

PDR ADOCK 05000528 g

Mr. D. M. Sternberg DER 83-54 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l