ML20081C173

From kanterella
Jump to navigation Jump to search
Forwards marked-up Corrections to Emergency Plan Implementing Procedures Per Undated Ltr W3F84-0029 & marked- Up Revs to Emergency Plan
ML20081C173
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/08/1984
From: Leddick R
LOUISIANA POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20081C176 List:
References
W3F84-0042, W3F84-42, NUDOCS 8403120164
Download: ML20081C173 (4)


Text

,

UUISIANA P O W E R & L 1 G H T! NEW OALeANS LOUISIANA

,.. oe-o~oe emeer. m eoxsoas 70174-6008

. (504)366-2345

$S$ 8YS March 8, 1984 ROTH S. LEDDICK Senior Vice President Nuclear Operations W3F84-0042 3-A45 Director of Nuclear Reactor Regulation U.S. Nuclear-Regulatory Co ssion Washington, D.C.

20555

SUBJECT:

Waterfors 3 Steani Electric Station Revisions to Emergency Plan and Emergency Plan Implementing Document

REFERENCE:

Letter W3F84'-0029 Yrom R.S. Leddick to Director of Nuclear Reactor Regulation

Dear Sir:

The referenced letter was inadvertently transmitted undated. The correct date for the refarenced letter is February 21, 1984.

In addition, several other corrections should be made to the Attachment 1 transmitted in the referenced letter. Please replace the affected pages of the referenced letter with the corrected pages in Attachment 1 of this letter. of this letter contains changes to be made to the Emergency Plan and Implementing Document which are in addition to those originally indicated in the referenced letter.

All revf.sions to the plan and procedures incorporating these changes will be completed by May 4, 1984.

Very truly yours, 3.S. Leddick R

RSL/JJL/mle Attachments h

8403120164y0jo0 382 PDR ADOCK ppg l (p F

l k)

r ec with attachments: John T. Collins (Regional Administrator, Region IV U.S. Nuclear Regulatory Commission)

C. Hackney, D. Perrotti cc w/o attachments:

E.L. Blake, W.M. Stevenson, G.L. Constable, J. Wilson, S.E. Turk, G. Groesch 9

)

l

.- 1 f M *

,..,, ~

m.

.m_.-.

- - --re-----

4 o

Attachment I to W3F84-0042 Corrections to Attachment 1 of W3F84-0029

' The attached pages replace those corresponding pages in Attachment 1 of W3F84-0029. Only corresponding pages are replaced - the entire Attachment 1 is not revised.

D O

O r.,

.-w

wmw__,

y----

v Attachment I to W3F84-0029 Changes to ha Made to the Waterford 3 Emergency Plan.

In addition to the attached pages, the following changes will be made in Revision 7 of the Plan:

1.

The Alert / Notification System report will be s'>bmitted for staff review by March 30, 1984. This report will be included in the Emergency Plan as Appendix K.

2.

Appendix A - Mutual Assistance Agreement - will be updated to reflect correct names, titles and phone numbers.

3.

The methods for notif: ing the Coast Guard and Missouri Pacific Railroad (as referenced in their letters of agreement) will be described in Attachment C.

4.

A letter will be obtained from LNED tha't references their statutory authorities and responsibilities. This will replace the letter now in Appendix F.

,e

--r m

e-

.-e

-,-.,,->e

,vu-,

, - - - - -, ~, - -, - -, - - - - - - -