ML20081C105

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1984
ML20081C105
Person / Time
Site: Palisades 
Issue date: 02/29/1984
From: Cavadas K, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
NUDOCS 8403120140
Download: ML20081C105 (5)


Text

r.

OPERATING DATA REPORT DOCKET NO 50-255 DATE 3-07-84 COMPLETED BY KJCavadas TELEPHONE (616)764-8913

-OPERATING STATUS Notes l '. -. Unit Name:. Palisades 2.- -

Reporting Period:

840201-840229 3.

Licensed Thermal Power (MWt):

2530 14.

Nameplate Rating (Gross MWe): _

811.7

~5.-

Design Electrical Rating (Net MWe):

805 l6.

(Maximum Dependable Capacity (Gross MWe): *675 7.s Maximum Dependable Capacity (Net MWe):

  • 635 8.

If. Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, fgive reasons:

9... Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative 11.f Hours In Reporting Period 696 1440 106,935

12. Number of Hours Reactor Was Critical.

O 0

59,259.7

'13.. Reactor Reserve Shutdown Hours 14.. Hours Generator,0n-Line 0

0 56,278.5

- 15. ~ Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated.(MWH) 0 0

115.360,224

17.

Gross Electrical Energy Generated (HWH) 0 0

35,750,440.

18. ; Net Electrical Energy Generated (MWH).

O.

0 33,628,014 19.

Unit Service Factor' O

O 53.0 20.~. Unit Availability Factor 0

0 53.0

' 21.-

Unit' Capacity Factor (Using MDC. Net) 0 0

49.5

~ 22.

Unit Capacity Factor (Using DER Net) 0 0

39.0 23.

Unit: Forced Outage Rate-0 0

32.4

.24.

. Shutdowns Scheduled Over.Next Six Months (Type, Date and Duration of Each):

25; 'If Shut Down= at End of Report Period, Estimated Date of Start Up:

June, 1984

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY

+

INITIAL ELECTRICITY

~ COMMERCIAL OPERATION

.*B::ed.on condenser backpressure..

. mil 083-0092A-TC03' 3120140 840229 ADOCK 05000255 R

PM L

+-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 3-07-84 COMPLETED BY __ KJCavadas TELEPHONE (616)764-8913 MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

.18 0

3 0

19 0

4 0

20 0

5 0

21 0

6-0 22 0

7

'O 23 0

8

_ __ 0 24 0

9 0

25 0

10-0 26 0

11 0

27 0

12 0

28 0

13-0

.29 0

14

'0 30

' 15 -

0 31 16 0

INSTRUCTIONS On-this format, list the average daily unit power level in MWe-Net for each day'in the reporting month. Compute to the nearest whole megawatt.

mil 083-0091A-TCO3

r t

u v

U-UNITSilUIDOWNS ANDPOWER REDUCTIONS DOCKET NO.

50-255 UNIT NAME Palisades DATE 'l/7/84 REPORT MONiil. February COMPLETED BY _DynnnenBerg TELEPff0NE 616-764-8913 c

.5 E

'b 4.Y #d Licensee

,E -+

[",

Cause & Corrective No.

Date i

3g 4

,g g 5 Event G?

9-3 Action to

$E 3 ;F; g Report e SU E'

Psesent Recurrence e

o O

1 830812 S

696 C

.1

/

i 14 2

3 4

F: Foiced Reason:

Method:

Exhibit G - Instructions S: Schedulet!

A.1:iguipment Failure (Explain) 1-Manual for Preparation of Data' Il-Maintenance of Test.

2-Manual Scram.

Entr3 Sheets for I.ieensee C Refueling 3-Autonutic Scram.

Event Report (LER) File INURI.G-D-Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & License lixarnination F-Adnunist ratise 5

G-Operational 1:r ror ( E xplain)

Estubit 1 Same Source 19/77)

Il Orher (Explain)

~

.~..

.<4

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1984 The Plant' remained shutdown for refueling.

?

.e Y

?

s

+

t h

1 P

mil 083-0096A-TC03 "g

i y-,m=

y.3,%y 1rmg p--y

-myyr-ryvy-y-y-yr-y y y, q < g w$g e-y

,wy-%e.

y-m.-

74m g

y,g y,

y pe y - yy,etr-wr w

-q-gryy vweemv-w

9 9

Consurners Powcr Company Palisades Nuclear Plant: Route 2, Box 154, Covert, MI $9043 March 7, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of February 1984.

Q

^

Dewey VanDenBerg Acting Reactor Engineer CC: DMKennedy, Palisades JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LTPhillips, P21-319 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA RWIalyor, CE, Palisades JBToskey, P25-101 RLRosenfeld, P26-204A Document Control, 950*22*35*10/L DV:84*011 h

h OC1083-0100A-TC03 1

ri i