Containment Leak Rate Tests, Type B & C Test Repts
ML20081C011
Person / Time
Site: Turkey Point, 05000000
Issue date: 02/14/1976
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20081B916 List:
References
FOIA-83-296 NUDOCS 8310310070
Download: ML20081C011 (9)


Text

e-1 I

g ,

l APPENDIX C Periodic Type B And Tjpe C Test Reports 9

8310310070 830706 PDR FOIA CONNOR83-296 PDR .

CONTAINMENT LEAK RATE TESTS (TYPE B AND C TESTS)

The following routine local leak rate tests were performed during the reporting period on Unit 3; i.e., since the Unit 3 pre-operational ILRT (Type A test).

I. Penetration Tested

1. Personnel Air Lock (entire air lock test)

"AS LEFT" Test Date Leak Rate (cc/m) 3/9/73 0.0 7/9/73 0.0 10/30/73 0.0 4/1/74 0.0 '

8/8/74 0.0 12/3/74 8.16 3/20/75 0.0 l 7/9/75 0.0 SH

2. Emergency Air Lock (entire air lock test) 3/8/73 0.0 7/10/73 0.0 10/31/73 0.0 4/1/74 0.0  !

8/7/74 61.2 )

, 8/12/74 12.24 12/2/74 20.4 i.

3/19/75 10.*2 7/10/75 0.0

3. Fuel Transfer Flange 10/27/73 76.77 12/19/73 0.0 3/23/74 0.0 11/26/74 0.0 11/27/75 78.9
4. Equipment Hatch 8/6/73 0.0 10/27/73 0.0 12/18/73 0.0 10/15/74 0.0 11/8/74 0.0
  • b' 11/27/74 0.0 0.0
  • 12/2/74 ..

4/10/75 A. _ ,

._M

(

~.

5. Isolation Valves (after repair)

"AS LEFT" Test Date Lenk Rate (cc/m) 3-873A 8/3/73 21.0 ,

3-873B 8/3/73 0.0 3-873C 8/3/73 28.0 l MOV-86DA, 862A 3/25/74 0.0

{

MOV-880A, 883M 3/25/74 0.0 MOV-880B 6/11/74 0.0 The above tests were performed in accordance with Technical Specification 4.4.2 (Local Penetrations). l 1

II. The local leak rate tests on all boundary valves and penetrations were conducted during the Unit 3 refueling shutdown from October 7, 1974, to December 4, 1974, to meet the refueling surveillance requirements.

The following procedures were used:

Operating Procedure 13514.1 - Personnel / Emergency Air Locks Operating Procedure 13531.1 - Equipment Access Hatches Operating Procedure 13104.1 - Containment Purge Valves Operating Procedure 13404.2 - Electrical Penetration Canisters Operating Procedure 13404.1 - Containment Isolation Valves Operating Procedure 16004.1 - Fuel Transfer Tube Flange The total "as-found" leak rate was 125.67% of the maximms allowed in Section 4.4.2 of - he Technical Specifications.

Repairs and retests were made and the total leak rate at the time of heat up above 2000F was 21.21% of the maximum allowed in Section 4.4.2.

As part of the local leak rate tests, the following valves were repaired to reluce their respective leak rates:

Leak Rate Leak Rate Valv'e Penetration ec/ min. cc/ min.

Repaired Number As-Found As-Left Remarks 989A 8 203 0 Disassembled and cleaned MOV-869 18 216 6.42 Tightened packing 298A 24A 4,826 540 Installed and lapped new plug 298B 24B 3,217 0 Installed and lapped new plug 298C 24C 7,239 0 Installed and lapped new plug MOV-1410 28A 630 0 Cleaned and lapped dise Isolation 28B 450 0 Cleaned and lapped plug Valve B

() POV-2603 36 21,240 1704 Casket leak on body, reduced by caulking

  • The following table lists the valves and penetrations tested, with the "as-found" and "as-left" leak rates.

LOCAL LEAK RATE TESTS FOR REFUELING SHUTDOWN IN FALL OF 1974 AS-FOU:iG AS-LEFT Lowest Leak Lowest Leak Penetration Pressure, Pate Pressure Rate g Number Valves Tested ( psia) cc/ min. (psia) cc/ min.

. 1 Mov-750: MOV-751 65.55 540 65.55 540 2 MOV-744A: MOV-744B: MOV-734 70.50 0 70.50 0 3 MnV-716A 71.00 0 71.00 0 3 MOV-716B: 717 77.40 0 77.40 0 3 717 72.10 0 72.10 0 4 MOV-730: 732 70.50 0 70.50 0 5 Valve-A: 517: 549 68.95 0 68.95 0 5 CV-516: 552 70.40 0 70.40 0 6 Check Valve 518 70.60 47.08 70.60 47.08 6 550 69.10 0 69.10 0 7 CV-519 A & B: CV-522A, B, C 67.77 0 67.77 0 8 CV-951: CV-956A 69.85 486 69.85 486 ,

8 989A 66.00 203 67.10 0 9 CV-953: 956B 69.70 0 69.70 0 9 989B 67.80 0 67.80 0 10 4658 A & B 70.20 0 70.20 0 10 Check Valve 4657 71.50 32.1 71.50 32.1 11 MOV-863 A & B: MOV-872: 887 71.45 10.7 71.45 10.7 12 737A 69.30 0 69.30 0 12 738 68.60 0 68.60 0 13 CV-739 : 737B 68.80 0 68.80 0 14 CV-200A, B, C: CV 204 68.20 0 68.20 0 15 Check Valve-312C: CV-310 A & B: CV-311 69.75 21.4 69.75 21.4 HCV-121:'333 '

'15' -

  1. 68.85> '25.68- 68.85 25.68 %

16 Valve A & B 68.30 0 63.30- 0 .I 17 895 V 69.20 0 69.20 0 18 MOV-866 A &'B: MOV-869 68.50 216 68.10 6.42 19A MOV-880A: 883M 68.50 0 68.50 0 19A Check Valve-890A 66.90 12.85 66.90 12.85 19B MOV-880B: 883N 68.60 0 68.60 0 19B Check Valve-890B 66.00 38.5 66.00 38.5 20 989C: 957A 69.70 27.82 69.70 27.82 ,

20 CV-955 A & B: CV-956C 66.10 53.5 66.10 53.5 1 21 MOV-1417: MOV-1418} 68.55 12.84 68.55 12.84 22 . MOV-1417: MOV-1418) Tested Together 68.55 12.84 68.55 12.84 23 CV-2821: CV-2822 68.50 0 68.50 0 24A 198A 68.00 4826 65.40 S40 24B 298B 68.00 3217 73.80 0 24C 298C 68.00 7239 76.00 0 24A,B,C 297A, B, C 69.50 0 69.50 0 25 MOV-381 69.70 0 69.70 0 28A MOV-1410 64.70 630 70.20 0 28B MOV-1411 65.50 450 70.00 0

  • 28C MOV-1412. 68.40 0 68.40 0 29 Check valve-C 70.50 21.4 70.50 21.4 29 CV-2803 71.30 0 71.30 0 31 CV-4659 A & B . 68.60 0 68.60 0 32 Check Valve-B 71.55 21.4 71.55 21.4 32 SV-2912 67.00 450 67.00 450

^

?) ,

-e ..

s

- i-~*.

r-AS-FOUND AS-LEFT Lowest Leak Lowest Leak Pressure, Rate Pressure Rate Penetration psia ec/ min. psia ec/ min.

Number Valves Tested 67.00 486 67.00 486 33 SV-2911 67.00 450 67.00 450 33 SV-2913 72.40 0 72.40 0 34 Valves A & B 0 65.00 0 35 POV-2600: POV-2601 65.00 65.00 21240 67.30 1704 36 POV-2602: POV-2603 0 74.00 0 CV-855: CV-853A, B, C: HCV-936 74.00 42 0 68.40 0 43 MOV-626: 736 68.40 67.00 2170 67.00 2170

- 47 Valves A & B 0 68.20 0 52 CV-4668 A & B 68.20 ,

69.80 0 69.80 0 l 53 Valves C & D 0 69.20 0 l 54A MOV-860A: MOV-862A 69.20 '

71.00 0 71.00 0 54B MOV-860B: MOV-862B 68.50 0 CV-955C, D, E: CV-956D 68.50 0 55 0 68.40 0 58 Check Valve-873A 68.40 68.40 0 68.40 0 59 Check Valve-873B 69.10 0 69.10 0 60 Check Valve-873C 0 67.30 0 67.30 58,59,60 MOV-843 A & B: 837 71.70 0 71.70 0 61B First Valve Outside Containment 67.60 27.82 CV-2819: CV-2826 67.60 -

27.82 63 66.70 0 66.70 0 64A MOV-1427 MOV-1426 69.70 0 69.70 0 64B 0 MOV-1425 69.40 0 69.40 64C- _ , ^

From ILRT Air Compressor 69.80 'O 69.80 0 65A 0 Pressure Sensing and Flow ILRT 70.60 0 70.60-65B 0 65C ILRT Leakage Flow 69.10 0 69.10 Transfer Tube Flange 66.0 25.7 ,

39 Equipment Hatch 68.7 0 40 Personnel Air Lock, Inner Door 66.7 0 41 8.16 Personnel Air Lock, Outer Door 66.7 41 49 Emergency Air Lock, Inner Door 67.0 0 Emergency Air Lock, Outer Door 65.8 20.4 49 The total leak rate from the electrical canisters equaled zero.

Total As-Found Leak Rate = 43,023.10 cc/ min.

Total As-Left Leak Rate = 7,252.61 cc/ min.

=

l III. Th'e local leak rate tests on all boundary valves and penetrations were conducted during the unit #3 refueling shutdown from October 25, 1975, through December

( 11, 1975. l i.

The following procedures were used; Operating Procedure 13,514.1, Personnel /Emergenty Air Locks Operating Procedure 13,531.1, Equipment Access Hatch Operating Procedure 13,104.1, Containment Purge Valves Operating Procedure 13,404.2, Electrical Penetration Canisters Operating Procedure 13,404.1, Containment Isolation Valves Operating Procedure 16,004.1, Fuel Transfer Tube Flenge The total "as found" leak rate was 546% of the maximum allowed in Section 4.4.2 of the Technical Specifications. .

Repairs and retests were made and the total leak rate at the time of heat-up above 2000F was 27% of the maximum allowed in Section 4.4.2.

A new maximum allowable leak rate was established using La of .25% per day as per Appendix J of 10 CFR 50.

O 0

0 e

4

(') .-

m ..

1

7__.

MJ I

l s

VALVE REPAIR LIST f

laak Rate cc/m Penetration Valve PWO AS AS Number Number Number FOUND LEFT Remarks t

i 6 518 5872 15,000 195.6 check valve; disassembled and cleaned 8 956A 5873 44,000 21.5 lapped and cleaned 951 10 4657 5871 2,200 38.7 check valve; disassembled and cleaned ,

19t. 890A 34,506 37,000 4,000 check valve; disascembled and cleaned 4

20 CV-955A 34,508 44,000+ 0 lapped and cleaned -

CV-955B I CV-956C  ;

28A MOV-1410 34,509 4,000 279.3 lapped and cle:ned  !

32 VLV-B 26,789 2,400 6.86 check valve; disassembled and cleaned

~ '

SV-2912 2,600 '301.8' f" 33 SV-2911 8,792 6,900 130.3 replaced valve diaphrams  !

SV-2912 1,000 178.4 l' 36 POV-2603 5,897 70,000* replaced shaft seals, bearing and seats 64A MOV-1425 5,870 5,900 0 lapped discs  ;

SKVA South 3,600 0 lower left hand insulator was cracked Canister at the base. The entire insulator was replaced. L

  • Calculated from pressure drop test.

[

(

Y

  • h

LOCAL LEAR RATE TESTS FOR REFUELING SHUTDOUN IN FALL OF 1975 AS-FOUND AS-LEFT Lowest Leak Lowest Leak Penetration Pressure, Rate Pressure Rate Number Equipment Tested psia ec/ min. psia ec/ min.

1 MOV-750: MOV-751 66.0 2500 66.0 2503 2 MOV-744A,B: FCV-605: HCV-75B 65.27 34.4 65.27 34.4 3 MOV-716A 69.43 29.0 69.43 29.0 3 MOV-716B 67.52 37.0 67.52 32.0 3 KC.VLV-717 67.5 15.0 67.5 15.0 4 MOV-730: 732 67.6 30.0 67.6 30.0 5 552:CV-516 70.3 0.0 70.3 0.0 6 CK VLV-518 66.0 15,000 66.0 195.6 7 CV-519A,B: CV-522ABC 68.3 0.0 68.3 0,. 0 8 CV-951:CV956A 66.0 44,000 66.1 21.5 8 989A 68.5 0.0 68.5 0.0 '

9 CV-953:CV-956B 70.07 0.0 70.07 0.0 9 989B 69.32 0.0 69.32 0.0 10 4658 A,B 70.0 0.0 70.0 0.0 10 CK VLV-4657 66.0 2200 67.72 38.7 11 MOV-872 66.89 0.0 69.89 0.0 12/13 737A:739 . 70.0 0.0 70.0 0.0 12/13 CK.VLV-738:737B 71.15 0.0 71.15 0.0 14 CV-200A,B,C 66.0 3500 66.0 3500 14 CV-204 67.78 0.0 67.78 0.0 15 CK VLV 312C 67.53 10.75 67.53 10.75 15 BCV-121:333 70.32 0.0 70.32 0.0 '

16 ' HV-3-1:HV-3-2 69.6 0.0' 69.6 0.0 17 895V 72.11 0.0 72.11 0.0 18 MOV-866A,B:CV-869 69.56 0.0 69.56 0.0 19A MOV-880A 70.1 0.0 70.1 0.0 19A CK.VLV-890A 66.0 37,000 66.0 4,000 19B MOV-880B 68.60 0.0 68.6 0.0 19B CK.VLV-890B 73.55 0.0 73.55 0.0 20 989C 69.43 0.0 69.43 0.0 20 CV-955A,B:CV-956C 66.0 44,000 68.45 0.0

. 21/22 MOV-1417:MOV-1418 68.0 0.0 68.0 0.0 23 CV-2821:CV-2822 67.5 0.0 67.5 0.0 24A -

CK VLV-298A 67.'60 10.0 67.6 10.0 24B CK VLV-298B 70.0 5.0 70.0 5.0 10.0 24C CK.VLV-298C 68.91 10.0 68.91 25 MOV-381 69.6 0.0 69.6 0.0 28A MOV-1410:127 66 0 4,000 66.0 279.3 28B MOV-1411:227 67.2 0.0 67.2 0.0 28C MOV-1412:327 66.2 0.0 66.2 0.0 29 CK VLV-336 65.8 0.0 65.8 0.0 29 CV-2803 68.13 0.0 68.13 0.0 31 CV-4659A,B 68.2 15.0 68.2 15.0 32 CK VLV 'B' 66.0 2400 69.83 6.86 32 SV-2912 66.0 2600 66.0 301.8 33 SV-2911 66.0 6900 66.0 130.3 33 SV-2913 66.0 1080 66.0 178.4 34 203:205 67.95 0.0 67.95 0.0 .

I O

F -

i AS-FOUND AS-LEFT Lowest Leak Lowest Leak Penetration Pressure, Rate Pressure Rate Number Equipment Tested psia ec/ min. psia ec/ min.

L 35 POV-2600:POV-2601 67.5 10.0 67.5 10.0 36 POV-2602:POV-2603 66.0 70,000 70.2 0.0 42 CV-855 68.3 0.0 68.3 0.0 43 MOV-626 69.0 15.0 69.0 15.0  !

64.8 60.0 43 736 64.8 60.0 47 CK VLV 'A' 66.0 279.3 66.0 279.3 52 CV-4668A,B 70.2 0.0 70.2 0.0 53 HV-3-3:HV-3-4 68.5 10.75 68.5 10.75 i 54A MOV-860A:MOV-861A 68.0 0.0 68.0 0.0 l 54B MOV-860B:MOV-861B 68.6 0.0 68.6 0.0 8 55 CV-955C,D,E:CV-956D 69.5 0.0 69.5 0.0 t 58 CK VLV-873A 69.95 0.0 69.95 0.0 59 CK VLV-873B 68.6 0.0 68.6 0.0 60 CK VLV-873C 68.1 30.0 68.1 30.0 58-59-60 MOV-843A,B 67.35 0.0 67.35 0.0  !

61B Valve 'C' 68.6 0.0 68.6 0.0 ,

63 CV-2819:CV-2826 66.0 300.0 66.0 300.0 64A. MOV-1425 66.0 5,900 68.0 0.0 64B MOV-1426 69.05 0.0 69.05 0.0 64C MOV-1427 69.22 0.0 69.22 0.0 65A ILRT 'E' 74.1 0.0 74.1 0.0 j 65B ILRT 'F' 68.0 0.0 68.0 0.0 65C ILRT 'G' 68.4 0.0 68.4 '

0.0

\* \

39 Transfer Tube Flange 66.0 78.9 '

40 Equipment Hatch 70.1 0.0 41 Personnel Air Lock (Inner Door) 70.2 0.0 41 Personnel Air Lock (Outer Door) 66.1 0.0 49 Emergency Air Lock (Inner Door) 68.1 0.0 .

49 Emergency Air Lock (Outer Door) 67.0 0.0  !

The total "AS-FOUND" leak rate for the electrical canisters = 3600 cc/m (the only canister that leaked was 5KV-A2. The lemh was due to a broken insulator which was replaced before heat up)

The total "AS-LEFT" leak rate for the electrical canisters = 0.0 cc/m Therefore, Total "AS-FOUND" leak rate = 245,576.20 cc/m Total "AS-LEFT," leak rate = 12,127.56 cc/m