ML20081B892
| ML20081B892 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/02/1984 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RDC-93(84), NUDOCS 8403120052 | |
| Download: ML20081B892 (2) | |
Text
r d n10 o
- s. u.;i,' q j J' p T [f ! ('
!{l ji pss.rilC4 tup i
r 5
- 51
- j lii i, s <<l
,1. p p a t' ra I.4 a 1 as v
,-_a t<
<, in t f 1: ;
u P.O. Box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING 9tDG. - 55 PUBUC SQUARE Serving The Best Location in the Nation
'x 1'
MURRAY R. EDELMAN March 2, 1984 VICE PRE *ilDENT NUCLE A R Mr. Jame G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road t
. Glen'Ellyn, I111ncis 60137 s
RE:
Perry Nuclear Power Plant i
Docket Nos. 50-440; 50-441 Actuator Mounting Brackets for Motor Operated Exhaust Louvers (RDC 93(84) )
Dear Mr. Keppler:
This letter serves as our interim report purcuant to 10CFR50.55(e) concerning cracks found in welds on actuator brackets.for motor operated exhaust louvers on the Diesel s
s
,. Generator Rooms' Ventilation, System'and the Emergency Service Water Pump House Venti-lation System.
Mr. J. Konklin was first noL3fied on February 3,1984 by Mr. s'.
Riley of The Cleveland Electric Illuminating Company that this problem was being evaluated.
This report contains a description of the deficiency, the method planned to complete our evaluation and the planned date for the final report.
Description of Defic}ency, y Crackswerefoundinveldmonactuatormountingbracketsforall24motoroperated exhaust louvers on the %dits 1 add 2 Diesel Gener% tor Rooms' Ventilation Systems (M43) and all 4 motor operated exhaust louvers on the Units 1 and 2 Emergency Service Water Pump House Ventilation S) stem (M32).
In addition,,weid cracks were found in linkage tubes on 5 of the 28 louvers.
x
~
r These actuators and louvers were supplied'to riGbert Irsay Company, our HVAC installa-tion contractor under Specification 49-4549-00, by their subcontractor M.C.C. Powers who in turn purchased them from Construction fpecialties, Inc.
Method Planned to Complete Evaluation r
(
s Nonconformaivt Reports MCCF-0079 and MCCF.0082 have been issued by M.C.C. Powers to document the conditions found.
Project Organization is presently reviewing documen-tation associated with the fabrication of these louvers and brackets to assess the proEram used during fabrication.
Upon completion of this evaluation, the Nonconform-i ance' Reports will be dispositioned and resubmitted to the P.aoject Organization. These r
1 i
actions should be completed by April 6, 1984.
s, I
MAfo8EEoNNA MAR 61984 s
.; N 1
1 5
f
a Mr. James G. Keppler 2-March 2, 1984 It is our intention to submit our final report on this subject by April 27, 1984.
Please call if there are any additional questions.
Sincerely, Murray R. Edelman Vice President Nuclear MRErdm cc:
Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 s
__.M___
__ _