Interim Deficiency Rept DER 83-75 Re Improperly Torqued Bolts Securing Two DO126SA Panel Filler Assemblies,Supplied by Foxboro.No New Info Available at Present Time.Final Rept Will Be Submitted by 840419
ML20081B635
Person / Time
Site: Palo Verde  
Issue date: 02/22/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28918-BSK, DER-83-75, NUDOCS 8403090258
Download: ML20081B635 (2)


Text

-

o,,.,:y Psmiu imB Arizona Public Service Company P.o. box 21666 + PHOENIX. ARIZONA 850X j,

g.

February 22,i9Ad ANPP-28918-BSK/TRB U. S. Nuclear Regulatory Commission Region V

'Creekside Oaks Office Park

1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-75

=A 50.55(e) Potentially Reportable Deficiency Relating To Bolts Securing The Two D0126SA Panel Tiller Assemblies, Supplied By Foxboro, Were Improperly Torqued File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. Dodds and R. Tucker on November 2, 1983

-(B) ANPP-28361, dated December 5, 1983 (Interim Report)

(C) ANPP-28663, dated January 23, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report.would be available by February 29, 1984.

Due to the extensive investigation and evaluation required, it is now

. expected that this information will be finalized by April 19, 1984, at

'which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, (L

f

(%%

8 E. E. Van Brunt, J.

'8403090258 840222 APS Vice President, Nuclear PDR ADOCK 05000528 ANPP Project Director S

pg EEVB/TRB:ru cc: 'See Page Two'

/E Z ~+ 1 1 0

r e

  • ;[. c'
o-L Mr. T.-W. Bishop DER 83-75 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U.fS. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. ' Wo od s, J r.

W. E. Ide D. B. Fasnacht A. C. Rogers s

B. S. Kaplan L. A. Souza l-

_ J. Vorees J. R. Bynum P. P. Klute A. C. oGehr W. J. Stubblefield.

W. G. Bingham R.- L. Pa tterson R. W. Welcher H. D.~ Foster D. R. Hawkinson L. E. Vorderbrueggen G. AJ Fiorelli S. R. Frost J. Self D. Canady h

Records Center Institute of Nuclear' Power Operations.

l1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339

~

I 7

4 l' A 9

m 4

,~mi

,--,,,,-, i-..-

---,,-e

,w- +,

pc y,ew.,-,

s--

,r,y-,,_-.~sgw gse-v-

, -