o,,.,:y Psmiu imB Arizona Public Service Company P.o. box 21666 + PHOENIX. ARIZONA 850X j,
g.
February 22,i9Ad ANPP-28918-BSK/TRB U. S. Nuclear Regulatory Commission Region V
'Creekside Oaks Office Park
- 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-75
=A 50.55(e) Potentially Reportable Deficiency Relating To Bolts Securing The Two D0126SA Panel Tiller Assemblies, Supplied By Foxboro, Were Improperly Torqued File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between R. Dodds and R. Tucker on November 2, 1983
-(B) ANPP-28361, dated December 5, 1983 (Interim Report)
(C) ANPP-28663, dated January 23, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report.would be available by February 29, 1984.
Due to the extensive investigation and evaluation required, it is now
. expected that this information will be finalized by April 19, 1984, at
'which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, (L
f
(%%
8 E. E. Van Brunt, J.
'8403090258 840222 APS Vice President, Nuclear PDR ADOCK 05000528 ANPP Project Director S
pg EEVB/TRB:ru cc: 'See Page Two'
/E Z ~+ 1 1 0
r e
- ;[. c'
- o-L Mr. T.-W. Bishop DER 83-75 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U.fS. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. ' Wo od s, J r.
W. E. Ide D. B. Fasnacht A. C. Rogers s
B. S. Kaplan L. A. Souza l-
_ J. Vorees J. R. Bynum P. P. Klute A. C. oGehr W. J. Stubblefield.
W. G. Bingham R.- L. Pa tterson R. W. Welcher H. D.~ Foster D. R. Hawkinson L. E. Vorderbrueggen G. AJ Fiorelli S. R. Frost J. Self D. Canady h
Records Center Institute of Nuclear' Power Operations.
l1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339
~
I 7
4 l' A 9
m 4
,~mi
,--,,,,-, i-..-
---,,-e
,w- +,
pc y,ew.,-,
s--
,r,y-,,_-.~sgw gse-v-
, -