Interim Deficiency Rept DER 83-82 Re Cables in Units 1 & 2 Diesel Generator Control Cabinets & Unit 1 Diesel Generator Bldg W/Small Bend Radius.Initially Reported on 831202.Final Rept Delayed Until 840425
ML20081B504
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/22/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28919-BSK, DER-83-82, NUDOCS 8403090197
Download: ML20081B504 (2)


Text

e 4

.o e

n.

HF

~

Arizona Public Service Company.

b P.O. BOX 21666 e PHOENIX. ARIZONA 85036

(. '

n F

c February 22, 1984 ANPP-28919-BSK/TRB 4

.UNS.. Nuclear Regulatory Commission-i H

Region-V I

.Creekside Oaks Office Park b

11450 Maria Lane - Suite 210

Walnut. Creek, CA 94596-5368

' Attention: Mr. T. W. Bishop, Directorj

~ Division of Resident Reactor Projects and Engineering Programs

~

i i-

Subject:

Time Extension For Report - DER 83-82

~ A 50.55(e) ~ Potentially. Reportable Deficiency Relating To Cables In The Unit 1 & 2 Diesel Generator Control Cabinets And Three Cables In The Unit 1 Diesel Generator Building, Have Too j

-Small Of A Bend Radius File: 84-019.-026; - D.4.33.2

'.(') Telephone conversation between P. Gage and K. C. Parrish

Reference:

A on December 2, 1983 (B) A?FP-28528, dated January 3, 1984'(Interim Report)

L

Dear Sir:

The NRC'was notified of a potentially reportable deficiency in

' Reference (A), and an Interim Report was : transmitted by Reference (B).

.At that time, it.was estimated that a Final Report would be available by March 1, 1984.

x 1Due;to.the extensive-investigation and evaluation required, it is.now b:

expected that this-information will be finalized by April 25,1984, at which time a' complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, EEUw%k E. E. Van Brunt, Jr.

k APS Vice President, Nuclear

.ANPP. Project Director-

.EEVB/TRB:ru" cc: _See Page Two.

8403090197 840222

'PDR ADOCK OS000 3

a p

jg y 1 0 A

m......

s t..

+

Mr.{T. W. Bishop.

DER 83-82

.Page'Two

.cc:-

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Re?,ulatory Commission Washington, D. C. 20555

s..

T..G. Woods, Jr.

W. E. Ide

.D.

B.- Fasnacht

- A. C. Rog'ers B. S. Kaplan

/r'

'L. A. Souza

-J. Vorees J. R.:Bynum P. P. Klute

- A. C. Gehr W. J. Stubblefield W. C. Bingham R. ' L. Patterson R. W.' Welcher H. D. Foster-D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli

.S. R. Frost J.'

Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 '

Atlanta. GA 30339 9

w