Interim Deficiency Rept DER 83-59 Re IEEE-384 Separation Criteria Violated by Wiring in post-accident Control Room & Safety Radiation Monitoring Cabinets.Initially Reported on 830830.Final Rept to Be Submitted by 831129
ML20081B253
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/03/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27912-RQT, DER-83-59, NUDOCS 8310270413
Download: ML20081B253 (3)


Text

.,

Arizona Public Service Company P o BOX 21666

  • PHOENIX arf 2ONA 65036 October 3, 1983 ANPP-27912-RQT/BSK U.S. Nuclear Regulatory Commission Region V C.

f' Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Interis Report - DER 83-59 A 50.55(e) Potentially Reportable Deficiency Relating to IEEE-384 Separation Criteria Violated By Wiring In Unit 2 Post-Accident Control Room Cabinet And Safety Radiation Monitoring Cabinet File: 83-019-026, D.4.33.2 Ref e rence : Telephone Conversation between P. Narbut and R. Tucker on August 30, 1983

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the ref erenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interin Report is attached. It is now expected that this information will be finalized by November 29, 1983, at which time a complete report will be submitted.

Very truly yours,

-.. OA RLL a7 E. E. Van Brunt, Jr.

APS Vice President Nuc1 car Projects Management ANPP Project Director EEVBJr/RQT:sn At tachment cc: See Page 2 8310270413 831003 Ig,g PDR ADOCK 05000529 S

PDR if17

.~*

U. S. Nuclear Regulatory Commission Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan l

W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. ?!. Grant i

D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations j

1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 I

l

9 2*

6 4

s INTERIM REPORT - DER 83-59 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY ( APS)

PVNGS UNIT 2 1.

Potential Problem Inspection of Unit 2, Safety Radiation Monitoring Cabinets (Tag o

No's 2J-SQA-col) and 2J-SQB-C01 revealed that internal wiring is not in conformance with Class 1E separation requirements as defined in IEEE-384, Inspection of Unit 2, Post Accident Radiation Monitoring o.

Cabinets (Tag No's 2J-SQA-C05 and 2J-SQB-C05) revealed that internal wirirs is not in conformance with Class 1E separation I

requirements as defined in IEEE-384.

Both cabinets were supplied by Kaman Instrumentation Corporation.

l II.

Approach To and Status of Proposed Resolution i

Bechtel Engineering has contacted Kaman Instrumentation Corporatio n.

Kaman has responded that a field representative is scheduled to visit the PVNGS jobsite, the week of August 29, 1983, to review and determine corrective action required.

Based on Kaman representative's recommendations, Bechtel Engineering will issue Design Change Packages for the corrective action required.

III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is Forecast to be completed by November 29, 1983.