ML20081B049

From kanterella
Jump to navigation Jump to search
Amends 92 & 94 to Licenses DPR-44 & DPR-56,respectively, Deleting Certain ETS Re Noise Monitoring Requirements & Nonradiological Water quality-related Requirements
ML20081B049
Person / Time
Site: Peach Bottom  
Issue date: 02/24/1984
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Philadelphia Electric Co, Public Service Electric & Gas Co, Delmarva Power & Light Co, Atlantic City Electric Co
Shared Package
ML20081B052 List:
References
DPR-44-A-092, DPR-56-A-094 NUDOCS 8403070141
Download: ML20081B049 (15)


Text

_.

ayaty fo, UNITED STATES NUCLEAR REGULATORY COMMISSION y,

.r wasumorow, o. c. 2osas

%, * * * * *,o PHILADELPHIA ELECTRIC COWANY PUBLIC 5ERVICE ELECTRIC AND GA5 CO@ANY DELMARVA POWER AND LIGHT CONANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 92 License No. DPR-44 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al., (the licensee) submitted by letter dated February 14, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; l

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of thid amendment is in accordance with 10 CFR Part E.

l 51 of the Commission's regulations and all applicable requirements l

have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:

Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 92. are hereby incorporated in the license.

PECO shall operate the facility in accordance with:the Technical Specifications, i

8403070141 940224 PDR ADOCK 05000277 P

PDR

9 a

. 3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY CORiISSION

(

L doh): F. Stolz, Chief Operating Reactors Bianch #4

_ Division of Licensing

Attachment:

Chances to the Technical Specifications Date of Issuance: February 24, 1984 e

t

- - +

3 e -

4--

ww------1 3

-.~-e.

-.----e-.-,

- - - - - - - - -..- - +, -,,,, ---

w.--,--

e-,

+

ATTACHMENT TO LICENSE AMENDMENT NO. gp FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following pages of the Appendix "B Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of channe.

Remove Insert i

i Sc Sc 6

7 8-9 10 11 11 12 14 14 15 29 30 34 35 36 37 38 39 40 41

41.....

PSAPS TABLE *0F CONTENTS Page No.

1.0 Definitions. Abbreviations and Symbols 1

l.1 Definitions 1

1.2 Abbreviations 2

1.3 Symbols 3

2.0 (Deleted) 3.0 Monitorino Recuirements 5

2.1 Thermal 3.1 5

2.2

.(Deleted) 3.2(Deleted) 2.2.1 (Deleted) 3.2.1 (Deleted) 2.2.2

( Deleted) 3.2.2 (Deleted) 2.2.3 J Deleted) 3.2.3

' Deleted 2.2.4

' Deleted) 3.2.4 L Deleted,?

2.3 (Deletedl 3.3 (Deletedl 4.0 Recort Levels 5.0 Monitorino Recuirements 11 4.1 (Deleted) 5.1 (Deleted) 4.2

(. Del eted) 5.2 5.3 (Deleted) 4.3 Radiological 13 6.0 Environmental Surveillance and Soecial Study Procrams 14 6.1 (Deleted) f 6.2 (Deleted) 5.3 (Deleted) 6.'4 Radiological Study Program 41 7.0 Administrative Controls 48.

7.1 Organization, Review and Audit 48 7.1.1 Organization 48 7.1.2 Review and Audit 48

! ' Amendmtnt No. 57,I 92

PROTECTION LIMITS MONITORING REQUIREf1ENTS 2.2 (Deleted) 3.2 (Deleted) 2.2.1 (Deleted)'

3.2.1 (Deleted)

' 2.2.2

. (Deleted) 3.2.2 (Deleted) 2.2.3

- (Deleted) 3.2.3 (Deleted) 2.2.4

' (Deleted) 3.2.4 (Deleted) 2.3 (Deleted).

3.3

(.Deletedl 3

c i-f a

8 1 -

Note: Dages 6-10 have been deleted.

The next page is 'll.

obendment No. 4D', 92

- 5c--

i

= - -

t p y

,s

-~---..n,,.

P8APS 4.0 Report Levels 5.0 Monitoring Requirements 4.1 (Deleted) 5.1 (Deleted) 4.2 (Deleted) 5.2 (Deleted) l 11 -

Note:

Page 12 has been deleted. The next page is 13 Am:ndment No. 67.'92 w -- ---,

+t c

,t-

.<-r--<


r-+

v.e

,y-ee

~

PBAPS 6.0 Environmental Surveillance and Special Study Programs Studies described in this section will be termir.ated upon agreement by Philadelphia Electric Company and the Nuclear Regulatory Commission that the intended purpose of the study has been satisfied.

6.1 (Deleted) 6.2 (Deleted) 6.3 (Deleted) a.

, ' Note: Pages 15-40 Save been deleted.

Amendment No. $7,92 The next"page is 41

PBAPS 6.4 Radiolecical S:udv proeram Objective An environmental monitoring program shall be conducted to evaluate the effects of station operation on the environs and to verify the effectiveness of the source cen:rols on radioactive materials.

Soecification The envirennental radiation =enitoring program shall be con-ducted as speciti.ed in Table 6.4-1.

Milk will be analy:cd fer I,131 such that at tha

  • level of 0.5 picoeuries per liter of milk at the ti=e of sampling, er as close to this sensitivity as can be c:hieved using proven commercial techniques, the overall one sigma countin6 error is equal to or less than 25 percent of the activity measure.

Bases In connection with the high temperature gas-cooled racc:or (HTGR) located at the Peach Bottom Atcmic Power S:ation, a prc-operational envire. men:al radia: ion survey was conducted between March 1960 and February 1966, at which time :his reac:or first achieved cri:icality.

The objec:ive of the program was to acquire quantitative data on the concentr1 tion of radioactivi:y in envi'ronmental media in the vicini:y of the reactor site priur to the operation of the F.TCR facility.

The enviren= ental radiation =eni:oring program carried out prior to February 1966 has continued, with minor modifica:icns frem cLme :o time in order :o acquire similar data af:er the initial cpers:ian of Unit No. l.

A similar program will continue af ter ini:ial operation of Units 2 and 3 in order to moni:or environmen:al radioac:ivi:y levels in the Patch Sottom area.

Amendment No. 26,92 -

/

'o UNITED STATES' 8"

NUCLEAR REGULATORY COMMISSION c.

aI wAsHWGTON, D. C. 20555 k

/

PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GA5 COWANY DELMARVA PCWER AND LIGHT CONANY ATLANTIC CITY ELEclMIC CONANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 94 License No. DPR-56 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al'., (the licensee) submitted by letter dated February 14, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l

E.

i The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Spec-i ifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:

(

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 94, are hereby incorporated in the license.

PECO shall operate the facility in accordance with the Technical Specifications.

l

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION V

(Jo F. Stolz, Chief (0p rating Reactors Bra ch #4 1 vision of Licensing

Attachment:

Chances to the Technical Specifications Date of Issuance: February 24, 1984 s

N s

~

ATTACHMENT TO LICENSE AMENDMENT NO. 94 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix "B Technical Specifications with the enclosed oages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Remove Insert i

1 5c Sc 6

7 8-9 10 11 11 12' 14 14, 15 29 30 34 35 36 37 38 39 40 41 41

PBAPS TABLE'0F CONTEfES Page No.

1.0 Definitions, Abbreviations and Symbols 1

1.1 Definitions 1

1.2 Abbreviations 2

1.3 Symbols 3

2.0 (Deleted) 3.0 Monitorino Reouirements 5

2.1 (Thermal) 3.1 5

2.2

.(Deleted) 3.2 (Deleted) 2.2~.1 (Deleted) 3.2.1 (Deleted) 2.2.2 (Celeted) 3.2.2 (Deleted) 3.2.4 (Deleted ll (Deleted)

Deleted) 3.2.3 (

2.2.3 Deleted?

2.2.4 s

2.3

(. Del eted).

3.3 (Deleted).

4.0 Recort Levels 5.0 Monitorino Recuirements 11 4.1 (Deleted) 5.1 (Deleted) 4.2

(. Del eted) 5.2 (Deleted) 4.3 Rac1ological 5.3 13 t

5.0 Environmental Surveillance and Scecial Study Procrams 14 5.1 (Deleted) g,2 (Deleted) 6.3 (Deleted) 6.4 Radiological Study Program 41 7.0 AGministrative Controls 48 7.1 Organization, Review and Audit 48 7.1.1 Organization 48 7.1.2 Review and Audit 48 Amendment No. 57,'. 94

PROTECTION LIMITS MONITORING REQUIREMENTS 2.2 (Deleted) 3.2 (Deleted) 2.2.1 (Deleted) 3.2.1

' Deleted) 2.2.2 (Deleted) 3.2.2 (Deleted) 2.2.3 (Deleted) 3.2.3

'(Deleted) 2.2.4

.(Deleted) 3.2.4 (Deleted) 2.3 (Deleted) 3.3 (Deletedl l

i i

s i

Note: pages 6-10 have been deleted, j

The next page is 'll.

Amendment No. 77 94

-5c-

PBAPS 4.0 Report levels 5.0 Monitoring Requirements 4.1 (Deleted)

,I (Deleted)

J.

4.2 (Deleted) 5.2 (Deleted)

I i

i l

\\ Hote:

Page 12 has been I

P#9"

~

s 13 Amendment No. $$, 94

l.

PBAPS 6.0 Environmental Surveillance and Special Study Programs Studies described in this section will be terminated upon agreement by Philadelphia Electric Company and the Nuclear Regulatory Commission that the intended purpose of the study has been satisfied.

6.1 (Deleted) 6.2 (Deleted) 6.3 (Deleted) l l

l l

l l

l l

l l

l MP% flote: Pages 15 40 i

have been deleted.

Amendment No. 66, 94 The next p3ge is 41.

l l

\\

PBAPS I

1 a

6.4 Radiolocical Study program Oojective An environmental monitoring program shall be condue:ed to evaluate the effects of station operation on the environs and to verify the effectiveness of the source con:rols on radioactive materials.

Specification The envirennental radiation monitoring program shall be con-ducted cs specifi.ed in Table 6.4-1.

Milk will be analy:cd fer I,131 such that at tha' level of 0.5 picoeuries per li:er of milk at the tL=e of samplin or as close to this sensitivity as can be achieved using proven comn tial techniques, the overall one sig=a counting error is equal to or 1.ss t.}an-25 percent of the activity measure.

Bases In connection with the high tempera':ure gas-cooled reac:or (HTGR) located at the Peach Bottem Atomic Power S:stion, a prc-operational envire..aental radia: ion survey uas conducted between March 1960 and February 1966, at which tLne :his reactor first achieved cri:icality.

The objec:ive of the progrs= was to acquire quanti:ative da:a on the concentration of radioac:ivity in envi'ronmentel media in the vicini:y of the reactor site prior to the operation of the HTGR facility.

The enviren= ental radiation =oni:oring program carried out prict to ebruary 1966 has continued, with minor modifications frem time to One in order o acquire similar data after the initial cperation of Unit he 1.

A si=ilar pro $ rem will continue af ter ini:ial opers: ion of Units 1 and 3 in order to moni:or environtental radioactivi:y levels-

.in the Pet.ch So::ca area.

Amendment No. 75, 94,_-_

.. ~. _ _ - -, _ __

.