ML20081A958
| ML20081A958 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/29/1984 |
| From: | Westafer G FLORIDA POWER CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20081A962 | List: |
| References | |
| 3F02-20, 3F2-20, IEB-80-11, NUDOCS 8403060402 | |
| Download: ML20081A958 (2) | |
Text
--
I ano,he b
o ZO COWO*e 10 0*
eaQth(9f kD$5 e
QCORe o o *e*
e M
P, o...w... e.. n.r February 29,1984 j 'h 3F0284-20
.1 Director of Nuclear Reactor Regulation 1_
Attention: Mr. John F. Stolz, Chief i
Operating Reactors Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Bulletin 80-11, Masonry Wall Design Request For AdditionalInformation
Dear Sir:
Your letter dated November 29, 1983, requested additional information in order to complete your review of Florida Power Corporation's (FPC's) responses to IE Bulletin 80-11 dated November 7 and 17,1980. In a letter dated December 13,1983, FPC indicated this information would be provided by February 29, 1984. By this letter, FPC fulfills that commitment.
The attached report, dated February 10,1984, provides responses to the 13 questions presented in your November 29,1983 letter, including some supporting information.
The report indicates that, based upon more conservative boundary conditions than those used in the initial re-analysis, three walls (walls 1, 2, and 3) located on elevation 145 of the control complex, will not withstand a safe shutdown earthquake (SSE). Previous modifications to wall I have eliminated its possible affect on safety related equipment. A recent, unverified, inspection of walls 2 and 3 has indicated that the failure of either wall would not have an adverse affect on safety related equipment in the area. A verification of this inspection will be -
made by March 30,1984.
FPC is currently evaluating alternatives which will assure that these walls will not adversely affect any safety related equipment which may be placed in this area in the future. FPC will provide documentation of this evaluation by April 30,1984.
8403060402 84 MDR ADOCK 9 h 302 PDR go g G EN ERAL OFFICE 3201 Thirty-fout th Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151
February 29,1984 3F0284-20 Page 2 Should there be any questions, please contact this office.
Sincerely, e
'I G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management Attachment ( 15 Copies) cc:
Mr. James P. O'Reilly Regional Administration, Region 11 Office of Inspection and Enforcement U.S Nuclear Regulatory Commission 101 Marietta St., N.W., Suite 2900 Atlanta, Ga. 30303 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 j