OPERATING DATA REPORT DOCKET NO. 050-29?
DATE 2-7-84 COMPLETED BY P.
L.
Ballinger TELEPHONE 402-825-3811 OPERATING STATUS
- 1. Unit Name:
Cooper Nuclear Station Notes
.2.' Reporting Period:
January, 1984
- 3. Licensed Thermal Power (MWt):
2381
- 4. Nameplate Rating (Gross MWe):
83_6
- 5. Design Electrical Rating (Net MWe):
778 787
- 6. Maximum Dependable Capacity (Gross MWe):
764 7.' Maximum Dependable Capacity (Net mwd):
8.- If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give "teasons:
9.' Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. lf Any:
This Month Yr to.Date Cumulative,
744.0 744.0 84,049.0 I1. Hours In Reporting Period
' 12. Number Of Hours Reactor Was Critical 718.0 718.0 67,721.0
- 13. Reactor Reserse Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 700.6 700.6 66.618.9
' 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH).
1,378,512.0 1,378,512.0 131,891,670.0
,17. Gross Electrical Energy Generated (MWH).
472,113.0_
472,i13.0 41,878,468.0
-18. Net Electrical Energy Generated (MWH) 452.097.0 452,047.0 40,368,756.0
- 19. Unit Service Factor 94.2 94.2 79.3
- 20. Unit Availability Factor 94.2 94.2 79.3
- 21. Unit Capacity Factor (Using MDC Net) 79.5 79.5 62.9
- 22. Unit Capacity Factor (Using DER Net) 78.I 78.1 61.7 5.8 5.8 3.8
. 23. Unit Forced Outage Rate
' 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Maintenance Outage, April 7, 1984, 10 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
' 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY g
- COMMERCIAL OPERATION W 840131 DR ADOCK 05 g,
e
4 AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.
/
UNIT Cooper Nuclear Station
}
DATE 2-7-84 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 MONTH January, 1984 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) g 576 g7 702 499 723
,g 3
19 4'
755 20 701 674 706 5
,g 610 6
701 22 700 626 7
33 g
625 24 627 9
748 25 663 588 10 729 26 696
.II 734 27 710 669 12
,3 705 495 13 39 427 0
14 30 561 51 15 3,
623 16 INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
050-298 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCUONS UNIT NAME Cooper Nucienr Station DATE 2 84 COMPLETED BY P. L h11 % er REPORT MONTil Januarv. 1984 TELEPHONE 402-825-3811 c
t Cause & Corrective
['3 jg 3
- Ey Licensee E*
Actron to l
No.
Date k
5g s* '.g s s Event g?
gU Prevent Recurrence I
e Q =-
g 2"e Report a mV s
7, r o
u 6
l 84-1 840114 S
0 3
4 NA NA NA l'ower was reduced to allcw turbine l
testing and repair steam leaks.
During heavy winds, a piece of reactot 84-2 840129 F
43.4 A
3 building metal facade tore loose and fell across the 161 KV startup trans-former power lines, tripping the 161 KV power supply and resulting in i
a reactor scram. The line was in-spected and found slightly damaged and is scheduled to be repaired during the Spring maintenance outage.
The reactor building facade will be repaired as time and material allow.
3 4
I J
j Method:
Exhibit G -Instructions F: Forced Reasury S: Scheduled A Equipment Failure (Explain) 1 Manual for, Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee 3 Automatic Scram.
Event Report (LER) File (NUREG-C-Refueling 4 Other (Explain) 0161l D Regulatory Restriction E-Operator Training & Ucense Examination 5
F-Administrative Exhibit 1 - Same Source G Operational Error (Explain)
(9/77)
II Other (Explain)
- LER #, system code and component code have not been designated at the time of this report.
t u3-:
l; _.
OPERATIONS NARRATIVE COOPER NUCLEAR STATION j:
JANUARY, 1984
'The plant operated at: steady stete power with only one reduction in power on January 14 and one shutdown on January 29.
Power was reduced on January 14 to perform turbine testing and repair steam leaks'in the turbine. On January 29 during a wind storm, la metal panel from the reactor building was blown off and across the 161 KV startup power lines. The 161 KV transformer tripped from the ground and phase-to-phase fault and caused a reactor scram. A small
~
. amount of damage was found on the 161 KV power lines, but was not considered significant. The plant was started up and returned to power operation on January 31, 1984.. The 161 KV line will be repaired during our spring maintenance outage.
b I
l
W, Nebraska Public Power District COOPER NJCLEAP STATION
'^ " * "ATr *o"??=in.^r^ ""'
CNSS840052 February 7, 1984 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operation Status Report for January 1984 Docket No. 50-298 Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for January 1984. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown data, and a Narrative Summary of Operating Experience.
Should you have any comments or require additional information regarding this report, please contact me.
Sincerely, P. V. Thomason Division Manager of Nuclear Operations PVT:lb Enclosure cc:
G. D. Watson w/ene.
A. C. Gehr w/ene.
J. T. Collins w/ene.