ML20080T872

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violation Noted in IE Insp Repts 50-327/83-12 & 50-328/83-12.Corrective Actions:All Piping Corrected & Verified Capped or Sealed to Prevent Damage or Deterioration
ML20080T872
Person / Time
Site: Sequoyah  
Issue date: 08/22/1983
From: Kammer D
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20080T851 List:
References
NUDOCS 8310250494
Download: ML20080T872 (2)


Text

_ _ _

E :.

0 DC TENNESSEE VALLEY AUTHORITY P-3 W.

CHATTANOOGA. TENNESSEE 374ot b

~!IN

~

400"Chestn'ut Street Tower II' N'

cn

,m August 22, 1983

?-

el p.-

g U.S. Nuolearl Regulatory Coinnission y,f

  • ~

Region II g.

f*

Attn:

Mr. James P. O'Reilly, Regional Administrator

- 101 Harietta Street, NW, Suite 2900 Atlants, Georgia 30303

Dear Me. O'Reilly:

SEQUOYAH MUCLEAR PLANT UNITS.1 AND 2 - NRC-0IE REGION II INSPECTION REPORT 50-327/83-12 AND 50-328/83 RESPONSE TO VIOLATION The subject OIE inspection report dated July 25, 1983 from R. C. Lewis to H.~ G. Parris cited TVA with one Severity Level V Violation.

Enclosed is the response to the subject report.

4 If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

i To the best of my knowledge, I declare the statements contained herein are conclete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY pS W D. S. Kammer Nuclear Engineer Enclosure Mr. Richard C. DeYoung, Director (Enclosure)'

oc:

Office of Inspection and Enforcement U.S..Nuolear Regulatory Commission Washington, D.C.

20555 8310250494 831003 PDR ADOCK 0500032 G

1983-TVA SOTH ANNIVERSARY An Equal Opportunity Employer

4 RESPONSE - NRC INSPECTION REPORT NOS.

50-327/83-12 AND 50-328/83-12 i

D. M. VERRELLI'S LETTER TO H. G. PARRIS i

DATED JULY 25, 1983 g.

4 h

Item 327. 326/S3-12-01 10 CFR 50, Appendix B, Criteria XIII requires that msasures shall be established to control the handling, storage, shipping, cleaning and preservation of material and equipment to prevent damage or deteriora-tion. The licensee's up, proved QA program, Topical Report TVA-TR75-1

'[

requires that pipe be stored la accordance with ANSI 45.2.2 (1972) which requires that the ends be capped or sealed, h

Contrary to the above, measures to prevent damage or deterioration of pipe were not implemented in that on June 23, 1983 the inspector noted numerous pieces of QA stainless steel pipe in the licensee's storage yard near Huts 2 and 3 and in the Construction Warehouse pipe shed that i

did not have the ends properly capped or sealed. The pipe near Huta 2 q

and 3 was maintained by the Construction Warehouse.

This is a Severity Level V Violation (Supplement I).

This violation applies to both Units.

1.

Admission or Denial of the A11eeed Violation TVA admits the violation occurred as stated.

q 2.

Reasons for the Violation if Admitted The stainless steel pipe storage problems were a result of lack of manpower to maintain the equipment properly and of storehouse personnel to realize the significance of these requirements.

1 l

3.

Corrective Steps Which Have Been Taken and the Results Achieved One J e 25 and 26, 1983, a special task force inspected all stain-( ~ les steel pipe to ensure compliance with AI-11 and ANSI-45.2.2 (1972). All piping wagerectedAnd verified to be capped or i

de[,erioration.

l sealed to prevent damage ur g

.l In addition, a section instruction letter was written for Power Stores personnel emphasizing each employee's responsibility to make i

sure that the stcrage of stainless steel pipe or tubing complies with AI-11.

l h

4

1 j

I 1

4.

Corrective Steps Which Will be Taken to Avoid Further Violations _

No further action is required.

't'

~

5.

Date When Full Compliance Wil1 be Achieved Full compliance was achieved on July 1, 1983 4