Text
,-
a-
-TENNESSEE VALLEY AUTggTbgg,..
CH ATTANOOGA. TENN ESSEE/GY4o'i N " ' - LeiiO Pr31 A 400 Chestnut Street Tower II
- Septedlidr3ff,2J98$ $ l. l 3 P
.U.S. Nuclear Regulatory Coimnission Region II
- Attn
- L Mr. James P." O'Reilly, Regional Administrator i
101 Marietta Street, NW,' Suite 2900
~ Atlanta, Georgia 30303
Dear Mr.' 0'Reilly:
r SEQUOYAHNUCLEARPLANTUNITS.1AND2-NRCdIEREGIONIIINSPECTIONREPORT 50-327/83-12 AND 50-328/83 RESPONSE TO VIOLATION The subject OIE inspection report dated July 25, 1983 from R. C. Lewis
' to H. G.. Parris cited TVA with one Severity Level V Violation.
- An. initial response to the subject report was submitted on August 22,'1983 As discussed with Paul Fredrickson of your staff in a telephone conversa-t$cn on September' 6,1983, _enolosed is a revised response.
If you have any questions, please get in touch with R.- H. Shell at
. FTS:858-2688.
- To the best' of my knowledge,.I declare the statements contained herein are complete and true.
Very truly yours, TENNESSEE VALLEY AUTHORITY I
\\
g L. M. Mills, Manager Nuclear Licensing Enclosure oc: Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement
.U.S. Nuclear Regulatory Commission Washington, D.C.
20555 1
1 Records Center (Enclosure)
. Institute of Nuclear Power Operations i
1100 Circle 75 Parkway, Suite 1500
[
Atlanta,. Georgia 30339' Okoo 7
PM r
e s:
1983-TVA 5OTH ANNIVERSARY
- An Equal Opportunity Emplo',er 7
... :., m..... _.. _ -.., _, _.., _ _,
..m.
m.,
RESPONSE - NRC INSPECTION REPORT NOS.
=
- 50-327/83-12 AND 50-328/83-12 D. M. VERRELLI'S LETTER TO H. G. PARRIS DATED JULY 25, 1983 item 327.328/83-12-01 10 CFR 50, Appendix B, Criteria XIII requires that measures shall be established to control the handling, storage, shipping, cleaning and preservation of material and equipment to prevent damage or deterioration.
' The licensse's approved QA program, Topical Report TVA-TR75-1 requires that pipe be. stored in accordanae with ANSI 45.2.2 (1973) which requires that the ends be capped or sealed.
4-Contrary to the abovs, measures to prevent damage or deterioration of pipe were not implemented in that on June 23, 1983 the inspector noted numerous pieces of QA stainless steel pipe in the licensee's storage yard near Huts 2 and 3 and in the Construction Warehouse pipe shed that did not have the ends properly capped or sealed. The pipe near Huts 2 and 3 was maintained by the Construction Warehouse.
This is a Severity Level V Violation (Supplement I). This violation applies to both units.
1.
Admission or Dienial of the Alleged Violation TVA admits the violation occurred as stated.
2.
Reasons for the Violation if Admitted The stainless steel pipe storage problems were a result of a. lack of manpower to maintain the equipment properly and failure of personnel to realize the significance of the storage requirements.
3 Corrective Steps Which Have Benn Taken and the Results Achieved j
For the etainless steel pipe in the storage yard, a special task force inspected all stainless steel pipe on June 25 and 26,1983, to ensure 4
compliance with AI-11 and ANSI-45.2.2 (1972). All piping was corrected and verified to be capped or sealed to prevent damage or deterioration. In addition, a section instruction leLLee was wellten for fcwer Stores personnel emphasizing each employee's responsibility to make rure that the storage of stainless steel pipe or tubing complies with AI-1i.
i For the stainlese steel pipe in the Construction Warehouse, immediate corrective action was taken by the CONST Materials Inspection Group to have warehouse personnel seal the ends of all stainless steel piping in the storage shed. A final inspection was conducted on July 25, 1983 to ensure that all CONST stainless steel piping was properly stored after the excess pipe was removed. The stainless steel piping is presently stored according 3
to SQN Construction Procedure No. P-12, and all ends are sealed. The significance of the storage requirements was emphasized to warehouse personnel.
y J
f L
f I
E
~
e li. Corrective Steps Which Will be Taken to Avoid Further Violations e
No further action is required.
,5. Date When Full Compliance Will be Achieved Fall compliance was achieved onduly 1,1983 for the stainless steel pipe in the storage yard ar.d full compliance was achieved on July 25,1983 for the stainless steel pipe in the Construction Warehouse.