T s,
~ '.
GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy Studies c
1901 Que Sheet. N.W., Washington, D.C. 20009 (202)234 93S2 November 26, 1983 Director FREEDOM OF INFORMATION Office of Administration ACT, REQUEST U.S. Nuclear Reguletory Commission fC[A -gG-96 7 Washington, D.C.
20555 0o !d H-40 49 To Whom It May Concern:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 552, the Government Accountability Project (GAP) of the Institute for Policy Studies, requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, any other data compilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with and/or as a result of the October 21,1983 " Report cn the Review of the Diesel Generator Building at Midland". prepared by all members of the review team.
p,..
~
w Speci#ically, this request includ'es 'all copies, Wafts, and me'mos which were ge'nerated during the NRC review of the report. We would note that page 6 of the Conclusions of
~
4-this report, as well as several other places in this report, have changes made with a different typewriter than the original report.
This request specifically includes all the initial drafts of the Conclusions of this report.
Further, any internal memos g
related to a review of this report by all branches of the NRC are subject to this request.
This request includes all agency records as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8,1980), whether they currently exist in NRC official " working" investigative or other files, or at any other location, includirg private residences.
If any records, as defined in 10 C.F.R. 9.?a(b) and the NRC Manual, supra, and covered by this request have been ostroyed and/or removed, or are destroyed and removed after receipt of this request, please provide all surrcunding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken, relevant date(s), individual,
.j.
office and/or agocy-wide policies and/or justifications for the action (s), identifi-j; cation of all personnel involved with the actions, and any and all records relevant j-
.to, generated in connection with, and/or issued in crder to implement the action (s).
GAP requests that. fees be waived, because " finding the information can be considered as primarily benefitting the general public," 5 U.S.C. 552(a)(4)(A).
The Government Accountability Project is a non-profit, non-partisan public interest organization concerned with honest and open government.
Through legal representation, advice,
~
GARDE 83-707 PDR 4
...J.Dir:ctor, Office of Administration
' November 26, 1982 4'g U.S., Nuclear; Regulatory Conaission national-conferences, films, publications anc public outreach, the Project promotes
. whistleblowers as agents of government accountability..Through its. Citizens Clinic, GAP. offers ~ assistance to local public interest and citizens groups seeking to ensure the-health and safety of their communities. The Citizens Clinic is cu.rently assisting
- several. citizens-groups and intervenors in the Vidland area concerning the construction
? of the' Midland Nuclear Plant.
-We are requesting the above information as a part of an ongoing monitoring project on the_ adequacy of the NRC's efforts to protect public safety and health at nuclear power
- plants.
.F;r ~any documents or portions thereof that you deny due to specific F0IA exemption, please provide an index itemizing and describing the documents or portions of documents withheld.
The index should provide a detailed justification of your grounds for claiming cachLexemption.. explaining why each~ exemption is relevant to the document or portion of Ldocument withheld.
This index is required under Vaughn.v. Rosen (1), 484 F.2d 820 f(D.C.Cir.'1973)-cert. Jenied, 415 U.S. 977 (1974).
' We look. forward to your response to this request within ten days.
Sincerely, kh Icc m
Bil.l ie.Pi rner Garde
.,,.s.
s., -
s Citizens Clinic Director
+
BPGime' m
I I.e
1 Q
a rtig%,.
Pb(2. -- Ol&
<?
UNITED STATES
.s g'
NUCLEAR REGULATORY COMMISSION b
- :/[.. [,
I 3
j.
WASHINGTON. D. C. 20555 1
A DEC 14 1983 -
Doc.t.4 Alo-re-sa s 330 Ms. Billie Pirne Garde.
~ Citizens Clinic Di*ector Government Accountability Project
-Institute for.. Policy Studies 1901.Que Street, NW.
IN RESPONSE REFER
- Washington, DC 20009 TO FOIA-83-707
Dear Ms. Garde:
L This is in response to your request for all records relevant to or 0
generated in connection with or as a result of the October 21, 1983,
-"Repcrt on' the Reriew of the Diesel Generator Building at Midland'.'
prepared by all members of the review team.
1 Certain pertinent records, as identified on enclosed Appendix A, have
~ already-been made available for public inspection and copying at.the NRC
.Public. Document eRoom.(P.DR)....
o.
... ~
At this time, we are placing the 17 records identified on enclosed Appendix B in the PDR. These records will be filed in PDR folder F0IA-83-707 under your name.
i -
Sincerely,,.
l ' :: ' f;
^
/
j M:' Felton, Director Division of Rules and Records Office of Administration
Enclosures:
- As stated 1f ~
84030'10199 831214 PDR FOIA GARDES3-707-PDR s
4 s
wmov i
-t y em
--..,y.
.g v
-+e+,.
m w.
-~as-i
,,e
.-,E..s,w
-o-r%.,-..r--
-==re -e n +-w-We-ear,--we--erm---iw---wsw--ineae---s
--a e r e.--.tr
++
RE:
F01A-83-707 APPENDIX A 1.
8/10/83 Letter to Garde from Eisenhut.
PDR: 8308220381 2.
10/11/83 Memo to ASLB from Novak, " Supplementary Notification Regarding Dr. Landsman's Concerns for the Midland Diesel Generator Building (BN 83-153)".
PDR: 8308300767 3.
10/12/83 Meetiag Sumary by Darl Hood, "Sumary of September 12 and 13, 1983 Meeting on Structural Adequacy of the Diesel Generator Building".
PDR: 8310210134
.4.
11/1/83 Meeting Sumary by Darl Hood, of which B. Garde was on service list, contains the following pertinent records.
A.
8/24/83 Midland Plant Units 1 and 2 Diesel Generator Building Executive Sumary.
B.
8/24/83 Agenda, NPC Presentation on Diesel Generator Building.
C.
Undated Figures I-2-2 and I-2-4, V-1-3,4, V-3-1, 3,5,6,7,8, and 9.
D.
Undated
" Remedial Program" consisting of figures and
~
charts.
5.
12/2/83 Supplementcl Board Notification 83-185 contains the following pertinent records.
A.
11/16/83 Memo to Adensar, from Lear, " Corps of Engineers Memoranda on Diesel Generator Building - Mid-land Plane.
B.
11/18/83 Meno to Lear from Kane, "Coments on October 21, 1983 Reprt by Independent Task Group Review of the DGB on the Midland Plant".
C.
11/18/83 Memo to Lear from Rivaldi, " Evaluation of Evidence on Diesel Generator Building - Midland Project for Detennination of Need to Reopen Hearings".
We:
trLE R8T-7d7'
.c APPENDIX B 0
'l.
7/27/83 Mamo to Novak from Eisenhut, " Board Notification 83-109".
(1 page) 2.
9/20/83 Memo to Novak from Eisenhut, " Board Notification for Midland", w/o stated enclosure which is attached to pertinent Board Notification and is available in the PDR.
(1 page) 3, 9/23/83 Draft report " Review of Diesel Generator Building at Midland Plant" by Miller and Costantino.
(24 pages) 4.
10/5/83 Memo to Novak from EisEnhut, " Midland Board Notification 83-153", w/o stated enclosure which is attached to pertinent BN and is available in the PDR.
(1 page) 5.
10/17/83 Letter to Vuo from Reich with enclosed final report " Review of Diesel Generator Building at Midland Plant" by Miller and Costantino.~
(26 pages) 6.
10/21/83 Memo to Knight from Kuo, " Report on the Review of the Diesel Generator Building at itidland", with attached subject report.
(98 pages) 7.
10/26/83 Meno to Novak from Eisenhut, " Board Notification Concerning Peport on the Review of the Diesel Generator Building at.
Midland", w/o stated enclosure which is attached to BN and available in PDR.
(1 page) 8.
10/27/83-Handwritten notes by Kane entitled " App III - Report by Brookhaven Natl. Lab (C. A. Miller and C. J. Costantino)
and "Coments on the Review of the DGE & Midland by botn SES and BNL.
(5 pages) 9.
11/14/83 Memo to Knight from Kuc, " Errata Pages - Report on the Review of the Diesel Generator Building", w/ stated enclosures.
(5 pages)
- 10. 11/17/83 Memo to Eisenhut from Hood, " Recommendation for Supplemental Board Notification Regarding Corrections to Report on Diesel Generator Building", w/o stated enclosure which is identified at No. 8 above..
- 11. 11/18/83 Memo to Novak from Eisenhut, " Supplement to Bil-83-165 -
Midland", w/o stated enclosure which is attached to BN and available in PDR.
- 12. 11/18/83 Memo to Vollmer from Eisenhut, " Task G*oup Report on Midland Diesel Generator Building".
(1 page)
- 13. 11/22/83 Memo to Eisenhut from Hood, "Reconsnendation for Supplemental Board Notification Regarding Midland Diesel Generator Building",
w/o stated enclosures wLich are attached to BN and available in PDR.
(4 pages)
F~
~
Re:
F01A-83-707 o...
APPENDIX U (Cnntinued)
- 14. 11/22/83 Memo to Vollmer from Lear, " Response to OELD - DL Requests for Assessment of TF Report", w/o stated enclosures which are attached 'to BN and available in PDR.
- 15. 11/25/83 Memo to Eisenhut from Vollmer, " Recommendation Relative to
- Reopening of the Midland Hearings", w/ stated attachment.
(3 pages)
- 16. 11/25/83 Note to Eisenhut from Adensam, " Midland DGB -
- commendation on Re-opening the Hearing", w/o attachment w' is identified at No.-15 above.
(1 page)
.17. il/30/83 Memo to Eisenhut from Adensam, '"Re-opening the Hearing at Midland on the Diesel Generatur Building", v/ stated attachment.
(2 pages)