ML20080S808

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-78 Re Lack of Documentation in User Test & Controlling Procedure for Rock Bolt Expansion Anchors.Initially Reported on 831209.Next Rept Delayed Until 840516
ML20080S808
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/06/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28801-BSK, DER-83-78, NUDOCS 8402290263
Download: ML20080S808 (2)


Text

,

1 Arizona Public Service Company PHOENIX, ARIZONA d5036 P O. Box 2'666

  • February 6, 1984 ANPP-28801-BSK/TRB U.'S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-78 A 50.55(e) Potentially Reportable Deficiency Rclating To No Documentation Of Users Test And No Controlling Procedure For Rock Bolt Expansion Anchors File:

84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and K. C. Parrish on November 9, 1983 (B) ANPP-28393, dated December 8,1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by February 16, 1984.

Due to che extensive investigation and evaluation required, it is now expected that this information will be finalized by May 16, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours t

I O

O 8

~

h O

9402]A PDR PDR E. E. Van Brunt, Jr.

S APS Vice President, Nuclear s

ANPP Project Director EEVB/TRB:ru cc: See Page Two ff-3 7 * *

.i:

Mr. T. W. Bishop DER 83-78 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Wo od s, Jr. -

W. E.'Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan J. Voreta J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher.

H.

D.' Foster D. R. Hawkinson

- L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J..Self D. Canady Records Center-Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 f

6 i

'. h.

t