Interim Deficiency Rept DER 83-61 Re Low Pressure Safety Injection Pump Failure to Start & to Produce Required Head. Initially Reported on 830914.Next Rept Delayed Until 840417
ML20080S003
Person / Time
Site: Palo Verde 
Issue date: 02/15/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28883-BSK, DER-83-61, NUDOCS 8402280481
Download: ML20080S003 (2)


Text

.

n n

'lo Arizona Public Service Company s

no. Box 2issa. PHOENIX, ARIZONA 85036

~

February 15, 1984 r;

ANPP-28883-BSK/TRB U

R U.;S. Nuclear Regulatory Commission TMc O

C N

=Q Region V 2 3:

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 r

G E

Walnut Creek, CA 94596-5368 g

M Attention: Mr. T. W. Bishop, Director c-Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-61 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 LPSI Pumps Failed To Start And Do Not Produce The Required Head.

File: 84-019-026; D.4.33.2

Reference:

-(A) Telephone conversation between P. Johnson and R. Tucker on September'-14, 1983.

(B) AUPP-28001, dated October 13, 1983 (Interim Report)

(C) ANPP-28627,' dated January 16, 1984 (Time Extension)

Dear Sir:

The NRC was' notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was_ requested by Reference (C). At that time, it was estimated that a Final Report would be available by February 23, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 17, 1984, a t which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly.aurs, CCC (,(\\Ch' r LL

~

t E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc:

See Page Two 8402280461 640215 PDR ADOCK 05000528 8

PDR o

..
' f e

.s

7 i
Mr. T. W.l Bishop DER 83 -PagecTwo' fcc

- Richard DeYoung, Director Office of Inspection and Enforcement U.'S. Nuclear Regulatory Commission

. Washington, D.

C.' 20555-

'f W. E..Ide T.-G. Woods, Jr..

D. B. Fasnacht A. C. Rogers B. S. Kmplan J. Vorees

~ 'J.lR. Bynum s

P. P. Klute

'A. C. Gehr W.-J.

Stubblefield

W; G.~ Bingham

'R. L. Patterson R.nW. Welcher Hi D.. Fester

, D. ;.R.

Hawkinson "

- L.': E;~ Vorderbroeggen C.-A. Fiore111- '

r

~S. R.-Frost: _

-=

J..Self 4

D. Canady, g.

+

Records Center l Institute of Nuclear Power. Operations 1100 Circle 75 Parkvay, SuiteL-1500:'
Atlanta..GA 30339

..lh' I

E v

i i

n 4

j

.