D L1
/czy
'fl I
Arizona Public Service Company Po. box 21666
- PHOENIX, ARIZONA 85036 February 13, 1984 ANPP-28840-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reector Projects and Engineering Programs
Subject:
Interim Report - DER 84-01 A 50.55(e) Potentially Reportable Deficiency Relating to the Startup Test Program appa antly does not adequately track retests of preoperational tects File: 84-019-026; D.4.33.2
Reference:
Telephone Conversation between P. Narbut and J. Cook on January 20, 1984.
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a
. determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by April 9,1984, at which time a complete report will be l
submitted.
very truly yours, M
nL6 E. E. Van Brunt, Jr.
APS Vice President, Nuclear AhTP Project Director EEVB/TRB:db At tadment r.pg!
g
-cc:
See Page Two gg (g p,d lZ OM b 8402280301 840213 PDR ADOCK 05000528 Ah 8
PDR gyggp3 L
s h*
e.
. W Mr. T. W. Bishop DER 84-01
._Page Two ec:-
Richard DeYoung -Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
+
Wi'E.'Ide D. B. Fasnacht A..C. Rogers B. S. Kaplan J. Vorees J. R. Bynum-P.-P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Fatterson s
~ R._W. Welcher
-H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G..A. Fiore111 S. R. Frost
- J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA:30339 f
g w
r-%
v--
re e
yy e-e-,,w-w
.a--
-re,m-r-r--w
--.-e++,-
r
--x
---r c
c A
INTERIM REPORT - DER 84-01 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 I.
POTENTIAL PROBLEM The Startup Test Program does not adequately track retests of preoperational tests after work is performed on a structure, system, or component to insure satisfactory performance. A documented program has not been implemented to track preoperational retests in the Startup program. Outstanding preoperational retests during/after system turnover to Operations are also not adequately controlled by procedures.
II.
APPROACH TO AND STATUS OF PROPOSED RESOLUTION APS Startup is presently reviewing the identified deficiencies.
Any necessary changes. identified during the evaluation will be implemented in the Startup Program.
III. PROJECTED COMPLETION OF CORRETIVE ACTION AND SUBMITTAL OF THE FINAL REPORT REPORT Evaluation of this condition and submittal of the Final Report is Forecast to be completed by April 9, 1984 l