ML20080R204

From kanterella
Jump to navigation Jump to search
Forwards Telecopy Facsimile of RG Tolson Affidavit Responding to ASLB Questions Re Computerization of Nonconformances.Original Forthcoming
ML20080R204
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/11/1983
From: Reynolds N
DEBEVOISE & LIBERMAN, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
Shared Package
ML20080R207 List:
References
NUDOCS 8310170412
Download: ML20080R204 (5)


Text

DOCKETED uw orrices or USNRC DEBEVolSE & LIBERMAN s war .o .aeo e October 11,'1983 CFF10[3f'SUSEE8 " "

000XUiHG A SU N '-

Do.A llCH Peter B. Bloch, Esq. Dr. Kenneth A. McCcllom Chairman, Atomic Safety Administrative Judge and Licensing Board Dean, Division of Engineering U.S. Nuclear Regulatory Architecture and Technology Ccamission Oklahoma State University Washington, D.C. 20555 Stillwater, Oklahcma 74078 Dr. Walter H. Jordan Administrative Judge 881 W. Outer Drive Oak Ridge, Tennessee 37830 Re: Texas Utilities Generating Company, et al.

(Comanche Peak Steam Electric Station, Units 1 and 2) Docket Nos. 50-445 and 50-446; Applicants' Answer to Board Questions Regarding Computerization of Nonconformances Gentlemen:

Enclosed is the affidavit of Mr. Ronald G. Tolson, the TUGCO Site Quality Assurance Supervisor at Comanche Peak, providing Applicants' responses to the Board's questions con-cerning the ccmputerization of nonconformances. These questions were set forth in the Board's September 20, 1983, Memorandum.

Mr. Tolson does not address one aspect of Question 3 (regarding flow charts) in that there is only one step to the process which is the subject of the question. Wej)trusttheaffidavit is responsive to the Board's questions. lf f I /

Sincq1 ,

l Nichol s . Reynolds CcunsE f.o c Applicants cc: Service List 8310170412 831011 DR ADOCK 05000445 PDR

r <

i l

1 l

l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

) Dccket Nos. 50-445 and TEXAS UTILITIES GENERATING ) 50-446 COMPANY, et al.

~ ~ ' - - '

)

) (Application for (Comanche Feak Steam Electric ) Operating Licenses)

Station, Units 1 and 2) )

AFFIDAVIT OF. RONALD G. TOLSON REGARDING COMPUTERIZATION OF NONCONFORMANCES I, Ronald G. Tolson, being first duly sworn, do depose and state as follows: I am employed as the TUGCO Site Quality Assurance Supervisor at Comanche Peak. As such, I am familiar with the QA Program, including the computerized records systems at Comanche Peak. I have previously testified in this proceeding regarding the QA program at Comanche Peak. A statement of my educational and professional qualifications was received into evidence as Applicants' Exhibit 20. This affidavit addresses the Board's questions regarding the computerization of nonconformances, set forth in its September 20, 1983 Memorandum.

I respond to each of those questions below.

l Board Question 1: Where are the computer systems located that track IR's that have open items?

The computers used for tracking purposes (including unsatisfactory (open) items documented on irs) consist of two Data General MV-8000 computers and one Data General C-350 l

o =

minicomputer. These are located on site in a restricted access building adjacent to the construction administration building (also adjacent to the records vault area visited by the Board in its June, 1983 site tour). Entry of data is accomplished through the use of input terminals located at several different areas at the Plant site.

1 Board Question 2: Who uses these systems and for what purposes?

The computer systems are u. sed by most site groups (e.g.,

Construction, Startup, QA/QC, etc.) for purposes of tracking items (including.open IR's) that require action by these groups.

These systems are also utilized by the CPSES Project Management Control Group for general management purposes.

Board Question 3: What is the process by which open items on IR's are entered into the computer system, including a flow chart of the passage of paper showing typical delays between each node?

Prior to mid-September, 1983, tracking of open items on irs was performed both manually (by logs) and with the computer.

l During that time, open items on irs were first transmitted by QC to the Construction group. Depending on the work ef fort involved to correct the discrepancy, some open items were entered into and tracked with the computer system. Accountability for closure of each open item was retained by QC. Experience with this process indicated the need for a more efficient method of operation from a schedule viewpoint. Accordingly, computer software was developed for this purpose. Currently, QC passes the open items

r (by copies of the irs) directly to both the Construction group and a group who inputs the IR to the computer system. Both transmittal to the Construction group and input to the computer system are intended to be completed within a day following the inspection. The time involved in closing an open item obviously varies depending on the magnitude of the effort required, as well as schedular considerations. In any event, QC continues to retain responsibility for closure of the open irs.

Board Question 4: Describe in detail the analysis that is performed in trending NCRs and irs. Describe the nature and frequency of follow-up actions, if any, that have been taken in response to these trending analyses.

As was demonstrated in the June, 1982, hearings, Inspection Reports that identify unsatisfactory conditions and Nonconformance Reports are both assigned a trend category by Quality Assurance personnel. Each quarter a report is prepared which lists the quantity, and/or percentages of unsatisfactory irs and NCRs by category and discipline. (Applicants' Exhibit 51; Tr. 1638-44, 1652 and 1666; CASE Exhibits 46-50.)

Conditions considered to reflect adverse trends are regularly corrected through management meetings or formal Corrective Action Requests. Communication between QC and craft supervision has also been used to correct adverse trends (e.g.,

CASE Exhibits 47A-D, 48C and 498).

i

y. ---,___m-L J!teni OcestiAm 5: In tzending do:n <m nmrt Ilfs; um.C F.C?b?

Yes Une trer#. nsalyr.is is ceux1ucted an n ana:Ar.fu.cCory ins and M .iisutx:G durinty n nyasytur, ikoC1.r ur not tin: Ltcta nas also cIxnaad during the spurter.

/'

l ,Cf s'  ?:

! 74u($,f'R?g.IDyf@g

. .V.um:1a C. Ytsh;1m ch:st.y of Emervu)) } Schucribed und ru:rn to h6ayE :te State of % uis ) this lith Chy of t:cicator, J9413. -

- t l

(

i

, \

'4 \

_w a cse ~ ~Q_ -

2n'.k y 2slaic I ;1 l i' I ,

i 1

'T'his is a telecopy -f acsimile. The criqinal will be transmitted l

'l under seoarate cover .: I

! l

-I

!l u.l .

if L 2 m,2 4 Pet ik*

. I' a!!

N.!,N

'h -

s l

l E

e l

.> .is  ?

UL

<n 1U I:f a