bin B Q@W," INDIANA QMICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 October 10, 1983 Mr. J.G.
Keppler, Regional Administrator United States Nuclear Regulatory Commission Pegion III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket Nos. 50-315
Dear Mr. Keppler:
This is to confirm a telephone report made by our Mr.
B.A.
- Svensson, Assistant Plant Manager, to your Mr. W. Shafer at 1307 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.973135e-4 months <br /> and to Mr.
E.R.
Swanson, Senior Resident Inspector, at 1317 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.011185e-4 months <br /> on October 7,
1983, at which time we informed them that the wrong values for the Ep(Z) were used for the incore detector computer code during the Unit 1 Cycle VII operation.
This could have allowed the Unit to exceed its F limit between normal surveillgnce flux maps as the Ep(Z) term accobnts for the reduction in the Fg (El) curve due to an accumulation of burnup prior to the next flux map.
As required by Technical Specification 6.9.1.12, a followup report will be submitted within 14 days.
Sincerely, g'/
~
W.G.
- Smith, r.
Plant Manager
/bab cc:
John E. Dolan M.P.
Alexich om R.F.
Kroeger 38@
H.
Brugger OJ E.
Swanson/N. DuBry, RO:III no R.C.
Callen, MPSC 08 G.
Charnoff, Esq.
y J.M.
Hennigan nu R.O.
Bruggee INPO f4 PNSRC dm J.F.
Stietzel CSU)
E.L.
Townley q'n-7
{
,w Dir., IE (40 copies) ef iu v)O Dir., MIPC (4 copies) f C.2 O