ML20080R097

From kanterella
Jump to navigation Jump to search
Telecopy Ro:On 831006,walkdown of Safety Injection Sys Pipe Hangers Revealed Overloaded Condition on Base Plate & Anchor Bolts of Hanger H214.Caused by Error in Design Analysis.Hanger Support to Be Redesigned
ML20080R097
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/07/1983
From: Krich R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8310170351
Download: ML20080R097 (1)


Text

.

.C IPMBNAA BRID

(

E O

g[ [>

p - > y 4 i-OO5676C2eo 10/07/e3 EO ICS IPMMVID MVN 01741 MT VERNON IL 10-07 1004A CDT MVIB U

"I#

2 O

ICS IeMBDGS 1-OO4050C280 10/07/83 O

TLX CONSPOWER JKN O

279 CONSUMERS POWER JACKSON MI 09:41 EDT 10-07 O

PMS

~

~'

U.S.

O NUCLEAR REGULATORY COMMISSION PALISADES PLANT SECT CHIEF 799 ROOSEVELT AVENUE O

GLEN ELLYN IL 60137 MSG ft CBW351 CPCO GO MI AVE

'E O

ent1SnDES

[

??AMS??

a O VDEST
PALISADES j

O MSGID:NRC MESSnGe a

DEST: MSG CENTER MICH AVE qO O

TO:U S NUCLEAR REGULATORY COMMISSION g

FROM:s M KRICH O

TO:

O U S NUCLEAR REGULATORY COMMISSION ATTN:

PALISADES PLANT SECTION CHIEF e

799 ROOSEVELT AVENUE GLEN ELLYN, ILLINOIS FROM:

R M KRICH, PALISADES E

O CC:

VICE-PRESIDENT, NUCLEAR OPERATIONS, P-26-117B O

NUCLEAR LICENSING ADMINISTRATOR, P-24-614B O

3 THIS CONFIRMS PROMPT NOTIFICATION OF AN OCCURRENCE REPORTABLE PER O

T.S.

6.9.2.A(9).

FOLLOWUP INVESTIGATION SUBSEGUENT TO A RECENT WALKDOWN OF SAFETY INJECTION SYSTEM PIPE HANGERS HAS RESULTED IN mU THE DISCOVERY OF AN OVERLOADED CONDITION ON THE BASE PLATE AND O ANCHOR BOLTS (4) OF HANGER H214.

THE SUBJECT HANGER IS LOCATED IN O

PIPING BETWEEN THE SIRW TANK OUTLET AND THE SAFETY INJECTION PUMPS.

THE CAUSE HAS BEEN ATTRIBUTED TO AN ERROR IN THE DESIGN ANALYSIS.

O THE HANGER SUPPORT WILL BE REDESIGNED DURING THE CURRENT REFUELING O

MODIFICATION OUTAGE TO ACCOMODATE DESIGN LOADING.

THE OCCURRENCE IS PRESENTLY CONSIDERED TO BE AN ISOLATED CASE.

e JUSTIFICATION FOR

-$ O THIS CONCLUSION IS BEING INVESTIGATED.

3 O

INITIAL REPORT WAS MADE VIA TELECON TO NRC REGION III ON OCTOBER 6.

O 1983.

THE RESIDENT INSPECTOR WAS ALSO NOTIFIED ON OCTOBER 6, 1983.

y VP O

e TIME: 09:37 10/07/83 EDT N

CONNECT TIME :

64 SECONDS O

s 0959 EST e

0 0

1006 eST e

IPMBNAA BRID O

Eee o

O Eje 8310170351 031007 DR ADOCK 05000 9

3ggg3