m

.),

~

{l 7590-01 UNITED STATES OF AMERICA NUCLFAR REGULATORY COMMISSION l

i In the Matter of

)

)

l VIRGINIA ELECTRIC AND POWER COMPANY

)

Docket No. 50-281

)

)

(Surry Power Station Unit No. 2)

)

i

)

q EXEMPTION I.

Virginia Electric and Power Company (the licensee) is the holder of.

Facility Operating License No. DPR-37, which authorizes operation of Surry Power Station, Unit 2 (the facility), at a steady-state reactor power level-not in excess of 2441 megawatts thermal. The facility is a pressurized water

.f reactor located at the licensee's site in Surry County, Virginia. The license j

provides among other things, that it is subject to all rules, regulations, and

{

Orders of the U.S. Nuclear Regulatory Commission (the Commission or NRC) now or hereafter in effect.

II.

Section III.D.1.(a) of Appendix J to 10 CFR Part 50 requires the performance of three Type A containment integrated leakage rate tests (ILRTs) of the primary containment, at approximately equal intervals during each 10-year service period. The third test of each set shall be conducted when the plant is shut down for the 10-year inservice inspection program.

i

~

9503090394 950303 PDR ADOCK 05000281 P

,PDR

j I

c ~

~

III' y

},

'ByIletter dated February 14 -1995,'the licensee' requested temporary I'alief

.l from the requirement to perform a set 'of three Type A tests at approximately.

' equal intervals during each 10-year service period of the primary containment.'

The requested exemption would permit a one-time interval. extension of th' '

e third Type A test by approximately 15 months-(fron.the February 1995 refueling outage, to the May 1996 refueling outage) and would' permit the-third Type A'.

test of the second 10-year inservice inspection period to not correspond w'th i

the end of the current American Society of Mechanical Engineers Boiler and.

Pressure Vessel Code (ASME Code) inservice inspection-interval.

i The licensee's. request cites the special circumstances of 10 CFR 50.12, l

paragraph (a)(2)(ii), as the basis for the exemption.

The licensee points.

.out that the existing Type B and C testing programs are not being modified by q

this request and will continue to effectively detect containment leakage caused by the degradation of active containment isolation components as well l

y as containment penetrations.

It has been the experience at Surry Unit 2 during the Type A tests conducted from 1985 to date, that the Type A tests have not identified any significant sources of leakage in addition to those found by the Type B and C tests.

During operation, the Surry Unit 2 containment is maintained at a subatmospheric pressure.(approximately 10.0 psia) which provides a good indication of the containment integrity. Technical Specifications require the containment to be subatmospheric whenever Reactor Coolant System temperature and pressure exceeds 350*F and 450 psig, respectively.

Containment air i

partial pressure is monitored in the control room to ensure Technical

'1 m

f<

j

]-

I h[ %

s]

l n '

i

'C Specification compliance.

If the containment air partial pressure increases Ei

. above the established Technical Specification limit, the unit is required to-

~.

l

' shut'down.

p.

j IV.

j l

i In the licensee's February 14, 1995, exemption request, the licensee stated that special circumstance.50.12(a)(2)(ii) is applicable to this' I

situation, i.e., that application of the regulation is 'nct necessary to-achieve the underlying purpose of the rule.

Appendix J states that the leakage test requirements provide for periodic verification by tests f the leak tight integrity of the primary reactor 1

3 containment. Appendix J further states that the purpose of the tests "is to 4

assure that leakage through the primary reactor containment shall not exceed' the allowable leakage rate values.as specified in the Technical Specifications.

or. associated bases".. Thus, the underlying purpose of'the requirement to j

i perform Type A containment leak rate tests at intervals during the 10-year service period is to ensure that any potential leakage pathways through the 1

containment boundary are identified within a tims' span that prevents

)

significant degradation from continuing or becoming unknown.

The NRC staff has reviewed the basis and supporting information provided l

by the licensee in the exemption request. The NRC staff has noted that the licensee's record of ensuring a leak-tight containment has improved markedly l

since 1985. All "as-found" Type A tests since 1985 have passed and the results of the Type A testing have bee's confirmatory of the Type B and C tests which will continue to be performed. The licensee will perform the general

f,[ n l

I, i

b --

1

~

j containment inspection although it is only required by Appendix J (Section

'V.A.)'to be' performed in conjunction with Type A. tests.

The NRC staff; considers that these inspections, though limited in scope, provide an'

)

4 important added level of confidence in the' continued integrity of the '

containment boundary.-

The Surry Unit 2 containment is of the subatmospheric design.- During-

. i operation, the containment is maintained at a subatmospheric pressure (approximately 10 psta) which provides for constant monitoring of the containment integrity and further obviates thelneed for Type'A testing at this I

time.

If the containment air partial pressure exceeds the established I

Technical Specifica' ion limit, the unit must be shut down.

t The NRC staff has also made use of a draft staff report, NUREG-14g3,

- t which provides the technical justification for the present Appendix J rulemaking effort which also includes a 10-year test interval for Type A P

tests. The integrated leakage rate test, or Type A test, measures overall.

containment leakage. However, operating experience with all types of containments used in this country demonstrates that essentially all containment leakage can be detected by local leakage rate tests (Type 8 and.

'l C). According to results given in NUREG-1493, out of-180 ILRT reports covering 110 individual reactors and approximately 770 years of operating-history, only 5 ILRT failures were found which local leakage rate testing could not detect. This is 3% of all failures. This study agrees well with previous NRC staff studies which show that Type B and C testing can detect a

. very large percentage of containment leaks.

4 J

+b-

+-

r

m i

The Nuclear Management and Resources Council (NUMARC), now the Nuclear Energy Institute (NEI), collected and provided the NRC staff with summaries of.

j data to assist in~ the Appendix J rulemaking effort. NUMARC collected results of-144 ILRTs fros 33 units; 23 ILRTs exceeded 1.0L,.

Of these, only nine were-not due to Type B or C leakage penalties. The NEI data also added another:

i perspective. The NEI data'show that in about one-third of.the cases exceeding Lallowable leakage, the as-found leakage was less than 2L,; in one case the leakage was found to be approximately 2L,; in one case the as-found leakage was less than 3L,; one case approached 10L,; and in one case the leakage was-1 e

found to be approximately 21L,.

For about half of the failed ILRTs the as-1 found leakage was not quantified. These data show that, for those ILRTs for,

- which the leakage was quantified, the leakage values are small in comparison

- to the leakage value at which the risk to the public starts to increase over the value of risk corresponding to L, (approximately 200L,, as discussed in i

?

NUREG-1493). Therefore, based on those considerations, it is unlikely that an l

extension of one cycle for the performance of the Appendix J, Type A test at i

Surry, Unit 2, would result in significant degradation of the overall containment integrity. As a result, the application of the regulation in these particular circumstances is not needed to achieve the underlying purpose of the rule.

Based on generic and plant specific data, the NRC staff finds the basis l

for the licensee's proposed exemption to allow a one-time exemption to permit a schedular extension of one cycle for the performance of the Appendix Type A test, provided that the general containment inspection is performed, to be acceptable.

'm

+

w

..we

,_ + _

e

~-.

e

-i j

g....,,

Pursuant to 10 CFR 51.32, the Commission has determined that granting-this Exemption will not have a significant impact on the environment (60 FR-11997

).

This Exemption is effective upon issuance and shall expire at' the completion of the 1996 refueling outage.

FOR THE NUCLEAR REGULATORY COPMISSION 0

I hd hrfor Division of React Projects - I/II-Office of Nuclear Reactor Regulation Dated at Rockville, Maryland, this 3rd day of March 1995 f