ML20080P580
| ML20080P580 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 10/04/1983 |
| From: | Bradley E PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| GOVT-1-1(NRC), NUDOCS 8310070243 | |
| Download: ML20080P580 (3) | |
Text
4 4
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101
'"* " " f,[,",[,",,",' "' ' "'
12 :51 e 41-4000 6..u
. 6 GUGEN E J. BR ADLEY assoceave.assama6 c.ugssk DON ALD BLANKEN QUDOLPH A. CHOLLEMI O. C. MI R M H A LL T. H. M AH ER CO RNELL October 4, 1983 PAUL AUERBACH assesvasov.ssesna6 coun. 6 EDW ARD J. CULLEN. JR.
THOM AS H. M BLLER. JR.
8REME A. McKENN A
.u..
6 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Limerick Generating Station, Units 1 and 2 Additional Information for NRC Licensing and Qualification Branch (LQB) Open Item.
Reference:
PECO and NRC Conference Call Dated September 29, 1983 File GOVT l-1 (NRC)
Dear Mr. Schwencer:
l Enclosed is the revised draft FSAR page change insert A.
This change adds the Superintendent - Nuclear Training Section to the OEAC as discussed in the reference conference call.
The attached draf t revision will be incorporated into the i'SAR exactly as it appears on the enclosure in the revision scheduled for November 1983.
Sincerely, 1
l l
l i
8310070243 831004 s
PDR ADOCK 05000352 A
'50 - 3 5 D 3 5 3 j
GLK/gra/J-3
)
Enclosure I
I l
Copy to: See Attached Service List
i N'
o s-cc: Judge Lawrtnce Brenner (w/o enclosure)
Judge Richard F. Cole (w/o enclosure)
Judge.Feter A. Morris (w/o enclosure)
Troy B. Conner, Jr., Esq.
(w/o enclosure)
Ann-P. Hodgdon, Esq.
(w/o enclosure)
Mr. Frank R. Romano (w/o enclosure)
Mr.. Robert L. Anthony (w/o enclosure)
Mr. Marvin I.. Lewis (w/o enclosure)
Judith A. Doruty, Esq.
(w/o enclosure)
Charles W. Elliott, Esq.
(w/o enclosure)
Jacqueline I. Ruttenberg (w/o enclosure)
Thomas Y. Au, Esq.
(w/o enclosure)
Mr. Thomas Gerusky (w/o enclosure)
Director, Pennsylvania Emergency Management Agency (w/o enclosure)
Mr. Steven P. Hershey (w/o enclosure)
Angus Love, Esq.
(w/o enclosure)
Mr. Joseph H. White, III (w/o enclosure)
David Wersau, Esq.
(w/o enclosure)
(
+
Robert J. Sugarman, Esq.
(w/o enclosure)
Martha W. Bush, Esq.
(w/o enclosure)
Spence W. Perry, Esq.
(w/o enclosure)
Atomic Safety and Licensing Appeal Board (w/o enclosure)
A[omic Safety and Licensing Board Panel (w/o enclosure)
Docket and Service Section (w/o encicoure)
Jay M. Gutierrez, Esq.
(w/o enclosure) t i
~
k
I 4
o Insert A, Pg. 13.4-8 A corporate ISEG groun and the Operating Experience Assessment Committee will complement the Limerick ISEG in the performance of independen,t safety assessment functions.
The corporate ISEG group will be composed of at least two dedicated, full-time engineers, each with a bachelor's degree in engineering or related science.
This group will (1) evaluate internhl plant upset reports, CA audit reports and Plant Operating Review Committee minutes; (2) screen external operating i
experience information and distribute portinent information to the Limerick ISEG; (3) maintain the implementation status of recommedations contained in significant operating experience information, such as General Electric Company's Service Information Letters and the Institute.of Nuclear Power Operations Significant Operating Experience Reports; (4) track implementation status of significant corrective action with regard to ISEG_ recommendations; (5) provide on-site technical assistance, when required, to assist in Limerick ISEG I
L investiaations; and (6) provide an interface between the Limerick ISEG and Engineering and Research Deoartment personnel, located in the corporate offices, who design ple.nt modifications.
The Operating Experience Assessment Committee will be composed of the Operations Engineers: from plant staff from both Limerick and Peach Bottom, engineers'from ISEG groups at both Limerick and Peach Bottom, the Superintendent-Nuclear Training l
Section, an engineer from Electric Production Department's Quality Assurance Division, an engineer from Electric Produc, tion Department's Licensing Section and engineers from Engineering and Research Departments's Mechanical Engineering and Electric Engineering Divisions.
The members will be degreed engineers that have, as a minimum, several years of nuclear plant operations or design experience.
The Chairman of the committee will be the Engineer-In-Charge of the Nuclear Safety Section.
1 The Vice-Chairman will be the Senior Engineer-Special Projects of l
.the Licensing Section.
The committee members will receive, on a continuing basis, significant internal and external operating experience information, and will meet monthly to discuss it.
nais committtee will provide a broad inter-disciplinary review and may make recommendations on improving operations, procedures, training, and maintenance.
The ISEGs will inform the committee with results of their reviews of operating experience and operating problems.
This committee will facilitate the exchange of information on operating and design problems encountered at both Limerick and Peach Bottom.
Also, since the Limerick and Peach Bottom plant designs are similar, many of the Peach Bottom ISEG's assessments, particularly in 'the' areas of design, training,' corrective maintenance and, to some extent, operations, may be directiv applicable to Limerick and vice-versa.
The Peach Bottom ISEG will be similar in composition to and will have similar responsibilities as the Limerick ISEG.
- _ - _ _ _ _ _