ML20080P239

From kanterella
Jump to navigation Jump to search
Ro:On 830929,during Insp of Containment Lower Vol,One Drop Per Second Leak Discovered on Nonessential Svc Water Sys. Leak Originated at Packing on Manual Isolation Valve. Followup Rept Will Be Submitted within 14 Days
ML20080P239
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/29/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8310060369
Download: ML20080P239 (1)


Text

- e 1 O

L";",,, INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman. Michigan 49106 (616) 465-5901 September 29, 1983 Mr. J. G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License: DPR-58 Docket No.: 50-315

Dear Mr. Keppler:

This is to confirm a verbal report made by Mr. B. A. Svensson, Assistant Plant Manager to your Mr. W. W. Shafer, Chief Projects Branch 2 on September 29, 1983, at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br />. At that time Mr. Svensson advised Mr. Shafer that during an inspection of the Unit One containment lower volume a one drop per second leak was discovered on the Non Essential Service Water System. The leak originated at the packing on a manual isolation valve. A follow report will be submitted within 14 days in accordance with Technical Specification 6.9.1.12.

We wish to reiterate our concerns regarding the reportability of this i

type of event as we have on three previous occasions (i.e. transmittals of Licensee Event Reports81-028 on July 20, 1981,83-055 on July 18, 1983 and 83-076 on August 31, 1983). In your response to the above mentioned July 20, 1981 transmittal, the statement was made that "We j intend to discuss the subject with NRC reporting requirements during future meetings with you and other representatives of the Indiana &

Michigan Electric Company".

( Once again, if at all possible, I would like to pursue the outcome of these meetings with you in an effort to establish criteria for reporting leaks of this type.

G. mi h Plant Manager cc: J. E. Dolan M. P. Alexich R. O. Bruggee, EPRI R. F. Kroeger B. Germano R. C. Callen, MPSC G. Charnoff, Esq. J. M. Hennigan INP0 PNSRC J. F. Stietzel E. L. Townley E. R. Swanson RO: III N. E. DuBry R0: III Dir., IE (40 copies)

Dir., MIPC (4 copies) 8310060369 830929 PDR ADOCK 05000315

')T S PDR OCT 31983 y(40 L w