ML20080P113
| ML20080P113 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/31/1984 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8402220440 | |
| Download: ML20080P113 (13) | |
Text
'
h OPERATING DATA REPORT DOCKET NO. 'io - 318 DATE 2/13/84 COMPLETED BYElaine Irtito TELEPilONE301-787-5361.
OPEILATING STA T US
- 1. Urd: Name: -Calvert, Cliffs # 2 Notes Revision
- 2. Reporting Period. Novenber,1983
- 3. Li:cnsed Therm.11 Pow er (MWI). 2J.0.0 911
.t. Nameplate Rating IGriess MWei-845
- 5. Design Elearies! RatingINet MWe):
860
- 6. Statimum Dependab'e Capacity (Cross MWep:
82s L
- 7. Masiniem Dependable Capacity INet MWel:
- 8. :I Cna. ges Oect.:in Capseity Ratings tiseens Nur.ter 3 Through 7) Siner Last Report.Ci e Ressens.
- 9. Power Lese! To hhich Hestricted. lf Any INet 4twel:
- 10. Ressuea For Restrictii:ra. lf Any:
This Montb Ye..to Date Ct.n.abtive j
II. Ilours in Reporting PerioJ
- 12. Number Oi Hours Reactor Was Critical
- 13. Reactor Rescrie Shutdown Hours
- 14. Hours Generator On Line
- 15. Urut Resene Shi:tdown linurs
- 16. Gions Thermal Energy Ger.erated IMWHI
- 17. Gross Elecifical Energy Gsnerated IMWits 5.543,207
_ 37,633,969
- 18. Net Electrie.il Energy Generated IMWH, 490,134 l
- 19. Onit Senice factor
- 20. Unit Assalability Factor
- 21. Unit Capacity Factor Using MDC Ne
- 22. Unit Capacity Fertor Uning DER Nett
- 23. Unit Forced Outage Mate
- 24. Shutdowns.icheduled O et Nest 6 Monthi tType..Date and Duration of Eacht.
- 25. If SFist Down At End Of Rep,.rt Period. Estimated Date of Startup:
- 24. Union in Test Staties tPri.it to commercial operstioni.
Focecess
[ Achie.ed
^\\
INITIA L CRITICALITY INITl4L ELECTRICITY COMMERCIAL OPER ATION 8402220440 840131 PDR ADOCK 05000317 (ST'71 R
OPERATING DATA REPORT DOCKET NO.
50 11R DATE 7/n/A4 COMPLETED BY Elaine Totiro TELEFl!ONE 3U87_%3 OPE RATING STA TUS
- 1. Uni: Name: Calveer Cliffs # 7 N08
Revision
- 2. Reportmg Period. Deconber,1983 2h
- 3. Li:ensed Therr.ul Power (SIWr).
- 4. Nameplate Rating (Greos MWe s-911 E
- 5. Design Ele.tries!Ibsing(Net MWel:
860
- 6. hlasimum Dependable Capacity IGross MWes:
825
[
- 7. Masimum I;ependable Capacity (Net MWel:
- 8. If Ch.. ges Oecer in Cap.,cist Rasings itse.ns Nurwer 3 Through 7' Since Last Report.Gise Reasons.
- 9. Pow er Lesel To which He iricted. if Any (Net 4tWel:
- 10. Ressous For Restrictieru. if Any:
This &fonth Ys..to.Dat e Ct.nabti e
- 11. Ilours in Reporting PerioJ
- 12. Number OiHours Reactor was Critical
- 13. Resetor Resene shutdown Hoers l.
- 14. Hours Generator Online
- 15. Unit Resene Shutdown linurs e
16 Cross Thermal Energy Grr.erated IMWHi
- 17. Cruss Electrical Energy Genersted IMWill l
- 18. Net E!:ct-ical Energy Generated (MWH
% 9,793 6,113.000 38,203,762 l
- 19. Unit Senice Factor
- 20. Unit Asailability Factor j
- 21. Unit Capacity Factor IUsing MDC Nets
- 22. Unit Ccpacity Factor IUsing !)ER Neil
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled O.er Nest 6 Atonths (Type. Date, and Duraison of Eacht:
- 23. If Shut Down At End Of Repers Permd. Estimated Date of Stastup:
- 24. Units in Tess Status (Prios to Commercial Operationi.
Forecast Achie std INITIA L CRITIC A LITY
~
INITl4 L ELEC TRICITY l
COMMERCIAL OPER ATION l
(Y7 )
-~ l
-(
s OPERATING DATA REPORT DOCKET _NO 50-317-DATE 2-13-84 COMPLETED BY' ELAINE'LOTITO TELEPH0HF.
.(301)787-5363 t'
A 1
L.
T OPERATI'G' STATUS'
+
M
- M M u'IMMMXXMM MMMMM K
). UNIT HAME : CALVERT CLIFFS HO. 1 2._REEDRIlHG_ PERIOD _X_ JANUARY _1984 3.lLICENSED THERMAL POWER (MWT)fw 2,7001 '
.r
.tiMAMEP1 ATE _RATINGitGROSS_MWE1_Mi91*-
- 5. DE' SIGH ELECTRICAL RATING'CHET MWE)-'t 845 4 _ MAXIMUM DEEENDABLE_ CAPACITY _ GROSS _MWE_M_868 7.LMAXIMUM DEPENDABLE CAPACITY-'(NET MWE) N 825
_A.__IE_ CHANGES _0CCUR_IH_ CAPACITY _RATINGSLLIEMS_HUMBER_LTHROUGH_7LSIHCE LAST_ REPORT _GIVE_ REASONS _M'.
- 9. POWER LEVEL TO WHICH RESTRICTED (HET-MW) M
_10 REASDHS_FOR_RESTRICTIDHS-a
' MONTHLY YRMT0mDATE CUMULATIVE MMMMMMM MMMMMMMMMM MMMMMMMMMM
- 11. HOURS IH REPORTING PERIOD 744.0 744.0 76573.0
_12_HUMBER_DE_ HOURS _ REACTOR _ MAS CRITICA8 726J 726.5 60693.4
- 13. REACTOR RESERVE SHUTDOWN HOURS.
0.0 0.0 1887.9
- 14. HOURS GENERATOR OH LINE'
'720.6 720.6-59466.5
- 15. UNIT RESERVE SHUTDOWH HOURS. -
~0.0 0.0~
0.0 46_ CROSS _ THERMAL ENERGYaGENERATEDCMWH3 1897999_
1897999_
146040294.
'17. GROSS ELECTRICAL EHERGY GEHERATED(MWH) 648747.
648747.
- 48076152,
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 622191.
622191.
45857156.
- 19. UNIT SERVICE FACTOR 96.9 96.9 77.7
_2D._UMLI._AVAILABILLIL FACIDD 96J 96.9 77-.7 73.5 P21. UNIT. CAPACITY FACTOR'(USING MDC NET).
.101.4 101.4
~ 70.9.
- 22. UNIT CAPACITY FACTOR (USING DER HET)
'99.0 99.0 s
- 23. UNIT - FORCED OUTAGE RATE 3.I' 3.1 7.5 2A _SHuTDOMHS_SCHEDULEDJVER THEJEXT_&_MONTMS_LTYPELDATE,_ANDJURATIONLJ
- 25. IF SHUTDOWH AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
26._UM LIJ H _T EST._S T AT US _( P RI O R_CDAMERCI A L_DEERATI ON )
FORECAST ACHIEVED IHITIAL CRITICALITY IHITIAL ELECTRICITY.
I
-COMMERCIAL. OPERATION..
c L
fl -_ _
_.1 I~
O O
G.
OPERATING.. DATA REPORT DOCKET-NO 50-318 DATE 2-13-84
' COMPLETED BY ELAIAE LOTITO TELEPPCHE (3013787-5363 OPERATING STATUS
.c v uxxxxxxxxxxxxyv I. UNIT HAME : CALVERT CLIFFS NO. 2 2__REEDRIING_P FR TOD_XJANUARL1SM
,3.LLICENSED THERMAL-POWER _(MWT) M)2,700 3 fAMEP1AIE_. RATING _(GROSS.MWELx_911'
- 845
- 5. DESIGN ELECTRICAL: RATING '(NET MWE)
J f.AXIn12LDEEfHDALLE_CAPACITLGRDSS MWE_E_860 -
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) N 825'
.NI 1F CHANGES JCCUR_IMiCARACIILRAIIMGS[1TEMS_MUMBEL3_IHRDUGR_71_SINCE_LAST REPORL GIYE_REASGNS_M
- 9. POWER LEVEL TO WHICH RESTRICTED (HET FG) *
.10- P F"DMSJlR_RESIRICTIDMS -
1
-MONTHLY-YRMTOMDATE
_ CUMULATIVE wwwwwww wwwwwwwwww wmwwwwwwww II. HOURS IN REPORTING PERIOD 744.0 744.0 59928.0
_.12._HUMBEPLEE_HDUPJL REACIDR_1!15_CRII1CAf.
7 4_4.E.
_244.0 5C671.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 957.8
)
- 14. HOURS GENERATOR OH LINE 744.0 744.0 49859.2
- 15. UNIT RESERVE SHUTDORN HOURS-0.0
- 0.0' O.0 16 r'nSS - THER!1AL_ENERGLGENERAIEDCMWH1 1990961_
1990961.
123832655.
- 17. GROSS ELECTRICAL EHERGY GENERATED (MMH) 657420.
657420.
40726706.
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 630090.
630090.
33833852.
- 19. UNIT SERVICE FACTOR 100.0 100.0 83.2
- 20. U511I_1VAltigILIILEACIn?
130 n 10L4 33.7
>21. UNIT CAPACITY FACTOR (USING MDC NET)-
102.7-102.7 79.1 l22. UNIT CAPACITY FACTOR (USING-DER HET)-
100.2 100:2-76.7 i23. UNIT-FORCED 0UTAGE RATE.
0.0
-0.0 5.8 d 4 _iHUIDmf*K RCHEDULED_DVrp mE NEXL6_MGMTMS._17YPE _DATE._AND_DURATIDH3 l
ll 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
W ItMILI!LIEST STAIUS_IERIDLcf"FPCIAL_DRERAIIDS) -
FORECAST.
ACHIEVED INITIAL CRITICALITY
)
INITIAL ELECTRICITY tJ
. C0ft'1ERCI AL OPERATION -
l ln
AVER AGE D AILY UNIT POWER LEVEL DOCKETNO. _50 -317 UNIT.Calvert Cliffs # 1 DALE 2/13/84 COMPLETED BY Elaine IAtito TEl.EPtit1NE -301-787-3363 MONTH T-rv 14R4 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER t EVEL (MWe Neil IMWe Net)
- I 884 37 885 2
R%
18 882 3
N I9 883 4
RR6 20 882 5
886 3g 781 6
886 22 858 7
RR5 23 884 8
RR7 24 882 9
RR7 _
25 880 10 RR7 26 881 II RR6 27 506 12 888 225 33 13 RRR 29 646 14 R17 30 877 33 885 879 3g 16 AR6 INSlRUCTIONS On this format hs: the nerage daily unit p.wer levelin MWe. Net for each day m the reportinginonth. Compete to the nearest whole nw;awatt.
(9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. ML._318 UNIT Calvert Cliffs # 2 DATE 2/13/84 COMPLETED BY _ Elaine latito TELEPtf0NE 301-787-5363 MONTil _ Ja-wry, 1984 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe NetI 3
853 848
,7 2
8,5,2_
gg 850 3
837 849 g9 4
853 N
20 5
853 810 yg 6
851 849 22 7
853 850 33 850 849 g
3 9
N 856 25 10 848 850 26 1I 848 8%
37 12 845 W
yg 13 847 850 3
14 824 N
30 I5 847 850 3g 16 846 l
l INSTRUCDONS On this fortnat,lat the aerage duly unit power levelin MWe. Net for each day in the reporting anonth. Compete to the r.carest whole nwpwatt.
l l
19/771 l
l l
l L
50 - 317 F
u,Au r No.
UNI T SHUTDOWNS AND POWED REDUCT10NS calvert cliffs # 1 L* NIT N AME I) ATE 2/13/84 COMPLETED gy Elaine inrien REPORT MONill hnrv 1984 TELEPHONE 301-787-53fG t
E E
5, g
'h j []
Laccesce
,3 r,
- di Cause & Currc6Isve N...
Date E
ti ?
{
25&
Event
[- ?
Attion to 4
j@
d 3 g, =!
Repost a JIC
,E '
Pievent Recurrer.ce t
g w
l 84-01 840127 F
23.4 A
3 IA INSHU Fb1 function of the reactor protection p
trip systen.
{
's r
l I
3 4
? For6ed Reason.
M ethod :
E sjnN G. Inst r uctions S. Scheduled A Equipment Failure (Esplains
! Mano d for Prepar.stion of Data B-Mainterun e of Te:t 2-Manuai 3, ram.
Entiv Sheets for Licenser C Retiseter;,
3 Autonas.; sciain.
Esen Repurs t LER) Fde (NUREG-D Regt:tator) Restsi tion 4 Oontinu.ition Plbli
- 1. Oper.it.u Tiaining A bans: I:ununation 5-1.oM F. dm t i m.
F Adininistratne 5
G 4)peration.1 Eeror itspleini E stiibii I - Saine Sourse l'7/77)
Il4'ther iF splain)
tr.A u. t.NO.
50 - 3;9 UNIT SHUTDOWNS AND POWD] REL'UCT10NS l' NIT N AME Calvert C1iffc: e?
DATE ' 2/11/Ra Elaine lotito F
COMPLETED BY REPORT MONT11 tw a rv iqg TELEPHONg 301-787-5363 3g
'h E ".:;
Lwensee
,E s, K
Cause & Currective l-N...
Danc L
- s E
{
2iE Event s.'
pi Action to j@
3 ;f, =!
Repost a 40
,E '
Fresent Recurrer.cc v
d.
NOIE:
r No. 2 unit experienced load reduction at various loads due to Moisture Separator Reheater tube leaks.
t l
1 4
F Fossed Reason.
M ett.ud :
E s!nt si G. Instructions S. Scheduled A.Equiprnent Fa: lore (Esphin)
I. Man u.il for Prepar.stion of Data B.Maintensnee of Te t 2-Manuai 3, ram.
Ensiv Sheets for Licensee C.Ref uct.cg 1 Autonat.: sciam.
Esen Recuri (LE RI File (NUREG-D Regt:tas. r> Resin, tion 4 Oontinu.ttion Olbil
- 1. Operatos Tiaining A Lians: E unnnation 5_nga,j p,q,3. t i or.
F. Administ rai ne
?
9-Ott.a G-Operation ! Essos IE spion E shibit I Sanne Sonese PJ/77) ll4'ther I F splain)
O
t February 3,1984 REFUELING INFORMATION REQUEST 1.
.Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.
Scheduled date for next Refueling Shutdown: March 23,1985 3.
Scheduled date for restart following refueling: May 26,1985
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
February 20,1985 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 796 Spent Fuel Pools are common to Units 1 and 2 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b)0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
February 3,1984 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. ' Scheduled date for next refueling shutdown: April 21,1984.
- 3. Scheduled date for restart following refueling: June 10,1984.
- 4..Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?
Resumption of operation ' after refueling will require changes to Technical Specifications. The changes will be'such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and suppcrting information.
March 3,1984
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 796 Spent Fuel Poolis common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number
- of fuel assemblies.
(a) 1830 (b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool
.' assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
_ ~._, _... _ - _ _, _ - _ _ _ _ _ _ - __ _
-.. ~
SUMMARY
OF UNIT 1 OPEMTING EXPERIENCE JANUARY 1984 1/1 At the beginning of this reporting period, Unit I was operating at 877 MWe with the reactor at 100% power.
1/14 At 0205 load was reduced to 718 MWe to troubleshoot a suspected problem on circulating water pump exciters. Resumed full load operation (884 MWe) at 1800.
1/21 At 0450 load was reduced to 745 MWe to repair 12 heater drain tank normal level control valw.
1/22 Resumed full load operation (883 MWe) at 0545.
1/27 The reactor tripped at 1345 when all reactor trip breakers opened simultaneously without apparent cause.
1/28 At 0717 the reactor was brought critical and paralleled to the grid at 1313.
1/29 At 0025 returr. to full power was delayed when load was reduced to 564 MWe to repair an oil leak on 12 Steam Generator Feed Pump. Full load operation (876 MWe) was resumed at 2310.
1/31 At the end of this reporting period, Unit I was operating at 878 MWe with the l
reactor at 100% power.
l-l i
f I
I I
l 1
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE 3ANUARY 1984 1/1 At the beginning of this reporting period, Unit 2 was operating at 853 MWe with the reactor at 100% power.
1/3
. At 0410 load was reduced to 815 MWe due to the Plant Computer being out-of-service. Resumed fullload operation (847 MWe) at 1720.
1/14 At 0205 load was reduced to 747 MWe to conduct turbine control valve testing.
Resumed fullload operation (849 MWe) at IILS.
1/21 At 0600 Control Element Assembly (CEA) 28 dropped into the core. Reactor power was immediately reduced to less than 70% in accordance with Technical Specifications. CEA 28 was withdrawn at 0640. Full load operation (850 MWe) was resumed at 1300.
1/31 At the end of this reporting period, Unit 2 was operating at 847 MWe with the reactor at 100% power.
r SALTIMORE
~
GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE. MARYLAND 21203 L
JOHN J. DREHOFF MANAGER Fossil Power Department February 13,'1984 Director Office of Inspection and Enforcenent U. S. Nuclear Regulatory Crmnission Washington, DC 20055 ATIDI : Doctanent Control Desk Centlemen:
Enclosed herewith is the January 1994 - Operation Status Report for Calvert Cliffs'No.1 Unit,
- (Docket 50-317) and Calvert Cliffs No. 2 Unit, (Docket 50-318).
'. Sincerely, r
.ho k.
E. M. lotito Perfonmnce Data Analyzer Production Economy and Results Unit Fossil Pcuer Department Enclosure cc: &ssrs:
C.
McCabe, Jr.
R.
Architzel R.' R. Mills L. Russell P.
Ross P.
Sierer, Jr.
- ~
M.
Leebe C.
Shoanaker i<
D. ~ Reilly R.
Ash T.
Migette V.'
Stricklin J.
Tiernan A.
Lundvall DL:fsd/eni
. 1 ff I
_