Forwards Rev 2 to Util Response to Suppl 1 to NUREG-0737, Including Control Room Review Final Rept & Supplemental Rept.Rev Does Not Include Implementation Schedule for Control Room Mods
ML20080N708
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/16/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20080N712 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8402220325
Download: ML20080N708 (2)


Text

DUKE POWER GOMPANY P.O. HOx 33180 CHARLOTTE, N.C. 28242 HALB. TUCKER ruternoxz ma enxernawr (704) 373-4531 February 16, 1984

= = =*= -

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E._G. Adensam, Chief Licensing Branch No. 4

Subject:

Duke Power Company McGuire Nuclear Station Docket Nos. 50-369 and 50-370

Dear Sir:

Please find attached five copies of Revision 2 to the Duke Power Company Response to Supplement 1 to NUREG-0737 for McGuire Nuclear Station. This document was originally submitted as an enclosure to my letter of April 14, 1983.

The attachment includes the Duke Control Room Review Final Report and the McGuire Units 1 and 2 Control Room Review Supplemental Report. The concents of these two reports comprise the control room review summary report for

'McGuire Units 1 and 2 as required by paragraph 5.2b of Supplement 1 to NUREG-0737.

This revision does not include the implementation schedule for control room modifications resulting from the completed McGuire Control Room Review. The implementation schedule is currently under development and will be contained in a subsequent revision to be submitted in accordance with the original com-mitment date made in the April 14, 1983 Duke response.

Instructions for inserting Revision 2 into the McGuire document are included as part of the attachment.

Very truly yours.

l.g.r Hal B. Tucker ph JSW:scs Attachments l h 9402220325 840216 PDR ADOCK 05000369 PDR y

- Mr. Harold R. Denton, Director

' Office of Nuclear Reactor Regulation Page-Two.

cc:

Mr.'J. P. O'Reilly, Regional Administrator Mr. W. T. Orders U.-S. Nuclear Regulatory Commission NRC Resident Inspector Region II McGuire Nuclear Station 101 Marietta Screet, Suite 3100 Atlanta, Georgia -30303 Mr.-R. A. Birkel, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory-Commission Washington, D. C.