Monthly Operating Repts for Jan 1984
ML20080M550
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 01/31/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8402210150
Download: ML20080M550 (8)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -

OPERATING DATA REPORT DOCKET NO. 50-d59 DATE 02-1" 84 COh!PLETED DY J. A. R3 vis TELEP110NE 704-373-7567 OPERATING STATUS

[

F McGuire Unit 1 Notes

  • NOTE: Nameplate Rating
l. Unit Name:
2. Reporting Periud: January 1. 1984-January 31. 1984 (Gross MWe) calculated as '

3411 1450.000 MVA x .90 power

~

3. Licensed Thennal Power tatht):

1305*

factor per Page fii,

4. Nameplate nating(Grow stw,g NUREG-0020*
5. Deu.gn Electrical Rating (Net siWei: 1180
6. .\laximum Dependable Capacity tGrow 51We):
7. hlasimum Dependable Capacity (Net alwe): 1180
S. If Changes Occur in Capacity Rating titems Number 3 Throu;h 7) Since Last Report.Gise Reasons
)

9.. Power Level To Which Restricted. lf Any (Net .\lwe):

10. Reasons For Restrictions. If Any: .

This Slonth Yr..to Date Cumulative

11. Hours in Reporting Period

.0 m .0 E @8.0

12. Number Of Hours Reactor Was Critical 728.G 728.6 12 801.6
13. Reacter Reserve Shutdown llours
14. Ilours Generator On Line 723.2 723.2 12 672.3 15.' Unit Resene Shutdown Hours - - -

- 16. Gross Therma! Energy Generated (>lWil) _2 222 932 2 222 932 29 660 001 -

~ 17. Gross Electrical Energy Generated (>lWH) 800 958 _,_. 800 958 10 318 123

18. Net Electrical Er ergy Generated (alWH1 770 710 __. 770 710 9 726 985

- 19. . Unit Service Factor 97.2 97.2 66.7

- 20. Unit Availability Factor 97.2 97.2 66.7

21. Unit Capacity Factor (Using StDC Neti 87.8 87.8 43.4
22. Unit Capacity Factor IUsing DER Net) 87.8 87.8 43.4

-23. Unit Forced Outage Rate 2.8 2.8 19.7

24. Shuidowns Scheduted Oser Nest 6 Stonths (Type. Date.and Duration of Eacht:

Refueling - February, 1984 --7 Weeks.

25. If Shut Down At End Of Repori Period. Estimated Date of Startup:
26. Units in Test Status (Pr.ior to Commercial Operationl: Forcesst Achioed INITI A L CRITICA LITY INITIA! I'.LEC1 RICliY c Cost ti;RCIAL Orl.RA flON
i. 8402210150 840131

-PDR ADOCK 05000269 ("U 7 l R PDR

__n-_ _ - - - - - - . - _ . -.._

AVERAGE D AILY UNIT ?OWER LEVEL DCCKET NO.

50-369 UNIT McGuire Unit 1 04TE 02-15-84 COMPLE7ED BY J. A. Reavis TELEPHONE 704-373-7567 January..1984 DAY AVERAGE DAILY power LEVEL DAY AVERAGE DAILY ?OWER LEVEL t.\tWe-Neti Olwe-Ner)

1116 g- 476 2 1116 g3 869 3 1116 gg 1123 4 1116 1119 20 5 1115 gg 1124 1115 6 n 1123 7 1120 1124 3

3 1122 ;4 1125 9 1123 1126

5 10 1122
  • 26 1127 1121 11
- 1127 12 1122 1127 3
13. 1123 1126 9

.g4 1123 742 30 g3 1122 3g 309 16 558 INSTRUCTIONS Cn :.:s fer :::t. tist :he r.er:ge 2:dy ;::tt ; wer :e.e ::t '.lWe Net ::t ese . ::. - .e . ,- m; ;. , t , .,..;,,

he r:e2 rest wricie . :epw::: '

.>-i

^

DOCKET NO. 50-369 UNIT SilUTDOWNS AND POWEll REDUCTIONS UNIT NAME McGuire 1 DATE 02/15/34 COMPLETED llY J. A. Reavis ItEpORT MONTil __yanuary, 1984 TELEpilONE 704--373-7567 1

i "i

, .5 E 'k 35'k Licensee ,E-r, h Cause & Cos teetive

. Ai; tion to N" . U 83e I ~$ '$ $ $ Event y3 h%l H

$C- E ~dg u fleport '* '4 0 j' Prevent Itcentrence 6

1p 84-01-01 F -- A -- CC VALVEX #4 go/ernor valve isolated ,

l 1 84-01-16 F 6.12 A 4 HI VALVEX Repair steam generator blowdown valve (reactor remained' critical) j l

2p 84-01-17 F -- D -- -ZZ ZZZZZZ Axial flux difference penalty time. l 3-p 84-01-18 F -- A -- CC VALVEX #4 governor valve isolated.

l 2 84-01-30 F 14.67 A 3 IA INSTRU 2/4 channels of overtemp delta T-while testing, one channel received i

! spike while another channel was in test .

4-p ZZ ZZZZZZ Axial flux difference penal ty time.

84-01-31 F --

D --

I 2 3 4 F: Forced Iteason: Method: Exhibit G. Instrnetions S: Scheduled A Equipment Failure (Explain) 1 Manual for Prepaution of Data 11 Maintenance of Test 2 .',l.mnal Scram. liniey Sheets for I.ieensee C. Refueling 1 Automatic Scram. Event l<eport (LER) File INtlitEG.

D Itegulatory ltestriction 4 Other (Explain) 0101)

E Ope.ator Training & Liev se lixamination F Administrative 5 G-Opciational liiror (lixplain) Exhibit 1 Same Somee 19/77) Il Other ( Explain)

O

(je

-DOCKET No: 50-369 UNIT: McGuire 1 DATE: 02/15/84-f

' NARRATIVE

SUMMARY

4

.- Month: January,1984 -

.. u -

'McGuire Unit l operated at,94% power for the-majority of the report period due e to the . isolation of a governor valve. . The unit experienced a n'anual reduction to 0% power to repair a steam generator blowdown valve which had failed closed.

?The unit'also' experienced a trip due to 2/4 channels 1ogic of overtemperature:

AT.--Received spike on one channel with another channel out for testing. (Both incidents less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration).

b

+

^ J

,~ f) .

n A4, t

4

- t

u MONTIEY REFUELING INFORMATION REQUEST McGuire Unit 1

1. : Facility name: ,

2.- Scheduled next refueling shutdown: February, 1984 ,

'3. Scheduled restart following refueling: April, 1984 ,

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Y88 .

If yes, what will these be? Technical Specificition changes needed to support transition to optimized fuel.

l l

l t-If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? No ,

5. Scheduled date(s) for submitting proposed licensing action and supporting information: November, 1983 .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or'new operating procedures). Optimized fuel to be used.

Improved thermal design procedure used in safety analysis 193

7. Number of fuel assemblies (a) in the core: ,

i .(b) in the spent fuel pool: 31 .

~ 8 .~ Present licensed fuel pool capacity: 500 .

Size of requested or planned increase: . l

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER-COMPANY Date: February 15, 1984 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 l

l 0 OPERATING DATA REPORT DOCKET NO.

DATE 02-15-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name: McGuire Unit 2' Notes : Nameplate Rating

' rep'rtin8 Period: January 1.1984 - January 31, 1984

~* (Gross Mwe) calculated as 1450.000 MVA x .90 power

3. Licensed Thermal Power OlWt): 170 4.: Nameplate Rating (Gross MWe1: 1305*

NUREG-0020.

'5 Design Eletrical Rating (Net MWe): 1180

5. Maximum Dependable Capacity 4 Gross MWel:
7. Alaximum Dependable Capacity (Net MWel: 1180 S. If Changes Occur in Capacity Ratings litems Number 3 Thmugh 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net MWel:
10. Reasons For Restrictions. If Any:

This Month Yr. to-Date Cumulative

11. - Hours in Reporting Period
12. Number Of Hours Reacter Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line

~15. Unit Reserve Shutdown Hour:: NOT IN COMMERCIAL OPERATION

16. Gross Thermal Energy Generated (MWH)

.I 7. Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Genersted (MWH) -

19; Urut Service Factor

20. Unit Availability Factor
21. Unit Cappeity Factor (Using MDC Net)
22. Umt Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each :

75; If Shut Down At End Of Report Period. Estimated Date of 5:artup:

26.- Units In Test Status iPrior to Commercial Operations: Forecast Achieved INITIAL CRITICA LITY INITIA L ELECTRICITY COMM ERCIAL OPER ATION (4/77)

McGUIRE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of December, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release contribution to whole body dose for December has been compared with the Technical Specifications annual value of 3 mrem; the total release for December was less than 10 percent of this limit.

The total station gaseous release contribution to any organ dose for December has been compared with the Technical Specifications annual value of 15 mrem; the total release for December was less than 10 percent of this limit.

l

-, e h Duxe POWER GOMPANY P.O. Box 33189 Cl!AHLOTTE, N.C. 28242

f. HALH.TOCKER retzenoxe

== = February 15, 1984 (704) ora.4sai t [

[. .. / . Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission l' Washington, D. C. 20555 l~ Attention: Document Control Desk I E

I:

ss Re: McGuire Nuclear Station Docket No. 50-269, -270

Dear Sir:

Please find attached information concerning the performance and operating

. status of the McGuire Nuclear Station for the month of January, 1984.

Very truly yours,

/Ar 4

/

e v Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Washington, D. C. 20555

. Atlanta, Georgia 30303

'Mr. Phil Ross Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station MNBB-5715 Washington, D. C. 20555 1NPO Records Center Suite 1500 1100 Circle 75 Parkway