ML20080K750

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Dec 1983
ML20080K750
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/31/1983
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8402160125
Download: ML20080K750 (2)


Text

r -- -

j r

s e c

OPERATING DATA REPORT DOCHET NO. 050-0325 DATE 01/20/84 COMPLETED DY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
2. PEPORTING PERIOD: DECEMBER 83 I i
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATINC (GROSS MWE): 867.0 1 1
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l I
6. HAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I i
7. MAX DEPENDABLE CAPACITY (NET MUE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 8760.00 59521.00
12. NUMBER OF HOURS REACTOR CRITICAL 675.06 2509.51 36397.98
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 661 72 2118.50 34088.53
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1534995.71 4531275.71 68427294.57

, 17. GROSS ELEC. ENERGY GEN. (MWH) 513353.00 1484863.00 22547051.00

18. NET ELEC. ENERGY GENERATED (MWH) 498486.00 1388721.00 21613840.00
19. UNIT SERVICE FACTOR 88.94 24.18 57.27
20. UNIT AVAILABILITY FACTOR 88.94 24.18 57.27
21. UNIT CAP. FACTOR (USING MDC NET) 84.81 20.07 45.97
22. UNIT. CAP. FACTOR (USING DER NET) 81.61 19.31 44.23
23. UNIT FORCED OUTAGE RATE 11.06 6.15 23.12
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY b\ -------- --------

O INITIAL ELECTRICITY -------- --------

/hN/

COMMERCIAL OPERATION -------- --------

8402160125 832231 gDRADOCK 05000325 PDR 1.16 - 9

.L ,

a.

CP&L Carolins Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 FILE: B10-13510C SERIAL: BSEP/84-0226 Mr. R.. C. DeYoung, Director

-Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT NO. 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 MONTHLY OPERATING REPORT

Dear Mr. DeYoung:

During a review of the December 1983 Monthly Operating Data an error was found in line 16 of our. report to you. The data was reported as:

This Year to Month Date Cummulative

16. Gtoss Thermal Energy generated (MWH) 1532756.53 4529036.53 68425055.39 The data should be corrected to:
16. Gross Thermal Energy generated (MWH) 1534995.71 4531275.71 68427294.57 This error was due to an incorrect entry of one day's core average exposure which caused the calculation of the thermal energy to be incorrect.

Enclosed for your file is the corrected Operating Data Report for December 1983.

Very truly yours, iT C. R. Dietz, General Manager Brunswick Steam Electric Plant LPH/jlh/LETSB1 Enclosure

- cc: Ms. J. C. Baker

. Mr. S. W. McDowell

.Mr. J. P. O'Reilly- q)-

Mr. S.'R. Rosen

_- - . - - - , - -