Forwards EDG Annual Rept for 1994,including Seven Items Requested in Regulatory Position C.3.b of RG 1.108 as Revised by GL 84-15 for One Invalid Test Failure of SONGS Unit 3 EDG 3G002 on 940727
ML20080K390
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/24/1995
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.108, RTR-REGGD-1.108 GL-84-15, NUDOCS 9503010092
Download: ML20080K390 (2)


Text

_

.. j 7. w

,g Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 wAtune.uAnsa February 24, 1995 m _,

MA6eAQt M OF NUCLEAR MEGtM A10MY AFF AsRG (F14) 464-4403 l

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Sutject: Docket Nos. 50-361 and 50-362 '

Diesel Generator Annual Report - 1994 San Onofre Nuclear Generating Station, #

Units 2 and 3 The purpose of this letter is to provide the Emergency Diesel Generator Annual  !

, Report for 1994. The report is required by Technical Specifications 4.8.1.1.3 and 6.9.1 of Appendix A, Technical Specifications to Facility Licenses NPF-10 l and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively. The report, provided as Enclosure 1, includes the seven items requested in Regulatory Position C.3.b of Regulatory Guide (RG) 1.108 as revised by Generic Letter (GL) 84-15 for one invalid test failure that i occurred in 1994. -

If you require any additional information, please let me know. I Sincerely,  ;

hlbD0 I

l Enclosure cc: L. J. Callan, Regionel Administrator, NRC Region IV i A. B. Beach, Director, Division of Reactor Projects, NRC Region IV j K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV l M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 '

J. A. Sloan, NRC Senior Resident Inspector, Units 2 and 3 ,

Institute of Nuclear Power Operations (INP0)  ;

I P  %

n / r

1 f 1

y ;. -* i i

Emergency Diesel Generator Report -

Southern California Edison Company San Onofre Nuclear Generating Station i Units 2 and 3, Docket Nos. 50-361 and 50-362  ;

Introduction The following information is provided in accordance with Technical l Specification Surveillance Requirement 4.8.1.1.3 and Regulatory Position

RG 1.108 requested information on seven items for each valid or invalid test failure. 4 Event Date: July 27. 1994

1. This event was an invalid failure of the San Onofre Unit 3 Emergency Diesel Generator (EDG) 3G002.
2. This was an invalid failure, as such no additions were made to the  !

failure statistics.

3. The EDG was manually stopped shortly after reaching full load by control room operators ~after observing smoke emanating from behind the EDG control panel. A small fire, which was immediately extinguished, and the resultant smoke were caused by a short circuit in the non-safety-related indicating circuitry for the EDG. The short circuit was caused by a broken terminal bolt on a roto test switch. The cause of the bolt fracture is believed to be due to an unusual mechanical shock.

The failed circuitry would not have caused damage to the EDG had it not been stopped nor would it have prevented the EDG from fulfilling its engineered safety feature functions if called upon. . 4

4. The failed and/or damaged components were replaced and tested. A satisfactory surveillance was performed on EDG following the repairs.

In addition to the component repairs, the three other EDG were inspected to ensure a similar condition did not exist.

5. The EDG was unavailable for 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> and 10 minutes.
6. EDG 3G002 was in a 31 day testing mode during this time period.
7. The surveillance test interval was in accordance with the schedule of Technical Specification Table 4.8-1. a

>