Forwards Response to Tracked Action Item 048 Re Const Implementation Overview Concerning Inconsistency Between Spec Requirements on Spacing Between Anchor Bolts of Different Diameters
ML20080K253
Person / Time
Site: Midland
Issue date: 02/07/1984
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
STONE & WEBSTER, INC.
References
CSC-7294, NUDOCS 8402150347
Download: ML20080K253 (3)


Text

-

CONSUMERS POWER COMPANY 50- S a<f MIDunD rwERc7 CENTER o

$O ' M Transmittal N?:

CSC-7294 Date: February 7, 1984 To:

Stone & Webster P O Box 1963 Midland, MI 48640 LKI 9,_-

, m #,4 3, q Attached Is

X Partial Response To

{ f, Li _J 7 ~~~

}

kf-M

'_.L

', ~ (

0 Complete Response To

[

,. w - {., ~. l

- ~~ ~~

For Your Information y

Other

==

Description:==

Tracked Action Item 048.

l l

g/ Signatures cc JCKeppler, NRC Region III w/a JJHarrison,'NRC Region III w/a RJCook, NRC Site w/a RAWells, MPQAD w/a BHPeck, MEC w/a NIReichel, MEC w/a DDJohnson, }EC w/8 I

bbf I I j

DOSfo!o0$$$9 FEB 101984 PDR

}~

=

o Sheet 1 of 1 ITEM NUMBER l HOLD POIN STONE & WEBSTEN 94g CONSTRUCTION !MPLEMENTATION O TRACKED ACTION ITEM O TRACKED INFORMArlON ITEM N/BldNP NOCIE4R pl4NT./.0. NO. /4 SOS O TRACKED RECOMMENDATION ITEM REFERENCE (S)

O UNTRACKEDITEM f

O HOLD POINT NOTIFICATION CONDITION DETAILS An inconsistency exists between specification requirements on the spacing between anchor bolts of different diameters.

The spccifications in question are:

C-305 - Design, Furnish, Install & Test Expansion Type Anchor Bolts C-306 - Design, Furnishing and Installation of Grouted Anchor Bolts The inconsistency resulted from the issuance of SCN 13007 against Specification C-305.

Please advise CIO of completion of corrective action in order that the item can be tracked and closed if the corractive action is satisfactory.

O vES 'It."!,

x NO ATTACHMENTS DATE RESPONSE REQ'D.

INITI OR/DATE INITIATION APPROVED /DATE January 23, 1984

.p e//////

gd[-

Ng-gy'

RESPONSE

The attached response, Bechtel Letter BcCC-8987 dated February 6, 1984 has been evaluated by CPCo SMO and is considered an appropriate course l

of action to resolve r.his issue. A copy of SCN No 14001 to Spec 7220-C-306 will be provided to you upon iesuance.

l 0 veS ro'.?s',

O nO ATTACHMENTS EST. CORRECTIVE ACTION RE D NT TITLE DATE COMPLETlON DATE a.;7-/

cf h

"W f

~

RESPONSE ACCEPTED DATE RESPONSE VERIFIED / CLOSED DATE l

G t

h a

i Bechtel Power Corporation e

Post Office Box 2167 Midland, Michigan 48640 Februdry 6, 1984 Consumers Power Company P.O. Box 1963 Midland, Michigan 48640 Attention:

D. L. Quamme Site Manager Midland Plant Units 1 & 2 Bechtel Job 7220 REVIEW 0F STONE & WEBSTER'S LCP OVERVIEW REPORT NO. 48 BCCC-8987

Dear Mr. Qua ce:

Detailed below is our complete response to Stone & Webster's concern with an inconsistency, which currently exists between Spac. 7220-C-305 and Spec. 7220-C-306.

To alleviate the present inconsistency caused by SCN C-305-13007 between Spec. 7220-C-305 anc' Spec. 7220-C-306; relative to anchor bolt spacing.

Bechtel Project Engineering is preparing an "SCN (Specification Change Notice) No. 14001 for Spec. 7220-C-306.

The forecast date, for issuance and attachment to Spec. 7220-C-306 is February 14, 'i984.

The forecast date, for incorporation into the text of Spec. 7220-C-306 is March 30, 1984.

you have any questions concerning the above, please contact J. E. Russell at extension 7240.

Very truly yours, 4m A hwp G. A. Hierzer GAH/JTM/

WH/ajd cc:

N. Reichel Written Response Requested: No