.Q STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325, BOSTON, M ASSACHUSE'TTS O2107 Sb 53)
$b-330 Mr. D. L. ')uamme
@ @ pyte TA984 s
Consumers Power Company A rR'J:t.P Midland Nuclear Plant
-c gja3 3500 E. Miller Road gjpg
,ose Midland, Michigan 48640 ac m^
D' aAo ics
_k
Subject:
Docket No. 50-329/330 gia s
Midland Plant - Units 1 and 2 g-
, File lu Overview of the Construction Completion Program Serial No. SWMCP-029 Re:
FCR/FCN Review CIO Hold Point No. 011 CIO has completed a review of FCR/FCN's for the mechanical discipline and considers the results of this review to be satisfactory.
. This releases CIO Hold Point Number 011 in its entirety.
hk f'IOProgramManager
'. E. Karr C
FB/nl CC L M Keppler, US NRC Glen Ellyn, IL JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
RAWells, CPCo Midland (site)
RBKelly, S&W APAmoruso, S&W FEB 13 tJB4 8402150322 840200 PDR ADOCK 05000 1
STONE AND WEBSTEFI MICHIGAN,INC.
P.O. BOX 1983, MIDLAND, MICHIGAN 48640 J
a. F-J V oars
' * *
- 14509
. o. "* N/A l'" ** SWOC - 1v-Ca 'l f ** "-
N/A
'(
DEAR SIRS:
'\\
twe ouowns ans O avvaewso; O. se *=arsten To
.D.'L. QUAMME,' COCO Midland (site)
-,c.o, u.
co iss _ mms e wooucietas _ a s= Tune canos sACu o-O==awi~as O s se.icatio~s J
O occu==-s O ~ ores o.co-e s~es
,, =.
STATUS l
PLEASE NOTE l
SENT FOR YOUR O
-a6 O a oveo 10 asvisio~s O o-issio~s O a o a6 0 co--..a
- O su -a v O a o as svissol af,'l,'s',"'*,,,,,,
O aoomo~s O co s=rio~s O us.
O - o -avio~
j O ~o co - ~t O u~ ace. vasta I
O co-. Ts O
- m. its.
O co-cuan~cs i i
hoossv,oos. ~enso 00 CLOSED O
I I YOUR ATTENTION IS DIRECTED TO THE FOLLOWING:
asLa ASED foM; O is..catio~ O u e-ass or ~ect sa- =aviaia's O teams==viss
~o su==ir
~~rs -
s-oosci=t==
-ic es-s tuas caaos.
mems as mooucisi.ms
-ir,no i6 a e=tums canos o-C oocu-s~rs O omawmes O sso orvai6 -
D Laans sue-rr O teass'asvu ~ o~s co, sac o 1-= =ars-a'==aa-a voua a - o au== co--.=>
- l O osase ae ~o-teoas ascei v o v-s -avsa 46 av sea ~~a a~o aavu ~ as var sae' esso co, o v >=
o==.
O - v uq vaar vaens ~orsa a s - acco oa~es wna
>u= u~os==va~o== i aov. Lease aovins us saouto a', navisio, to occu-swa on omewmas navu=~so usanwn= mvotva a =cs mensass two su= usa -ust ~over-sto~a e
~
IMPORTANT wassten uncwasma on a t-e~v wnnm ve~ sion oars sys~ vnous.e a os mns asvi-ava ca=~or si osva~ av vna vous. ornamess. tas
- unenassa mu co~siosa vue svisio~s -aos wn-out cost.
4
=
,. =
The'following Closed CIO Item / Hold Point Notificatice(s) is (are) attached for
~
\\
\\
your action /information:
/'
/
_.L-fe.vA ' M O' 8
J. E, Karr CIO Program flanager cc: d eppler,.US NRC _
4 JJHarrison, US NRC' RJCook,USNR(
'~
RAWells, CPCc-CIO Site File' e m ss
Sheet 1 of 2 LD POINT NUMBER l
'E"'j;U"*ERlH STONE & WEBSTER g
CONSTRUCTION IMPLEMENTATION O TRACKED ACTION ITEM OVERVIEW N/BldNB Nucle 4R pl4NT./.0. NO. /4509 7gACKED RECOP P. E DA OfITEM REFERENCE (S)
O uNTRA :xED iTEu
~
CPCo Memo, CSC-7119 of 1?/23/81 (conv attachorn O HOLD POINT NOTIFICATION CONDITION DETAILS The following documents discuss Q and/or Q-interface CWP's/ items:
- 1) FPG-7.300, Rev. 3 " Construction Work Plans (CWP)"
- 2) MPQAD Procedure T-3, Rev. 1. " Control, Release and Handling of Construction Work Plans (CWP) and Quality Work Packages (QWP)"
- 3) CPCo " Ground Rules for Construction Work", dated June 2, 1983 In discussing the above with CPCo personnel, the following was noted:
- 1) Q-interface work may or may not require inspection.
- 2) The inspection /non-Inspection guideline in use presently by the TQR's/MPQAD QCE's is a handwritten list.
X YES 7."E 1 U NO SEE SHEET 2 0F 2
/
ATTACHMENTS
/
/
INI AJ J APPROVED /DATE DATE RESPONSE REO'D.
INIT TE 2-6-84 i
. a) }l l/$0/ 0f
/-ys.g c/
v
/
RESPONSE
A) CPCo attached letter CSC-7229 dated January 31, 1984 is consumers Power Company's complete response to Item #05n.
B) The above referenced memo CSC-7119 dated December 23, 1983 is not a issue in Item #050.
^ YES b
NO o s ATTACHMENTS
' EST. CORRECTIVE ACTION RESP ND T
TITLE DATE a
t
% fv y d/7 COMPLETION DATE RESPO?p&E kI DATElR/PY
/
IED/ CLOSED RESPONS CCEPTED DATE X/
u A
c-H 2
4
Item Number 050 CONDITION DETAILS (continued)
Sheet 2 of 2 1
- 3) There is no specification /PQCI/ Procedure which establishes which Q-interface items receive or do not receive inspections. Thus, there is no design / engineering consideration being given to l
the present inspection /non-inspection guidelines.
Plesse advise CIO of the resolution of this condition where there is no formal direction for which Q-interface items do or do not require inspection.
NOTE: The subject above was addressed prior to utilization of this reporting form. As such, this information item is being issued as a tracking mechanism.
b e
Item Number 050 Sheet 1 of 1 To '
DTPerry', P14-300
/"N FaoM BHPeck, Midland Energy Cente CODSumBdi DAtc December 23, 1983 Povver C0mpany Sus. stet MIDLAND ENERY CENTER GWO 702'O "Q"-NON "Q" INTERFACE lile:
0939, 0655 U7li' 42*10, 9?*03 clNlllI,,n,
Serial:
CSC-7119 53*50*04 cc RJErhardt, P14-113A NIReichel, MEC LScibson, P24-616 DDJohnson, 2EC DLQuamme. MEC At the present time there is njt cicer statement concerning permissible "Q"-Non "Q" interfaces for Q-Commodities in the design / installation specifica-
.tions and procedures.
This problem surfaced during a Stone & Webster CIO review of pipe supports, which disclosed that Bechtel did not state in any specification or procedure that a "Q" pipe support cannot be attached to a non "Q" element even though this is. an understood non-written guideline for H5nger Engineers.
To resolve this issue you are asked to perform the fo11ov.
ing Have Bechtel develop a generic statement concerning "Q"-Non "Q" inter-faces and submit it to Project Engineering and SMO for concurrence by Janu r, 16, 1984.
Consumers concurrence to Bechtel should.be within ten working
. days after receipt of generic statenent.
Once this generic statement is approved. Bechtel' should be directed to place that statement, in all applicable design / installation specifications and
. procedures by April,15, 1984.
Should you have questions, please contact TASpelean at Ext. 6411.
e h
~.-
6AA. D 3
A+tubert 2.
htd lah b
';;=>
3 00nsumers h*[h{
Oean L Quamme
.(/
)
I d'
\\%
Uall Gnay Midland Propet
,yg 3he Moncter w
Midland Project PO Boa 1963. Midland. MI 48640. (5171 631 8650 January 31, 1984 Mr G A Hierzer Bechtel Power Corporation P O Box 2167 Midland, MI 48640 MIDLAND ENERCY CENTER GWO 7020 Q-INTERFACE CWP POLICY STATEMENT File: 0456, 0655 Bl.l.7 UIF 99*08, 53*50*04, 12*50 Serial: CSC-7229 Recen'tly Stone & Webster had a concern about what inspections were necessary for Q-Interface CWPs.
This was a result from a Stone & Webster representative having discussions with various Field Engineers and Team Quality Reps on the Teams.
The result of these discussions indicated that there was some confusion among these Team members as to what was the purpose of a Q-Interface CWP, what work was required to be inspected and also where to find these requirements.
It was agreed by Consumers" Site Management and Stone & Webster that a policy
~
statement 'should be distributed to the Teams. -The attached policy statement should be distributed to all System / Area Teams for their immediate notification. Team Supervisors and Lead TQR should ensure that all Team members receive a copy and that the Field Engineers and Team Quality Reps fully understand all aspects of Q-Interface CWPs, If any questions still re=ain, the Team should contact their CPCo Construction Engineer for further clarification. This action should be completed by February 8, 1984.
Furthermore, this policy statement should be
. incorporated in MPQAD Procedure T-3 and FPG-7.300 as an attachment.
This will ensure that any personnei tr: quiring training in either of these procedures in the future will be instructed as to the purpose of Q-Interface and how to determine what
-inspections are necessary.
The attabhed policy statement's development was coordinated with Bechtel and MPQAD.
/
-DLQ/DLH/klp 2g t c 3m C. N,
JC t
cc RAWelis, MPQAD BHPeck, MEC DDJohnson, MEC N1 Reichel,IGC JChristy,-MPQAD JReins'ch,-EPCo
,.-,,,w,
,,--we---
e,
,,--,,-,,,,,-,..,-.p,
,-,w.w,,ne--m,nn-,,.r,--n-y, v
-,,np e,,r.-
a
[
.1.7GA OSb
~
w"[
AtAt 1.
%*4t M 2.
To Bechtel Systen/ Area Team Members r(
From
~ P o S M I$ia ent
~
Date January 27, 1984 Subject -Q-INTERFACE CWP POLICY STATEMENT Q-Interface is a word coined by Consumers Power Site Management.
Its purpose is to ensure that any work which comes in contact with a Q Commo31ty or renders a Q Commodity inaccessible, is ultimately controlled by Consumers Site Management.
Q-Interface CWPs in an area will be discontinued at cocoence-ment of Phase II of the CCP.
The reason CPCo requires control of these Q-Interface CWPs is teo-folds (1) to ensure that the installation of a commodity will not conceal Q items that need verification inspection and (2) to ensure that the work activities being done does not violate Phase I controls set up by CPCo & the NRC.
These centrols are being incorporated into Section 7 of FPC-7.300 Rev 4, and are delineated in the CCP Confirmatory Order.
(These controls were formally referred to as the
" Ground Rules".)
Actual work that is performed in the field is Q or Non-Q.
CWPs are oarked is Q-Interface only as a nanagement tool to ensure that the above requirements are. met.
Some Non-Q work performed by a Q-Interface CWP may have progracmatic QC hold points which are addressed in the PQCI.
The Field Engineer will fill out a CWP in accordance with FPG-7.300 and make the determination of which block (Non-Q, Q-Interf ace or Q) to check based on drawings and specifications in which he is working with.
Hold points are assigned based on the applicable specifications and the PQCI.
- ihis is des-cribed in Section 4.5.3 of the Construction Completion Program.
The Teau Quality Representative receives the Q-Inter face or Q CWP following the initfal preparation and reviews the hold points ensuring the requirecents of the PQCI are met, per FPG-7.300 and MPQt.D Procedure T-3.
The TQR shall not sign the CWP nrtil all quality planning is complete.
Once all the above items are completed per applicable specifications and procedures the Q or-Q-interface CWP is ' forwarded to CPCo Site Management Office for review and sign-off.
.