Forwards Proposed Changes to TS 3.8.2.1 & 3.8.3.1 Re 125 Vdc Vital Instrumentation & Control Power Sys Circuit Breakers Replacement,In Response to Electrical Distribution Sys Functional Insp Conducted in Jul 1991,technical Concern
ML20080K178
Person / Time
Site: McGuire, Mcguire  
Issue date: 02/23/1995
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20080K181 List:
References
NUDOCS 9502280406
Download: ML20080K178 (4)


Text

11 1

DuktIbicerCompany T. C hlchitmv hicGuire Nuclect Generation Department

\\1re hesident 12iOO11 agers FerryRoad(htGulW)

(704)STS4800 Iluntenville, NC280784985 (704)8G4809 Fax DUKEPOWER February 23, 1995 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk washington, D.C.

20555

Subject:

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Proposed Technical Specification Amendment 125 VDC Vital Instrumentation and Control Power System Circuit Breakers Replacement TSs 3.8.2.1 and 3.8.3.1

Dear Sir:

Pursuant to 10 CFR 50.4 and 50.90, please find attached (Attachment 1) proposed license amendments to Appendix A (Technical Specifications) of Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station.

The proposed changes provided by this submittal are needed to allow installation of a modification to replace the battery, main and tie breakers in response to a Electrical Distribution Systems Functional Inspection (EDSFI), conducted by the NRC in July 1991.

The technical concern is that the existing breaker arrangement could result in a trip of both the battery and main breakers if a fault occurs on one of the 125 VDC panelboards.

By letters dated September 27, 1991, December 12, 1991 and August 26, 1994, McGuire Nuclear Station committed to have these breakers replaced in 1995 with a better coordinated design to eliminate the concern.

The specific TS Sections being revised are TS 3.8.2.1 and TS 3.8.3.1. contains the revised TS pages indicating the proposed changes.

contains the technical justification for the proposed changes. contains the safety analysis.

Pursuant to 10 CFR 50.91, Attachment 4 provides the analysis performed in accordance with the standards contained in 10 CFR 50.92.

This analysis concluded that the proposed amendments do not involve a significant hazards consideration.

By copy of this submittal, this amendment request application and No Significant Hazards Consideration Evaluation are being forwarded to the appropriate North Carolina State Official.

9502280406 950223 PDR ADOCK 05000369 P

PDR

  1. 0 nma ca nxymma i

.s U.S. Nuclear Regulatory Commission February 23, 1995 Page 2/4 We request that the proposed changes be approved as soon as possible so that we can proceed immediately with the implementation of this modification in order to complete it prior to the start of the Unit i refueling outage scheduled for 12/07/95.

The modification will need to be implemented in four separate parts, one part at a time for each channel of the system, with the time between the parts used for planning.

If i

this modification is not started in the first four months of 1995, McGuire will not be able to support the completion of the i

modification by 12/07/95.

The time between now and 12/07/95 is the best time for McGuire to implement this modification.

Please contact P.

T. Vu of McGuire Regulatory Compliance group at (704) 875-4302 if there are any questions regarding this license

~

amendment submittal.

4 1

Very truly yours, l

o 9

T.C. McMeekin Attachments xc: (w/ attachments)

Mr.

S.D.

Ebneter Administrator, Region II U.S. Nuclear Regulatory Commission Mr. V. Nerses Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mr. G. Maxwell NRC Resident Inspector McGuire Nuclear Station 4

Mr. Dayne Brown, Chief North Carolina Division of Radiation Protection

s U.S. Nuclear Regulatory Commission February 23, 1995 Page 3/4 T.C. McMeekin, being duly sworn, states that he is Vice-President i

of Duke Power Company; that he is authorized on the part of said company to sign and file with the U.S. Nuclear Regulatory Commission these revisions to the McGuire Nuclear Station license Nos. NPF-9 and NPF-17; and, that all statements and matters set forth therein are true and correct to the best of his knowledge.

Whfdf T.C. McMeekin, Site Vice-President e

Subscribed and sworn to before me this 23rd day of February 1995.

Notary Pu

\\

My Commission Expires:

lly Coihmission Expires September 29,1996 l

l

,.~.-...-..,ma en c m..--

o U.S. Nuclear Regulatory Commission February 23, 1995 Page 4/4 bxc: (w/o attachments)

B.J..Dolan J.E.

Snyder R.A. Jones (MG010P)

A.C. Williams (MG01EE)

W.N. Matthews (MG01EE)

D.

Jamil (MG01EE)

K.D. Thomas (MG02EE)

L.S. Reed (MG02EE)

M.K. Nazar (MG01IE)

R.B. White (MG01VP) s R.W. Kirk (MG01SE)

B.M. McDowell (MG01WC)

C.W. Whitlock (MG02EE) bxc: (w/ attachments) 1 A.V. Carr (PB05B)

G.

Peterson (EC07I)

G.A.

Copp (EC05N)

ELL (EC050) 3 Z.L. Taylor (CN01RC)

J.E. Burchfield (ONO3RC)

MNS RGC Tech. Spec. Subject File j

i l

.