ML20080K117
| ML20080K117 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/13/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20080K033 | List: |
| References | |
| NUDOCS 8402150304 | |
| Download: ML20080K117 (2) | |
Text
O.
Duxic Pow 1:n Godriwxy I'.O. ISOX W)18D II AI. II. TUCKElt TE LE PflONF January 13, 1984 (7o s) : ira-4n:ii u e ear.m,,,
,.m.u..,,,,m,,
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30393 Re: RII:NE 50-413/83-36 50-414/83-31
Dear Mr. O'Reilly:
My letter of December 15, 1983 transmitted a response to Violation No.
413/83-36-01, 414/83-31-01 as identified in the above referenced inspection report. Please find attached a revised response to this violation.
Very truly yours, Wb Hal B. Tucker LTP/php Attachment cc: NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
Attorney-at-Law P. O. Box 12087 Charleston, South Carolina 29412 i
Palmetto Alliance l
2135 Devine Street Columbia, South Carolina 29205 l
l l
8402150304 840206 PDR ADOCK 05000413 G
\\
g-g Catawba Nuclear Station Revised Response Violation No. 50-413/83-17-01 50-414/83-16-01 In the Corrective Acticn section of the response, the following items are revised:
Step 4) QA Procedure QA-140, Quality Assurance Inspector Certification, will be revised to specify that practical examinations will be administered by the Level III Examiner or a designated Level II Inspector within the same discipline. This designation shall be in writing by the Level III Examiner.
Step 5) Full compliance will be achieved by February 10, 1984.
l l
i
\\
l l
..