Text
....
11I B
O VYNPS b e.
Oca go TABLE 3.2.1 (Cont) 3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION O
- 1 6
v2 High Pressure Coolant Injection System g
~ke" Minimum Number of Operable Instrument Required Action When Minimum l
Channels per Trip Conditions for Operation are System Trip Function Trip Level itettig Not Satisfied 2 (Nete. 3)
Low-Low Reactor Vessel Same as LPCI Note 5 Water Level 2 (Note 4)
Low Condensate Storage
> (-)2 inches Note 5 l
Tank Water Level 2 (Note 3)
High Drywell Pressure Same as LPCI Note 5 i
1 (Note 3)
Bus Power Monitor Note 5 1 (Note 4)
Trip System Logic Note 5 2 (Note 7)
High Reactor Vessel 1 177 inches above top Note 5 Water Level of enriched fuel 1
Amendment No. 68 38 4
w j
i
...___.1
VYNPS TABLE 4.2.1 (Cont)
High Pressure Coolant Injection System Trip Function Functional Test (8)
Calibration (8)
Instrument Check Low-Low Reactor Vessel Water Level (Note 1)
Once/ operating cycle Once each day l
Low Condensate Storage Tank-(Note 1)
Every 3 months I
Water Level High Drywell Pressure (Note 1)
Once/ operating cycle Once each day Bus Power Monitor (Note 1)
None Once each day I
Trip System Logic Every 6 months Every 6 months (Note 2)
(Note 3) l, Amendment No. 58, 76 52 1
l e
,_