Gimmonweahh Idimn Company flyron Generating Station y',
4150 Nonh German Cimrt h Road y.
11yron, IL 61010-979i Tc1 H15-24i s 441 February 9, 1995 LTR:
BYRON 95-0063 FILE:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulacory Commission Washington, D.C.
20555 ATTN:
Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period January 1 through January 31, 1995.
Sincerely,
/
~
G. K. Schwart Station Manager Byron Nuclear Power Station GKS/RC/rp cc J.B. Martin, IRC, Region III imC Resident Inspector Byron IL Dept. of Nuclear Safety Regulatory Services Manager Nuclear Fuel Services, PWR Plant Support D.R. Eggett, Station Nuclear Engineering INPO Records Center G.F. Dick, Jr. - USNRC F. Yost - Utility Data Institute, Inc.
c. c r~ ;*. ' }
- ,i b w
- 9502280280 950131 PDR ADOCK 05000454 R
I PDR (9928MM/020995/1)
I i
u m<om n,mn ny s
L _u
- 1 r.,,
r d
r i.
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 t.
?
F MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY r
NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 6
LICENSE NO. NPF-37 LICENSE NO. NPF-66 I
1 l
l I
(9928MM/020995/2)
I
m
^*
' u ;,
I.
~ Monthly Reoort for Byron UNIT 1 for the month of January 1995 A.
Summary of Operatina Experience for Unit 1 The Unit began this reporting period in Mode 1 (Power Operations).
5 (9928MM/020995/3)
ll l~
[ B.
OPERATING DATA REPORT f,i DOCKET NO.:
050-454 UNIT:
Byron One DATE:
02/09/95~
COMPILED BY:
R. Colglazier TELEPHONE:
(815)234-5441 x2282 g
OPERATING STATUS
}
'f
'1.
. Reporting Period: January, 1995 Gross Hours: 744
)
'2.
Currently Authorized Power Level 3411 (MWt) l O
Design Electrical Rating: 1175 (MWe-gross) j Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity 1105 (MWe-net) 3.
Power Level to Which Restricted (If Any) : None 4.
Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
744 744 82,201 j
6.
Rx Critical Hours 744 744 68,729.3 l
7.
'Rx Reserve Shutdown Hours 0
0 38' I
8.
Hours Generator on Line 744 744 68,014.2 9.
Unit Reserve Shutdown Hours 0
0 0
a
- 10. Gross Thermal Energy (MWH) 2,356,851 2,356,851 206,399,840
- 11. Gross Elec. Energy (MWH) 803,836 803,836' 69,782,118
- 12. Net Elec. Energy (MWrf) 766,116 766,116 66,121,345
- 13. Reactor Service Factor 100
-100 83.61
-14.
Reactor Availability Factor 100 100 83.66 l
- 15. Unit Service Factor 100 100 82.74-
- 16. Unit Availability Factor 100 100 82.74
- 17. Unit Capacity Factor (MDC net) 93.19 93.19 72.80 i
- 18. Unit Capacity Factor (DER net) 91.94 91.94 71.82 l
- 19. Unit Forced Outage Hrs.
0 0
1,794.5
- 20. Unit Forced Outage Rate 0
0 2.57
- 21. Shutdowns Scheduled Over Next 6 Months: None i
22 'If Shutdown at End of Report Period, Estimated Date of Startup: None j
23.' Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(9928MM/020995/4) i
y N.
1 C.
AVERAGE DAILY Uf7IT POWER LEVEL r
DOCKET NO.:
050-454 q
UNIT: -Byron One DATE:
02/09/94 i
COMPILED BY:
R. Colglazier TELEPHONE:
(815)234-5441 j
x2282 MONTH: January, 1995 f
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
1073 MW 16.
1092 MW 2.
1071 MW 17.
1088 MW 3.
1045 MW 19.
1087 MW 5.
350 MW 20.
1086 MW 6.
288 MW 21.
1091 MW 7.
1088 MW 23.
1089 MW 9.
1084 MW 25.
1085 MW 11.
1087 MW 26.
1084 MW 12.
1087 MW 27.
1080 MW 13.
1091 MW 28.
1091 MW 14.
1090 MW 29.
1081 MW
- 31. _
1076 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)
In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(9928MM/020995/5)
j...
9 ]
R; port Period: January, 1995 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 1)
No.
Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 1
01/04/95 F 65 H
5 SD Chemistry Clean Up Of The Steam Generators Summary
- e*************
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refuel -g H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet-E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
(9928MM/020995/6)
'i;;- :,,
.. rj - _,-
=
,ES '!.
E.
UNIOtm REPORTTNG REOUTRRMRNTS (UNIT 11'for the month of January, 1995
. c i
I II.
.'afety/ Relief valve. operations for Unit One.
s i
VALVES NO is TYPE PLANT-DESCRIPTION
[
DAIR ACTUATED ACTUATION CONDITION OF EVENT I
None l
?
2.
. Licensee generated changes to ODCM.
None s
e 3.
Indications of failed fuel,
. No.
Fuel Reliability Indicator:
FRI = 4.4 E-4 pCi/CC (9928MM/020995/7)
8>_
- u.,
. r-n " y,'5 L :
up;;, n
- e.
F;q..,
y-
- P.
i e -
LICENSEE EVENT' REPORTS (UNIT'1)
D'.*i n;:
jo D
_ The: following is a tabular 'sunnary of all Licensee Event Reports for
]
-. Byron Nuclear l Power Stationi Unit One, occurring during the reporting period,
.i
- January 1,11995 through January 31, 1995.
This'information is provided pursuant..
' to the~ reportable occurrence reporting. requirements as set'forth in 10CFR 50.73.
j
/-
Occurrence Licensee EventJoort Number 231g Title of Occurrence
' i
-454:95-002 01-31-95 LER 95-001 RWST Hatches' alarms removed without verification of alternate means of.
I security.
.. i
+
1 t
~,
i I
}
r e
.3 h
l
?
I t
.E l
'(9928MM/0:0995/8) j I
i p'p g
r g
-p 4
h,ET,. l' nw. -.
y t
.u; r
6
..s :
(-.'.
~
1995' j'* f fIIi; Monthly Renort for Byron' UNIT 2 for the month of January
.; e-s y
c' A.
Summarv of Operatina Exnerience for Unit 2 i
.~
LThe Unit' began this reporting period in Mode 1 (Power Operations).
'h
.,_g I'
r If; t
t
,.g L.
I f,
h l.
r 9
t Y
f r
T f
I l
p:
i' (9928MM/020995/9)
%I hh ss
-~
y y*
M~'
B.
OPERATING DATA REPORT l
P
' DOCKET NO.:
050-455 UNIT - Byron Two.
y
.DATEi 02/09/95i
'j
^*
^
COMPILED BY:
R. Colglazier' 1
TELEPHONE:
(815)234-5441 x2282
~
" OPERATING STATUS.
'1.,' Reporting Period
-January, 1995.
Gross Hours:.744-
-2.
~ Currently Authorized Power Level 3411 (MWt).
Design Electrical Ratingi-1175- (MWe-gross)
{
Design' Electrical Rating: 1120 (MWe-net)
Max Dependable'Capacitys.1105 (MWe-net)
'3.
Power Level to which Restricted (If Any): None
{
i 4.
. Reasons for Restriction (If Any) : N/A i
THIS MONTH YR TO DATE CUMULATIVE
- i 5.
Report Period Mrs.
744 744 65,305 6.
Rx Critical Hours 744 744 57,259.4 7.
Rx Reserve Shutdown Hours 0
0 0L
,0.
Hours Generator on Line 744 744 56,653.8 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH)
,2,291,063 2,291,063 167,274,961
- 11. Gross'Elec. Energy (MWH) 790,928 790,928 56,925,112
- 12. Net Elec.. Energy (MWH)-
753,651 753,651 54,041,048
i 13.' Reactor Service Factor 100 100 87.68
- 14. Reactor Availability Factor 100 100 87.68.
- 15. Unit Service Factor 100 100 86.75
- 16. Unit Availability Factor 100 1001 86.75-
- 17. Unit Capacity Factor (MDC net) 91.67 91.67 74.89
- 18. Unit Capacity Factor (DER net) 90.44 90.44 73.89
- 19. Unit Forced Outage Hrs.
0 0
1,399.2
- 20. Unit Forced Outage Rate 0
0 2.41.
- 21. Shutdowns Scheduled Over Next 6 Months:
1 (B2R05)
- 22. If Shutdown at End of Report Period, Date of Startup: None 23.' Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
l f
t
.(9928MM/020995/10)
y
- {
'C.
AVERAGE DAILY UNIT PONER LEVEL DOCKET NO.:
050-455 UNIT: Byron Two DATE:
02/09/95 COMPILED BY:
R.
Colglazier TELEPHONE:
(815)234-5441 x2282
. MONTH: January, 1995 i
-DAY
. AVERAGE DAILY POWER LEVEL (MWe -Ne t) -
1.
1119 MW 16.
1038 MW t
2.
1116 MW 17.
1026 MW 3.
1111 MW 19.
951 MW 5.
1101 MW 20.
917 MW 6.
1092 MW 21.
983 MW 7.
1093 MW 22.
976 MW 8.
1009 MW 23.
954 MW i
9.
1094 MW 24.
944 MW i
10.
1089 MW 25.
929 MW 11.
1089 MW 26.
919 MW 12.
1079 MW 28.
899 MW 14.
1064 MW 29.
896 MW 15.
851 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures j
will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line l
(or the restricted power level line.)
In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
-(9928MM/020995/11)
- ;gg -
, (Js g...
W
..g m
' ~
N Report-Period:' January, 1995 UNIT SHUTDOWNS / REDUCTIONS BYRON
- E (UNIT 2)
't No.
Date Type Hours Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence 1
01/05/95 S
H 9
Unit Began Coastdown To B2R05 Summary TYPE Reason Method
. System & Component F-Forced A-Equip Failure F-Admin 1-Manual Fxhibit F & H-S-Sched B-Maint or Test G-Oper Error-2-Manual Scram I weructions for C-Refueling H-Other 3-Auto Scram Preparation of-D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
(9928MM/020995/12)
- ~
... ~..
-~-.. s..
.a-
~s -~
g o
E.
UNIOUE REPORTING REOUIREMENTS (UNIT 2) for the month of January 1995 1.
Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PLANT DESCRIPTION DAIK ACTUATED ACTUATION CONDITION OF EVENT None 2.
Licensee generated changes to ODCM.
None 3.
Indications of failed fuel.
No.
Fuel Reliability Indicator:
FRI = 1.8 E-4 pCi/CC (9928MM/020995/13)
. ~..
. -.. ~ ~
~.
=-
- iOhk,
- .b gl::
i.
- ..o.
>e. g -
F:
LIr' m EE EVENT REPORTS (UNIT 2)
- 1 :
Ce following is;a tabular summary of all Licensee Event Reports for
.. Byron Nuclear Power Station,. Unit'Two, occurring during the reporting' period,'
January 1, 1995 through January 31,1995..This information is provided pursuant
.to,the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence
-Licensee Event Report Number.
Dat;a Title of Occurrence 455:95-001 01/20/95 Chemistry samples missed following plant transient due to operator personnel' error.
1 l
4 L
{ 'l e
t b
a i
k L