ML20080J560

From kanterella
Jump to navigation Jump to search
Advises That Discrepancies Noted in NRC Transmitting Amends 48 & 31 to OLs Re Radiological Effluent Tech Specs Corrected within Offsite Dose Calculation Manual. Amends to Be Implemented by 840101
ML20080J560
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/21/1983
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
307A, NUDOCS 8309260392
Download: ML20080J560 (1)


Text

~

VINGINIA ELECTHIC AND POWEN COMPANY RicnxoNn,VINGINIA 20261 W.L.StanmT vic. P= ro==v September 21, 1983 Nuctuam orrmations Mr. Harold R. Denton, Director Serial No. 307A Office of Nuclear Reactor Regulation N0/JHL:acm Attn: Mr. James R. Miller, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nucicar Regulatory Commission NPF-7 Washington, D. C. 20555 Centlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 RADIOLOGICAL EFFLUENT TECHNICAL SPECIFICATIONS Your letter dated May 5,1983, enclosed Amendment Nos. 48 and 31 to the North Anna 1 and 2 Facility Operating Licenses which approved the Radiological Effluent Technical Specifications. In this letter, you also identified two minor discrepancies in the Offsite Dose Calculation Manual (0DCM). The following discrepancies were to be corrected in the next revision to the ODCM:

- An error was found in the gaseous flow diagram, in which the main condenser air ejector effluent should be substream to the vent-vent A rather than to the vent stack A.

- The process vent monitor (GW-101) has not been included in the gaseous setpoint calculation, although the monitor has been identified in the flow diagram.

It has been determined that the discrepancies that you have identified are currently correct within the ODCM. The main condenser air ejector effluent does substream to the vent-vent A rather than the vent stack A and the process vent monitor (GW-101) is included in the gaseous setpoint calculation.

Amendment Nos. 48 and 31 to the North Anna 1 and 2 Facility Operating License

!- will be implemented no later than January 1, 1984. If you have any questions, please do not hesitate to call.

l Very truly yours, 8309260392 830921 l MW

{.

t *

[ PDR ADOCK 05000338 W. L'. Stewart l

P PDR 1

l cc: Mr. James P. O'Reilly Regional Administrator Region II l Mr. M. B. Shymlock NRC Resident Inspector p

North Anna Power Station