ML20080J284
| ML20080J284 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/23/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-27686-BSK, DER-83-14, NUDOCS 8309260288 | |
| Download: ML20080J284 (2) | |
Text
_
TECSYED
- 7"'
Arizona Public Service Company P,0 00X 21666. PHOENIX, ARIZONA 85036 UD FP l2 p3 7, e August 23, 1983 i
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension for Report - DER 83-14 A 50.55(e) Potentially Reportable Deficiency Relating to Diesel Generator Protective Relays By Westinghouse Failed Due To Leaking Capacitors File: 83-019-026; D.4.33.2
Reference:
(A)
Telephone Conversation between A. D'Angelo and R. Tucker on March 16, 1983 (B)
ANPP-23504, dated April 14, 1983 (Interim Report)
(C)
ANPP-24003, dated June 8,1983 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 31, 1983.
Due to the extensive investigation and uvaluation required, it is now expected that this infomation will be finalized by November 18, 1984, at which time a complete report will be submitted.
There is no new infomation or change to the Interim Report at this time.
Very truly yours, e
s E. E. Van Brunt, Jr.
APS Vice President,
Nuclear Projects Management ANPP Project Director EEVBJr./RQT:sn ec: See Attached Page Two C., c3 ~ MY 8
B309260200 830023 PDRADOCK05000g ft 9 s
l' s
U. S. Nuclear Regulatory Commission Der'83-14 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339