ML20080G900

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1995 for Browns Ferry Nuclear Plant
ML20080G900
Person / Time
Site: Browns Ferry  
Issue date: 01/31/1995
From: Salas P, Tanya Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9502140179
Download: ML20080G900 (13)


Text

r.

c.

9 IUA Tennessee Va!!ey Authority. Post Office Box 2000 Decatur, Alabama 35609 February 7, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF JANUARY 1995 In accordance with the requirements of BFN linits 1, 2,

and 3 Technical Specifications Section 6.9.1.3, TVA is submitting the Monthly Orcerting Report for the month of January 1995 in the enclosure If you have any questions, please telephone Pedro Salas at (205) 729-2636.

Sincerely, 2

Salas Manager of Site Licensing Enclosure cc:

See page 2

$ $ b.3 u

9502140179 950131 1 }

PDR ADOCK 05000259

\\-

R PDR t

A s

4 -

-s 4

5 um:

s i

l'i t !

U.S. Nuclear Regulatory Commission Page 2 February 7, 1995 Enclosure cc (Enclosure):

Mr. Mark S. Lesser, Section Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J.

Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.

20555 11 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P.

O.

Box 10412 Palo Alto, California 94304 NRC Resident Inspector f

Browns Ferry Nuclear Plant i

Route 12, Box 637 Athens, Alabama 35611 Regional e.c ti listrator U.S. Nuc;.sa' Regulatory Commission Region II 101 Maristta Street, NW,. Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute 1200 G Street, NW Washington, D.C.

20005-3802 l

l

BNCLOSURE I

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 MONTHLY OPERATING REPORT JANUARY 1995 4

L f

! 'i i

I i

i A

'I OPERATIONAL

SUMMARY

JANUARY 1995 BROWNS FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 1 has been on administrative hold since June 1, 1985.

As a result, TVA considers that.ccrual of reporting hours is suspended since the unit has a ma.tAmum dependable capacity of 0 MWe. 'Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

q.

BROWNS FERRY 2 i

Unit 2 operated continuously during the month of January at a capacity factor of 102.6 percent and generated 832,540 megawatt hours gross electrical power.

As of January 31, 1995, Unit 2 has operated continuously for 59 days.

BROWNS FERRY _1 Unit 3 remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 3 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual of reporting hours io suspended since the unit has a maximum dependable capacity of 0 MWe, Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables, j

i t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-259 UNIT:

BROWNS FERRY 1 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 MONTH January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

_ MWe-Net)

(MWe-Net)

(

1 0

16 0

2 0

17 0

3 0

18

_.,________j. _

4 0

19

.___.___,0, 5

0 20 0

6 0

21 0

7 0

22 O

i; 8

0 23 0

9 0

24 0

10 0

25 O

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

31 0

}

\\

AVERAGE DAILY UNIT POWER LEVEL 4

DOCKET NO:

50-260 UNIT: BROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 i

MONTH January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I

(MWe-Net)

(MWe-Net) 1 1097 16 1096 2

1096 17 1091 3

1092 18 1094 4

1095 19 1091 5

1095 20 1096 5

6 1091 21 1085 7

1086 22 1096 8

1094 23 1094 9

1097 24 1092 10 1095 25

,,1095 11 1094 26 1093 12 1098 27 1093 L

13 1090 28 1090 i

14 1084 29 1094 i

15 1101 30 1092 31 1092 i

)

}-

a I

]

]

AVERhGE DAILY UNIT POWER LEVEL DOCKET NO:

50-296 UNIT: BROWNS FERRY 3 1

PREPARED BY:

T. R. Smith TELEPHONE:

(205) 729-2955 MONTH January 1995 DAY AVERAGE DhILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

I i 4

0 19 0

. i 5

0 20 0

6 0

21 0

[

7 0

22 0

8 0

23 0

9 0

24 0

h 10 0

25 0

t' 11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

31 0

+

t f

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-259 REPORT MONTH:

January 1995 UNIT: BROWNS FERRY 1 PREPARED BY:

T. R.

Smith TELEPHONE:

(2051 729-2955.

Method of License Duration Shu* ing Event System Component Cause and Corrective Action to Prevent i

No.

Date Type' (Mours)

Reason' Down Reactor' Report No.

Code

  • Code
  • Recurrence 1

n6/01/85 S

744 F

4 W inistrative hold to resolve various TVA and NRC concerns.

'M th do:

  • Instructions for Preparation of Licensee

'F-Forced

'A-Equipment Failure (Explain) e S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1D22)

C-Refueling 2-Manuel Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

.eem-eme +e mh.,

-g 3

+

y

-.c--

g r---

r m.,

-v-ey w

y

-ye-agn y,

-b.-w--

+

y, y-

4 UNIT SHUTDOWNS AND POWER hEDUCTIONS DOCKET NO:

50-260 REPORT MONTH:

January 1995 UNIT: BROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

i2051 729-2955.

Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Doesn Reactor

  • Report No.

Code' Code

  • Recurrence NA

'M th do:

" Instructions for Preparation of Licensee

'F F-orced

'A Egsipment Failure (Explain) e S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)

C-Refueling 2-Manuel Scram 0-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Redaction G-Operational Error (Explain) 9-Other M-Other (Explain) i

_tww-r 7

--+tave--

W4Amur a-at---,ew-+r w-w-vva--si---g

-y-w


4----e-r--w

+W

'Mr'i--5 1MHT4D*-

  • '-ENe'

"AT'1F 7'%

+-

Tr'-'w ww

  • 1+++-w--

.*,m s

x s

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-296 REPORT MONTH:

January 1995 UNIT: BROWNS FERRY 3 PREPARED BY:

T.

R.

Smith TELEPHONE:

f205) 729-2955.

Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Doun Reactor

  • Report No.

Code

  • Code
  • Recurrence 1

06/01/85 s

744 F

4 Administrative hold to resolve various TVA and NRC concerns.

4 F-Forced

'A-Equipment Failure (Explain)

' Method:

Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manuel scram D-Regulatory Restriction 3-Automatic scram E-Operator Training and License Examination 4-Continuation of Existing outage F-Administrative -

5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain) k ampw m y%

4wovost-

-mm-Me,en,m c- - -. ~

- ~,

e

-,.,. ~.

..,s.

m

.m

)

OPERATING DATA REPORT f

DOCKET:

50-259 UNITS BROWNS FERRY 1 j

PREPARED BY:

T.

R.

SMITH r

TELEPHONE:

(205) 729-2955 l

OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 1
2. Reporting Period: JANUARY 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Net MWe): 0
8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold t

THIS MONTE YEAR TO DATE CUNULATIVE*

11.-Hours in Reporting Period 0

0 95743

12. Hours Reactor Was critical 0

0 59521

13. Reactor Reserve Shutdown Hours 0

0 6997 i

14. Hours Generator On Line 0

0 58267

15. Unit Reserve Shutdown Houre 0

0 0

16. Gross Thermal Generation (MWh) 0 0

168066787

17. Gross Electrical Generation (MWh) 0 0

55398130

18. Net Electrical Generation (MWh) 0 0

53796427

19. Unit Service Factor 0

0' 60.9 i

20. Unit Availability Factor 0

0 60.9

21. Unit Capacity Factor (MDC Net) 0 0

52.8

22. Unit Capacity Factor (DER net) 0 0

52.8

23. Unit Forced Outage Rate 0

0 25.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A i
25. If Shut Down At End Of Reporting Period, l-Estimated Date of Startup:

To be determined

~

l l

  • Excludes hours under administrative hold (June 1, 1985 to present) i

)

7:

=

OPERATING DATA REPORT DOCKET:

50-260 UNIT:

BROWNS FERRY 2 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

{

1. Unit Names BROWNS FERRY UNIT 2 i
2. Reporting Period: JANUARY 1995
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net NWe):

1065

6. Maximum Dependable capacity (Gross MWe):

1098.4

7. Maximum Dependable Capacity (Net MWe):

1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS MONTE YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 744 744 122815
12. Hours Reactor Was Critical 744 744 82871 ii
13. Reactor Reserve Shutdown Hours 0

0 14200

14. Hours Generator On Line 744 744 80603
15. Unit Reserve Shutdown Hours 0

0 0

f

16. Gross Thermal Generation (MWh) 2446921 2446921 233615835
17. Cross Electrical Generation (MWh) 832540 832540 77575718
18. Net Electrical Generation (MWh) 813354 813354 75403190
19. Unit Service Factor 100.0 100.0 65.6
20. Unit Availability Factor 100.0 100.0 65.6 l'
21. Unit Capacity Factor (MDC Net) 102.6 102.6 57.6
22. Unit Capacity Factor (DER net) 102.6 102.6 57.6
23. Unit Forced Outage Rate 0.0 0.0 17.1 5
24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): None
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup N/A
  • Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)

l!

r l

t OPERATING DATA REPORT i

i' DOCKET:

50-296

-[

UNIT:

BROWNS FERRY 3 PREPARED BY:

T.

R.

SMITH TELEPHONE:

f205) 729-2955 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT 3 i
2. Reporting Period: JANUARY 1995
3. Licensed Thermal Power (MWt): 3293 l
4. Nameplate Rating (Gross MWe):

1152 l

5. Design Electrical Rating (Net MWe):

1065 i

6. Maximum Dependable capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Net MWe):

0

8. If changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A I
9. Power Level To Which Restricted, If Any (Net MWe):

O

10. Reason For Restrictions, If Any: Administrative Hold TEIS MONTE YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 0

0 73055

12. Hours Reactor Was Critical 0

0 45306

13. Reactor Reserve Shutdown Hours 0

0 5150

14. Hours Generator On Line 0

0 44195

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 0 0

131868267

17. Gross Electrical Generation (MWh) 0 0

43473760

18. Net Electrical Generation (MWh) 0 0

42114009

19. Unit Service Factor 0

0 60.5 i.

20. Unit Availability Factor 0

0 60.5

21. Unit Capacity Factor (MDC Net) 0 0

54.2

22. Unit Capacity Factor (DER net) 0 0

54.2

23. Unit Forced Outage Rate 0

0 21.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
  • Excludes hours under administrative hold (June 1, 1985 to present) i