D n10
's
- 1 0 C
,7,,,
INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 January 31, 1984 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/74 Docket Nos. 50-315/50-316
Dear Mr. Keppler:
Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of a high iron concentration in the heating boiler blowdown is attached.
This report is required by Amendment No.
54 to Facility Operating License No. DPR-58 and Amendment No. 40 to Facility Operating License No. DPR-74 dated May 6, 1982.
Sincerely,
<M
& W.G.
Smith, Jr.
Plant Mar.ager
/bab Attachment cc:
John E.
Dolan INPO M.P. Alexich Dir., IE (20 copies)
R.F. Kroeger Dir., MIPC (2 copies)
H. Brugger PNSRC E.R.
Swanson, RO:III J.F.
Etietzel R.C. Callen, MPSC E.L. Townley G.
Charnoff, Esq.
R.O.
Bruggee, EPRI J.M. Hennigan H.R.
Denton 8402130280 840131 PDR ADDCK 05000315 gy) l l
ffde?
- y. pap./n
. s...
e U_ *~~;'u IN0 LANA & MICHIGAN ELECTRIC COMPANY
- ONE SUMMIT SQU ARE. P. O. BOX 60. FORT W AYNE IN. 44001 Telephonet (219) 425 2111 RICilARD C. MENGE Vice President January 10, 1984
, El r* r o n Mr. Paul D. Zugger l U,-
j lq Oill 1,; jg l[
Executive Secretary Michigan Water Resources Commission dU-; D^}p b )'i Stevens T. Mason Building Box 300261 G.'M!.; f [ltfff...,<
- c.
Lansing, Michigan 48909 Re:
Donald C. Cook Nuclear Plant NPDES Permit No. MI 0005827 Boiler Glowdown l
l
Dear Mr. Zugger:
l l
With both nuclear units in operation, the plant heating boiler was started up for training purposes. A blowdown sample was collected for analysis and found. to contain 7.56 PPM iron.
Inactivity of the boiler (last used j
October 23, 1983) is believed to have been the reason for the iron level.
The boiler was only in use for training a short time.
Very truly yours, s
WW R. C. Men e Vice President RCM/be cc: ' WEG.
Ith*
I certify under penalty of law that I have personally examined and am familiar with the information, submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. ' I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.