o Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536 4000 February 7, 1984 LIC-84-031 l

l f

Mr. James R.

Miller, Chief U.

S.

Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C.

20555

Reference:

Docket No. 50-285

Dear Mr. Miller:

Spent Fuel Pool Reracking at the Fort Calhoun Station In a letter dated September 9, 1983, the Commission issued Amend-ment No. 75 to Facility Operating License No. DPR-40 for Omaha Public Power District's Fort Calhoun Station.

This amendment to the license and Technical Specifications was requested as a part of the reracking of the spent fuel pool at the Fort Calhoun Station.

A license condition was added to that amendment such that the District was required to notify the Commission in writing within two weeks after the events as to the following:

(1)

Installation date of the first new rack that contains Bora-flex (completed November 19, 1983; notified the Commission by District letter LIC-83-295 dated November 23, 1983).

(2)

Installation date of the first new rack that does not con-tain Boraflex (completed December 19, 1983; notified the Commission by District letter LIC-83-320 dated December 30, 1983).

(3)

Installation date of the last new rack.

8402130277 040207 PDRADOCKOSOOO2gg 11 90 bilo 45.5 t 24 Employment with Equal Opportunity Malefremaie I

<=

Mr. James R. Miller LIC-84-031 Page Two As a final response to this requirement, the District hereby noti-fies the Commission that installation of the last new rack was com-pleted Jar uary 24, 1984.

Therefore, as of January 24, 1984, Ap-pendix A Technical Specification 16, contained in Table 3-5, and Design Feature 4.4.2, Spent Fuel Storage, are effective.

Sincerely, W.

C.,

ones Divisaon Manager Production Operations WCJ/DJM:jmm cc:

Mr. Richard P. Denise, Director

-Division of Resident, Reactor Project

& Engineering Programs U.

S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive,-Suite 1000 Arlington, Texas 76011 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 Mr.

E. G. Tourigny, Project Manager

~Mr. L.

A. Yandell, Senior Resident Inspector l'

--